Criteria for cube testing include sample preparation, curing, testing age, and acceptance criteria.
Sample preparation involves properly filling the cube mold with concrete and compacting it.
Curing the cubes in a controlled environment for a specified period of time is crucial for accurate results.
Testing age refers to the duration after which the cubes are tested, typically 7 or 28 days.
Acceptance criteria vary ba...
Soil compaction testing involves using specialized equipment to measure the density and moisture content of soil.
Use a soil compaction tester to measure the density of the soil.
Take samples at different depths to ensure accurate results.
Calculate the compaction percentage by comparing the field density to the maximum density.
Check the moisture content of the soil to ensure it is within the acceptable range.
Repeat ...
Experienced Senior Quality Engineer with a strong background in software testing and quality assurance methodologies.
Over 8 years of experience in quality engineering, focusing on automated and manual testing.
Led a team of 5 QA engineers in a project that improved product release cycles by 30%.
Expert in using tools like Selenium and JIRA for test automation and project management.
Implemented a new testing framewor...
QAP stands for Quality Assurance Plan in manufacturing, outlining procedures and standards to ensure product quality.
QAP is a document that details the quality control procedures, standards, and specifications for a particular product or project.
It includes information on inspection methods, acceptance criteria, testing procedures, and corrective actions.
QAP helps ensure that products meet the required quality sta...
WPS/PQR/WPQ are documents used in welding to ensure quality and compliance with standards.
WPS stands for Welding Procedure Specification, detailing the welding process to be used
PQR stands for Procedure Qualification Record, documenting the testing and results of a specific welding procedure
WPQ stands for Welder Performance Qualification, certifying the welder's ability to perform the specified welding procedure
Th...
IR, WR, and CR are abbreviations used in different contexts. IR stands for Infrared, WR stands for Weather Resistant, and CR stands for Compression Ratio.
IR refers to Infrared, which is a type of electromagnetic radiation with longer wavelengths than visible light.
WR is used to indicate that a product or material is designed to withstand various weather conditions.
CR is a term commonly used in engineering and phys...
If battery polarity is inverse with respect to battery charger, it can lead to damage or malfunction.
Inverse polarity can cause short circuits or overheating.
It can damage the battery, charger, or both.
Reverse polarity protection circuits can prevent damage.
Always double-check the polarity before connecting the battery to the charger.
Tests done on power transformers include insulation resistance, turns ratio, winding resistance, and dielectric tests.
Insulation resistance test checks the insulation quality of the transformer.
Turns ratio test measures the ratio of primary to secondary turns.
Winding resistance test determines the resistance of transformer windings.
Dielectric tests assess the dielectric strength and insulation properties of the tr...
There are several types of earthing used in electrical systems.
The most common types of earthing are:
- TN-S system: Separate neutral and protective earth conductors
- TN-C system: Combined neutral and protective earth conductors
- TN-C-S system: Combination of TN-S and TN-C systems
- TT system: Separate earth electrode for each electrical installation
- IT system: No direct connection between earth and neutral
Each typ...
Hipot testing is a process used to verify the insulation integrity of busbars, breakers, cables, and transformers.
Hipot testing involves applying a high voltage to the component being tested.
The purpose is to check for any insulation breakdown or leakage current.
For busbars and cables, the test is typically performed between the conductor and the ground.
For breakers and transformers, the test is performed between ...
I applied via LinkedIn and was interviewed in Jun 2023. There were 2 interview rounds.
The hipot test can be done on a cable multiple times depending on the specific requirements and standards.
The number of times a hipot test can be done on a cable depends on the cable's specifications and the testing requirements.
Generally, a hipot test is performed once during the manufacturing process to ensure the cable's insulation integrity.
However, additional hipot tests may be conducted during the cable's lifespa...
If battery polarity is inverse with respect to battery charger, it can lead to damage or malfunction.
Inverse polarity can cause short circuits or overheating.
It can damage the battery, charger, or both.
Reverse polarity protection circuits can prevent damage.
Always double-check the polarity before connecting the battery to the charger.
There are several types of earthing used in electrical systems.
The most common types of earthing are:
- TN-S system: Separate neutral and protective earth conductors
- TN-C system: Combined neutral and protective earth conductors
- TN-C-S system: Combination of TN-S and TN-C systems
- TT system: Separate earth electrode for each electrical installation
- IT system: No direct connection between earth and neutral
Each type of ...
I have handled various quality documents such as quality control plans, inspection reports, and non-conformance reports.
Quality control plans
Inspection reports
Non-conformance reports
Tests done on power transformers include insulation resistance, turns ratio, winding resistance, and dielectric tests.
Insulation resistance test checks the insulation quality of the transformer.
Turns ratio test measures the ratio of primary to secondary turns.
Winding resistance test determines the resistance of transformer windings.
Dielectric tests assess the dielectric strength and insulation properties of the transfo...
Hipot testing is a process used to verify the insulation integrity of busbars, breakers, cables, and transformers.
Hipot testing involves applying a high voltage to the component being tested.
The purpose is to check for any insulation breakdown or leakage current.
For busbars and cables, the test is typically performed between the conductor and the ground.
For breakers and transformers, the test is performed between diffe...
IR, WR, and CR are abbreviations used in different contexts. IR stands for Infrared, WR stands for Weather Resistant, and CR stands for Compression Ratio.
IR refers to Infrared, which is a type of electromagnetic radiation with longer wavelengths than visible light.
WR is used to indicate that a product or material is designed to withstand various weather conditions.
CR is a term commonly used in engineering and physics t...
Tap changer in a transformer is located on the high voltage winding side to regulate the voltage output.
Tap changer is typically located on the high voltage winding side of a transformer.
It is used to adjust the turns ratio and regulate the voltage output.
If the voltage output in the secondary decreases, the tap changer will be moved to a higher tap position to increase the voltage.
I appeared for an interview in May 2025, where I was asked the following questions.
I applied via LinkedIn and was interviewed in Jul 2024. There was 1 interview round.
Soil compaction testing involves using specialized equipment to measure the density and moisture content of soil.
Use a soil compaction tester to measure the density of the soil.
Take samples at different depths to ensure accurate results.
Calculate the compaction percentage by comparing the field density to the maximum density.
Check the moisture content of the soil to ensure it is within the acceptable range.
Repeat the t...
Criteria for cube testing include sample preparation, curing, testing age, and acceptance criteria.
Sample preparation involves properly filling the cube mold with concrete and compacting it.
Curing the cubes in a controlled environment for a specified period of time is crucial for accurate results.
Testing age refers to the duration after which the cubes are tested, typically 7 or 28 days.
Acceptance criteria vary based o...
posted on 9 Apr 2025
I appeared for an interview in Mar 2025, where I was asked the following questions.
QAP stands for Quality Assurance Plan in manufacturing, outlining procedures and standards to ensure product quality.
QAP is a document that details the quality control procedures, standards, and specifications for a particular product or project.
It includes information on inspection methods, acceptance criteria, testing procedures, and corrective actions.
QAP helps ensure that products meet the required quality standard...
WPS/PQR/WPQ are documents used in welding to ensure quality and compliance with standards.
WPS stands for Welding Procedure Specification, detailing the welding process to be used
PQR stands for Procedure Qualification Record, documenting the testing and results of a specific welding procedure
WPQ stands for Welder Performance Qualification, certifying the welder's ability to perform the specified welding procedure
These d...
posted on 17 Jun 2025
I appeared for an interview in Dec 2024, where I was asked the following questions.
QA focuses on preventing defects, while QC emphasizes identifying defects in civil engineering projects.
QA (Quality Assurance) involves processes and procedures to ensure quality standards are met throughout the project lifecycle.
QC (Quality Control) is the inspection and testing of materials and workmanship to identify defects after they occur.
Example of QA: Developing a quality management plan for a construction proj...
Ensuring quality in concrete works involves rigorous testing, monitoring, and adherence to standards throughout the construction process.
Conduct thorough material testing: Test aggregates, cement, and water for quality before mixing.
Implement mix design: Use a well-defined concrete mix design to achieve desired strength and durability.
Perform slump tests: Regularly check the workability of fresh concrete using slump te...
Experienced Senior Quality Engineer with a strong background in software testing and quality assurance methodologies.
Over 8 years of experience in quality engineering, focusing on automated and manual testing.
Led a team of 5 QA engineers in a project that improved product release cycles by 30%.
Expert in using tools like Selenium and JIRA for test automation and project management.
Implemented a new testing framework tha...
Top trending discussions
Some of the top questions asked at the Irclass Systems And Solutions interview -
The duration of Irclass Systems And Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 31 interview experiences
Difficulty level
Duration
based on 238 reviews
Rating in categories
Inspection Engineer
48
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Engineer
45
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Civil Engineer
36
salaries
| ₹2.5 L/yr - ₹7.2 L/yr |
Senior Principal Engineer
34
salaries
| ₹6 L/yr - ₹10 L/yr |
Quality Engineer
27
salaries
| ₹3.7 L/yr - ₹7.1 L/yr |
CMA CGM
Adani Ports and SEZ
Hapag-Lloyd
Mediterranean Shipping Company