Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
posted on 29 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
I appeared for an interview in Mar 2025, where I was asked the following questions.
I have a diverse background in quantity surveying, focusing on cost management, project estimation, and contract administration.
Started my career as a junior quantity surveyor, assisting in cost estimation for residential projects.
Gained experience in managing budgets for commercial developments, ensuring projects stayed within financial limits.
Worked on a landmark infrastructure project, where I implemented cost-savin...
I appeared for an interview before May 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
posted on 11 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
based on 1 interview experience
Difficulty level
Duration
based on 5 reviews
Rating in categories
Quantity Surveyor
12
salaries
| ₹4.2 L/yr - ₹8.6 L/yr |
Senior Quantity Surveyor
4
salaries
| ₹9 L/yr - ₹21 L/yr |
Junior Quantity Surveyor
4
salaries
| ₹4.2 L/yr - ₹5.3 L/yr |
Graduate Engineer Trainee (Get)
4
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Graduate Engineer
3
salaries
| ₹3.6 L/yr - ₹3.6 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim