KMV Projects Limited Interview Questions and Answers

Updated 9 Jun 2025
Popular Designations

18 Interview questions

A Senior Engineer QS was asked 7mo ago
Q. What is the coefficient of tile adhesive for wall cladding?
Ans. 

The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.

  • The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.

  • It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.

  • The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental c...

View all Senior Engineer QS interview questions
A Senior Engineer QS was asked 7mo ago
Q. What is the unit of skirting?
Ans. 

The unit of skirting is typically measured in linear feet or meters.

  • Skirting is typically measured in linear feet or meters

  • It is used to cover the joint between the wall and the floor

  • Commonly used in construction and interior design projects

View all Senior Engineer QS interview questions
A Senior Engineer QS was asked 7mo ago
Q. What is the productivity of one carpenter and one bar bender?
Ans. 

Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.

  • Productivity can vary based on the complexity of the task assigned.

  • A skilled carpenter may be able to complete tasks faster than an inexperienced one.

  • Efficiency of tools and equipment can also impact productivity.

  • On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200...

View all Senior Engineer QS interview questions
A Senior Engineer QS was asked 7mo ago
Q. What are the indirect costs of a project?
Ans. 

Indirect costs of a project are expenses not directly related to the specific project activities.

  • Indirect labor costs (e.g. supervision, support staff)

  • Indirect materials costs (e.g. consumables, tools)

  • Indirect expenses (e.g. utilities, rent)

  • Overhead costs (e.g. administrative expenses)

  • Insurance costs

  • Taxes

View all Senior Engineer QS interview questions
A Quantity Surveyor was asked 8mo ago
Q. What is your current CTC and expected CTC?
Ans. 

Current CTC is $60,000 and Expected CTC is $70,000.

  • Current CTC is $60,000 per annum.

  • Expected CTC is $70,000 per annum.

  • The expected CTC includes a potential increase based on my experience and skills.

  • I am open to negotiation based on the overall compensation package offered.

View all Quantity Surveyor interview questions
A Safety Executive was asked
Q. What is a safety policy?
Ans. 

Safety policy is a set of rules and guidelines implemented by an organization to ensure the safety and well-being of its employees.

  • Safety policy outlines the organization's commitment to safety and health in the workplace.

  • It includes procedures for identifying and addressing potential hazards.

  • Safety policy also defines roles and responsibilities for employees in maintaining a safe work environment.

  • Regular training...

View all Safety Executive interview questions
A Safety Executive was asked
Q. Why is safety important?
Ans. 

Safety is important to prevent accidents, injuries, and illnesses in the workplace.

  • Ensures the well-being of employees

  • Reduces the risk of accidents and injuries

  • Increases productivity and morale

  • Compliance with regulations and laws

  • Protects company reputation and avoids financial losses

View all Safety Executive interview questions
Are these interview questions helpful?
A Safety Executive was asked
Q. What are the hazards associated with working at height, and what precautions should be taken?
Ans. 

Work at height hazard refers to the risk of falling from elevated surfaces. Precautions include using fall protection equipment, proper training, and regular safety inspections.

  • Use appropriate fall protection equipment such as harnesses, guardrails, and safety nets

  • Ensure workers are properly trained on how to use the equipment and follow safety procedures

  • Conduct regular safety inspections of the work area to ident...

View all Safety Executive interview questions
A Senior Engineer was asked
Q. How do you control labor and material wastage?
Ans. 

Labor and material wastage can be controlled through proper planning, monitoring, and training.

  • Implement lean manufacturing principles to reduce waste in production processes

  • Regularly monitor and analyze production data to identify areas of improvement

  • Train employees on efficient use of materials and proper handling techniques

  • Utilize inventory management systems to track material usage and minimize overstocking

  • Imp...

View all Senior Engineer interview questions
A Senior Engineer was asked
Q. How do you calculate manpower requirements for a project?
Ans. 

Man power for work can be calculated by estimating the amount of work to be done, the time required to complete it, and the efficiency of the workers.

  • Estimate the amount of work to be done

  • Determine the time required to complete the work

  • Consider the efficiency of the workers

  • Calculate the total man hours needed by dividing the total work by the productivity rate of the workers

View all Senior Engineer interview questions

KMV Projects Limited Interview Experiences

25 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Which Concrete mix using currently at your site and also how much qty of cement & fine aggregate and coarse aggregate in that ?
  • Ans. 

    We are currently using M25 grade concrete mix at our site with a ratio of 1:1:2 (cement:fine aggregate:coarse aggregate).

    • M25 grade concrete mix is being used at our site

    • The ratio of the mix is 1:1:2 (cement:fine aggregate:coarse aggregate)

    • For example, for 1 cubic meter of M25 concrete mix, we use 350 kg of cement, 700 kg of fine aggregate, and 1400 kg of coarse aggregate

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. How do you calculate man power for work ?
  • Ans. 

    Man power for work can be calculated by estimating the amount of work to be done, the time required to complete it, and the efficiency of the workers.

    • Estimate the amount of work to be done

    • Determine the time required to complete the work

    • Consider the efficiency of the workers

    • Calculate the total man hours needed by dividing the total work by the productivity rate of the workers

  • Answered by AI
  • Q2. As per drawing I calculate total qty of work and by using thumb rule approximately calculate no. of man power required.

Interview Preparation Tips

Topics to prepare for KMV Projects Limited Senior Engineer interview:
  • Concrete
  • Steel
  • High Rise Building
Interview preparation tips for other job seekers - Don't fear face the interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About Current work profile
  • Q2. Current CTC and Expected CTC
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is $60,000 per annum.

    • Expected CTC is $70,000 per annum.

    • The expected CTC includes a potential increase based on my experience and skills.

    • I am open to negotiation based on the overall compensation package offered.

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Technical questions About quantity surveying
  • Q2. Wastage of various materials
  • Ans. 

    Wastage of materials in construction projects can occur due to poor planning, inaccurate measurements, mishandling, or theft.

    • Wastage can occur due to inaccurate measurements during cutting or shaping of materials.

    • Poor planning can lead to ordering excess materials that end up unused.

    • Mishandling of materials during transportation or storage can result in damage and wastage.

    • Theft of materials on construction sites is als...

  • Answered by AI
  • Q3. Mode of measurement Billing steps
  • Ans. 

    Mode of measurement billing steps involve determining the method of measurement and the corresponding billing process.

    • Mode of measurement refers to the specific rules and guidelines used to measure quantities of work done on a construction project.

    • Billing steps involve converting the measured quantities into monetary values based on the agreed rates and terms in the contract.

    • Common modes of measurement include SMM7, CE...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation and notice Period

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be positive about your work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. How many total station experience
  • Ans. 

    I have extensive experience with total stations, utilizing them for precise surveying and mapping in various projects.

    • Over 5 years of experience using total stations for land surveying.

    • Conducted topographic surveys for residential and commercial developments.

    • Utilized total stations for construction staking, ensuring accurate placement of structures.

    • Trained junior surveyors on total station operation and data collection...

  • Answered by AI
  • Q2. How many years of auto cad experience
  • Ans. 

    I have over 8 years of AutoCAD experience, specializing in architectural and civil engineering projects.

    • Developed detailed architectural plans for residential buildings, ensuring compliance with local codes.

    • Created 3D models for urban planning projects, enhancing visualization for stakeholders.

    • Collaborated with engineers to produce accurate construction drawings, reducing errors on-site.

    • Trained junior staff in AutoCAD ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Senior Engineer QS Interview Questions & Answers

user image indrajit pradhan

posted on 10 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the productivity of one carpenter & 1 bar bender ?
  • Ans. 

    Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.

    • Productivity can vary based on the complexity of the task assigned.

    • A skilled carpenter may be able to complete tasks faster than an inexperienced one.

    • Efficiency of tools and equipment can also impact productivity.

    • On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200-300 ...

  • Answered by AI
  • Q2. What are the indirect cost of a project ?
  • Ans. 

    Indirect costs of a project are expenses not directly related to the specific project activities.

    • Indirect labor costs (e.g. supervision, support staff)

    • Indirect materials costs (e.g. consumables, tools)

    • Indirect expenses (e.g. utilities, rent)

    • Overhead costs (e.g. administrative expenses)

    • Insurance costs

    • Taxes

  • Answered by AI
  • Q3. What is the co-efficient of tile adhesive for wall cladding ?
  • Ans. 

    The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.

    • The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.

    • It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.

    • The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental condit...

  • Answered by AI
  • Q4. What is the unit of skirting ?
  • Ans. 

    The unit of skirting is typically measured in linear feet or meters.

    • Skirting is typically measured in linear feet or meters

    • It is used to cover the joint between the wall and the floor

    • Commonly used in construction and interior design projects

  • Answered by AI
Round 2 - Group Discussion 

About my previous responsibility & why I want to leave previous Company ?

Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation & share all details.

Interview Preparation Tips

Interview preparation tips for other job seekers - All are ok & Company also is good. Only interview process is some time taking. So, please assure offering letter & then give resign present Company.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Apr 2025, where I was asked the following questions.

  • Q1. Basics of civil and thumb rules
  • Q2. Is codes of all work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Self Introduction
  • Q2. About Course Related things

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 19 Mar 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Building materials
  • Q2. Steel and slab
  • Q3. Building drowing
  • Q4. Ask एनी क्वेश्चन

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks sir 👍
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Concrete density
  • Q2. How many steel bars in circle column
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Planning Profile
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period 30
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Nov 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical running equipment
  • Q2. Dumpe,Tm, excavator
Round 3 - HR 

(1 Question)

  • Q1. डॉक्यूमेंट veryfiation

Interview Preparation Tips

Topics to prepare for KMV Projects Limited Mechanical Engineer interview:
  • Maintenance
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Experience & CTC
Round 3 - Technical 

(1 Question)

  • Q1. Experience & Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Practice good sound in Technical subject

Top trending discussions

View All
Interview Tips & Stories
6d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about KMV Projects Limited?
Ask anonymously on communities.

KMV Projects Limited Interview FAQs

How many rounds are there in KMV Projects Limited interview?
KMV Projects Limited interview process usually has 2-3 rounds. The most common rounds in the KMV Projects Limited interview process are HR, Technical and Resume Shortlist.
How to prepare for KMV Projects Limited interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KMV Projects Limited. The most common topics and skills that interviewers at KMV Projects Limited expect are Project Execution, Project Planning, Civil Engineering, Project Management and Project Scheduling.
What are the top questions asked in KMV Projects Limited interview?

Some of the top questions asked at the KMV Projects Limited interview -

  1. Which Concrete mix using currently at your site and also how much qty of cement...read more
  2. How do you calculate man power for wor...read more
  3. 2. What are the safety precaution required for height wo...read more
What are the most common questions asked in KMV Projects Limited HR round?

The most common HR questions asked in KMV Projects Limited interview are -

  1. Why are you looking for a chan...read more
  2. What are your salary expectatio...read more
  3. Share details of your previous j...read more
How long is the KMV Projects Limited interview process?

The duration of KMV Projects Limited interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.4/5

based on 43 interview experiences

Difficulty level

Easy 13%
Moderate 69%
Hard 19%

Duration

Less than 2 weeks 63%
2-4 weeks 38%
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 128 Interviews
Apco Infratech Interview Questions
3.7
 • 123 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 65 Interviews
Wood Group Interview Questions
3.8
 • 63 Interviews
Psp Projects Interview Questions
3.9
 • 59 Interviews
View all

KMV Projects Limited Reviews and Ratings

based on 672 reviews

4.2/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

4.2

Salary

3.9

Job security

3.9

Company culture

3.9

Promotions

3.9

Work satisfaction

Explore 672 Reviews and Ratings
QAQC - cluster coordinator.

Jharkhand

15-20 Yrs

Not Disclosed

Planning Engineer

Assam

6-8 Yrs

Not Disclosed

Deputy Manager - Procurement

Assam

12-15 Yrs

Not Disclosed

Explore more jobs
Assistant Engineer
203 salaries
unlock blur

₹2.2 L/yr - ₹6.2 L/yr

Engineer
76 salaries
unlock blur

₹3.7 L/yr - ₹7.5 L/yr

Senior Engineer
57 salaries
unlock blur

₹5 L/yr - ₹9.6 L/yr

Assistant Manager
52 salaries
unlock blur

₹5.4 L/yr - ₹11 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹1.9 L/yr - ₹5.5 L/yr

Explore more salaries
Compare KMV Projects Limited with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview