i
G R
Infraprojects
Filter interviews by
To calculate re wall quantity and rate, measure the area of the wall and determine the cost per unit area.
Measure the length and height of the wall to calculate the area in square feet or square meters.
Determine the cost per unit area by dividing the total cost of materials and labor by the total area of the wall.
Multiply the area of the wall by the cost per unit area to calculate the total cost of the wall.
Exampl...
Earthwork quantity can be calculated by using the formula: Volume = Area x Depth
Calculate the area of the earthwork site (length x width)
Determine the depth of excavation or fill required
Multiply the area by the depth to get the volume of earthwork
Consider any slopes or irregular shapes in the calculation
Use software like AutoCAD or Excel for accurate calculations
Road quantity can be calculated by measuring the length, width, and depth of the road and multiplying them together.
Measure the length of the road using a measuring tape or GPS
Measure the width of the road using a measuring tape or by counting the number of lanes
Measure the depth of the road by taking samples or using ground-penetrating radar
Multiply the length, width, and depth together to get the road quantity
During a site visit for a tender, key aspects include assessing site conditions, understanding project requirements, and evaluating risks.
Evaluate site conditions: Check for accessibility, existing infrastructure, and environmental factors.
Understand project requirements: Discuss project scope, timelines, and specific client needs.
Assess risks: Identify potential challenges such as safety hazards, regulatory issue...
Output batching plant is a machine used in construction to mix and produce concrete in large quantities.
Output batching plant is used in construction to produce large quantities of concrete
It mixes different ingredients like cement, water, and aggregates to produce concrete
The machine can be computerized or manually operated
Output batching plant can produce different types of concrete like ready-mix, precast, and ...
Selecting construction materials involves considering factors such as durability, cost, and environmental impact.
Consider the purpose of the structure and the load it will bear
Evaluate the durability and lifespan of the materials
Compare the cost of different materials and factor in long-term maintenance expenses
Assess the environmental impact of the materials and choose sustainable options
Consult with architects, ...
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.
Earthwork quantity can be calculated by using the formula: Volume = Area x Depth
Calculate the area of the earthwork site (length x width)
Determine the depth of excavation or fill required
Multiply the area by the depth to get the volume of earthwork
Consider any slopes or irregular shapes in the calculation
Use software like AutoCAD or Excel for accurate calculations
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
Road quantity can be calculated by measuring the length, width, and depth of the road and multiplying them together.
Measure the length of the road using a measuring tape or GPS
Measure the width of the road using a measuring tape or by counting the number of lanes
Measure the depth of the road by taking samples or using ground-penetrating radar
Multiply the length, width, and depth together to get the road quantity
During a site visit for a tender, key aspects include assessing site conditions, understanding project requirements, and evaluating risks.
Evaluate site conditions: Check for accessibility, existing infrastructure, and environmental factors.
Understand project requirements: Discuss project scope, timelines, and specific client needs.
Assess risks: Identify potential challenges such as safety hazards, regulatory issues, or...
Output batching plant is a machine used in construction to mix and produce concrete in large quantities.
Output batching plant is used in construction to produce large quantities of concrete
It mixes different ingredients like cement, water, and aggregates to produce concrete
The machine can be computerized or manually operated
Output batching plant can produce different types of concrete like ready-mix, precast, and centr...
I applied via Campus Placement and was interviewed before Sep 2022. There were 4 interview rounds.
The test was normal and anyone can crack it easily
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
Top trending discussions
posted on 27 Apr 2022
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 29 Jul 2022
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 2 Nov 2021
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.
based on 6 interview experiences
Difficulty level
Duration
based on 98 reviews
Rating in categories
Gurgaon / Gurugram
3-8 Yrs
₹ 6.5-11.5 LPA
Assistant Manager
316
salaries
| ₹4.8 L/yr - ₹11.5 L/yr |
Senior Engineer
239
salaries
| ₹4.1 L/yr - ₹8.6 L/yr |
Engineer
135
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Deputy Manager
134
salaries
| ₹9.5 L/yr - ₹17 L/yr |
Senior Executive
112
salaries
| ₹3.5 L/yr - ₹7.4 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures