Filter interviews by
E-way bill is required for store to store transfer of goods exceeding Rs. 50,000.
E-way bill is mandatory for inter-state and intra-state movement of goods exceeding Rs. 50,000.
The person causing the movement of goods is responsible for generating the e-way bill.
E-way bill can be generated online on the E-way Bill Portal.
The e-way bill contains details such as the goods being transported, their value, and the parti...
The daily material received at the register is recorded in both DMT and Excel for tracking purposes.
DMT and Excel are used to track daily material received at the register
Recording in both systems helps in accurate tracking and inventory management
Examples: entering item details, quantity received, date and time of receipt
No, as a Site Engineer, my expertise is in construction and project management, not in manufacturing ammunition.
As a Site Engineer, my focus is on managing construction projects and ensuring they are completed on time and within budget.
I do not have any experience or knowledge in the manufacturing of ammunition or BBs.
My skills and expertise lie in areas such as project planning, site management, and quality contr...
Development length is the minimum length of rebar required to ensure proper bond strength in concrete structures.
Development length ensures that the rebar can develop its full strength within the concrete.
It is influenced by factors such as bar diameter, concrete strength, and type of stress (tension or compression).
For example, a #5 rebar in normal concrete may require a development length of around 12 inches for...
As project head, I would execute the site by overseeing the planning, budgeting, and scheduling of the project.
Develop a comprehensive project plan that includes timelines, budgets, and resources
Assign tasks and responsibilities to team members
Monitor progress and make adjustments as necessary
Ensure compliance with safety regulations and quality standards
Communicate regularly with stakeholders to keep them informe...
Tools stacking for store involves organizing tools in a systematic and efficient manner to maximize space and ease of access.
Categorize tools based on type or usage (e.g. power tools, hand tools, gardening tools)
Use shelving units, pegboards, or tool chests to store tools neatly
Label shelves or drawers to easily identify where each tool belongs
Implement a system for tracking inventory and restocking tools as neede...
I applied via Company Website and was interviewed in Nov 2019. There were 3 interview rounds.
I learned valuable skills in project management, teamwork, and technical expertise that enhanced my capabilities as a Site Engineer.
Improved my project management skills by coordinating multiple tasks and ensuring timely completion of projects.
Gained hands-on experience with construction materials and techniques, which helped in making informed decisions on-site.
Enhanced my teamwork abilities by collaborating with arch...
As project head, I would execute the site by overseeing the planning, budgeting, and scheduling of the project.
Develop a comprehensive project plan that includes timelines, budgets, and resources
Assign tasks and responsibilities to team members
Monitor progress and make adjustments as necessary
Ensure compliance with safety regulations and quality standards
Communicate regularly with stakeholders to keep them informed of ...
Development length is the minimum length of rebar required to ensure proper bond strength in concrete structures.
Development length ensures that the rebar can develop its full strength within the concrete.
It is influenced by factors such as bar diameter, concrete strength, and type of stress (tension or compression).
For example, a #5 rebar in normal concrete may require a development length of around 12 inches for tens...
No, as a Site Engineer, my expertise is in construction and project management, not in manufacturing ammunition.
As a Site Engineer, my focus is on managing construction projects and ensuring they are completed on time and within budget.
I do not have any experience or knowledge in the manufacturing of ammunition or BBs.
My skills and expertise lie in areas such as project planning, site management, and quality control.
The daily material received at the register is recorded in both DMT and Excel for tracking purposes.
DMT and Excel are used to track daily material received at the register
Recording in both systems helps in accurate tracking and inventory management
Examples: entering item details, quantity received, date and time of receipt
A monthly physical report at a store summarizes inventory status, stock levels, and discrepancies for effective management.
Conduct a physical count of all inventory items to ensure accuracy.
Compare physical counts with recorded inventory levels to identify discrepancies.
Document any damaged or expired items and plan for their disposal.
Analyze stock turnover rates to optimize inventory levels and reduce holding costs.
Pr...
E-way bill is required for store to store transfer of goods exceeding Rs. 50,000.
E-way bill is mandatory for inter-state and intra-state movement of goods exceeding Rs. 50,000.
The person causing the movement of goods is responsible for generating the e-way bill.
E-way bill can be generated online on the E-way Bill Portal.
The e-way bill contains details such as the goods being transported, their value, and the parties in...
Tools stacking for store involves organizing tools in a systematic and efficient manner to maximize space and ease of access.
Categorize tools based on type or usage (e.g. power tools, hand tools, gardening tools)
Use shelving units, pegboards, or tool chests to store tools neatly
Label shelves or drawers to easily identify where each tool belongs
Implement a system for tracking inventory and restocking tools as needed
Top trending discussions
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
To make a hotel booking app in ReactJS
Create a form to input booking details
Use a calendar component to select dates
Display available rooms and prices
Implement payment gateway
Include user authentication and booking history
I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.
Interview questions for an Associate position cover various aspects like motivation, skills, and handling pressure.
1) Tmaus: This could refer to a specific term or acronym; clarify its meaning during the interview.
2) Leaving previous job: Focus on seeking new challenges or growth opportunities, not negative experiences.
3) Technical skills: Highlight relevant skills like data analysis, programming languages, or software...
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Apr 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Apr 2020. There was 1 interview round.
Three Golden Rules are: Do unto others as you would have them do unto you, Love your neighbor as yourself, and Honor your father and mother.
Do unto others as you would have them do unto you - treat others the way you want to be treated
Love your neighbor as yourself - show kindness and compassion to those around you
Honor your father and mother - respect and appreciate your parents and their guidance
I applied via Walk-in and was interviewed before Feb 2020. There were 3 interview rounds.
Correlating in JMeter and LoadRunner
Identify the dynamic parameters in the script
Use correlation functions to extract and replace dynamic values
Verify the correlation using debuggers and log files
JMeter uses Regular Expression Extractor and LoadRunner uses web_reg_save_param
Correlation can improve script accuracy and reduce errors
Transaction/sec, hits/sec, and 90th percentile are performance metrics used to measure the efficiency of a system.
Transaction/sec measures the number of transactions processed per second.
Hits/sec measures the number of requests received by a server per second.
90th percentile is a measure of the response time of a system, indicating the time taken for 90% of requests to be completed.
These metrics are important in evalua...
I applied via Campus Placement and was interviewed before Jan 2019. There were 4 interview rounds.
OOPs programming concept is a paradigm that focuses on objects and their interactions to solve problems.
OOPs stands for Object-Oriented Programming
It emphasizes on encapsulation, inheritance, and polymorphism
Objects are instances of classes that have attributes and methods
Encapsulation hides the implementation details of an object
Inheritance allows a class to inherit properties and methods from another class
Polymorphis...
based on 1 interview experience
based on 4 reviews
Rating in categories
Civil Site Engineer
4
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Project Engineer
3
salaries
| ₹2 L/yr - ₹4.2 L/yr |