i
G R
Infraprojects
Filter interviews by
I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.
Discussion about my working and experience on site
There were three main structures in my last project: a database structure, a software architecture structure, and a project management structure.
Database structure included tables, relationships, and indexes.
Software architecture structure involved layers, components, and modules.
Project management structure consisted of timelines, tasks, and resources.
There were a total of 10 type foundation castings in my last project.
There were different types of foundation castings used in the project such as pile foundation, strip foundation, and raft foundation.
Each type of foundation casting was used based on the specific requirements of the structure and soil conditions.
The number of each type of foundation casting was determined by the structural design and engineering calcu...
I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Dec 2020. There were 3 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
posted on 16 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 19 Jan 2023
I applied via Approached by Company and was interviewed before Jan 2022. There were 3 interview rounds.
based on 6 interview experiences
Difficulty level
Duration
based on 42 reviews
Rating in categories
Assistant Manager
402
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
226
salaries
| ₹3.7 L/yr - ₹8.6 L/yr |
Deputy Manager
152
salaries
| ₹6.6 L/yr - ₹16.9 L/yr |
Engineer
138
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Structural Engineer
114
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures