The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.
The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.
It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.
The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental c...
The unit of skirting is typically measured in linear feet or meters.
Skirting is typically measured in linear feet or meters
It is used to cover the joint between the wall and the floor
Commonly used in construction and interior design projects
Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.
Productivity can vary based on the complexity of the task assigned.
A skilled carpenter may be able to complete tasks faster than an inexperienced one.
Efficiency of tools and equipment can also impact productivity.
On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200...
Indirect costs of a project are expenses not directly related to the specific project activities.
Indirect labor costs (e.g. supervision, support staff)
Indirect materials costs (e.g. consumables, tools)
Indirect expenses (e.g. utilities, rent)
Overhead costs (e.g. administrative expenses)
Insurance costs
Taxes
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is $60,000 per annum.
Expected CTC is $70,000 per annum.
The expected CTC includes a potential increase based on my experience and skills.
I am open to negotiation based on the overall compensation package offered.
Safety policy is a set of rules and guidelines implemented by an organization to ensure the safety and well-being of its employees.
Safety policy outlines the organization's commitment to safety and health in the workplace.
It includes procedures for identifying and addressing potential hazards.
Safety policy also defines roles and responsibilities for employees in maintaining a safe work environment.
Regular training...
Safety is important to prevent accidents, injuries, and illnesses in the workplace.
Ensures the well-being of employees
Reduces the risk of accidents and injuries
Increases productivity and morale
Compliance with regulations and laws
Protects company reputation and avoids financial losses
Work at height hazard refers to the risk of falling from elevated surfaces. Precautions include using fall protection equipment, proper training, and regular safety inspections.
Use appropriate fall protection equipment such as harnesses, guardrails, and safety nets
Ensure workers are properly trained on how to use the equipment and follow safety procedures
Conduct regular safety inspections of the work area to ident...
Labor and material wastage can be controlled through proper planning, monitoring, and training.
Implement lean manufacturing principles to reduce waste in production processes
Regularly monitor and analyze production data to identify areas of improvement
Train employees on efficient use of materials and proper handling techniques
Utilize inventory management systems to track material usage and minimize overstocking
Imp...
Man power for work can be calculated by estimating the amount of work to be done, the time required to complete it, and the efficiency of the workers.
Estimate the amount of work to be done
Determine the time required to complete the work
Consider the efficiency of the workers
Calculate the total man hours needed by dividing the total work by the productivity rate of the workers
I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.
We are currently using M25 grade concrete mix at our site with a ratio of 1:1:2 (cement:fine aggregate:coarse aggregate).
M25 grade concrete mix is being used at our site
The ratio of the mix is 1:1:2 (cement:fine aggregate:coarse aggregate)
For example, for 1 cubic meter of M25 concrete mix, we use 350 kg of cement, 700 kg of fine aggregate, and 1400 kg of coarse aggregate
Man power for work can be calculated by estimating the amount of work to be done, the time required to complete it, and the efficiency of the workers.
Estimate the amount of work to be done
Determine the time required to complete the work
Consider the efficiency of the workers
Calculate the total man hours needed by dividing the total work by the productivity rate of the workers
I applied via Company Website and was interviewed in Sep 2024. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is $60,000 per annum.
Expected CTC is $70,000 per annum.
The expected CTC includes a potential increase based on my experience and skills.
I am open to negotiation based on the overall compensation package offered.
Wastage of materials in construction projects can occur due to poor planning, inaccurate measurements, mishandling, or theft.
Wastage can occur due to inaccurate measurements during cutting or shaping of materials.
Poor planning can lead to ordering excess materials that end up unused.
Mishandling of materials during transportation or storage can result in damage and wastage.
Theft of materials on construction sites is als...
Mode of measurement billing steps involve determining the method of measurement and the corresponding billing process.
Mode of measurement refers to the specific rules and guidelines used to measure quantities of work done on a construction project.
Billing steps involve converting the measured quantities into monetary values based on the agreed rates and terms in the contract.
Common modes of measurement include SMM7, CE...
I appeared for an interview in May 2025, where I was asked the following questions.
I have extensive experience with total stations, utilizing them for precise surveying and mapping in various projects.
Over 5 years of experience using total stations for land surveying.
Conducted topographic surveys for residential and commercial developments.
Utilized total stations for construction staking, ensuring accurate placement of structures.
Trained junior surveyors on total station operation and data collection...
I have over 8 years of AutoCAD experience, specializing in architectural and civil engineering projects.
Developed detailed architectural plans for residential buildings, ensuring compliance with local codes.
Created 3D models for urban planning projects, enhancing visualization for stakeholders.
Collaborated with engineers to produce accurate construction drawings, reducing errors on-site.
Trained junior staff in AutoCAD ...
I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Productivity of one carpenter & 1 bar bender depends on the type of work and skill level.
Productivity can vary based on the complexity of the task assigned.
A skilled carpenter may be able to complete tasks faster than an inexperienced one.
Efficiency of tools and equipment can also impact productivity.
On average, a carpenter can complete 8-12 square meters of formwork per day, while a bar bender can bend around 200-300 ...
Indirect costs of a project are expenses not directly related to the specific project activities.
Indirect labor costs (e.g. supervision, support staff)
Indirect materials costs (e.g. consumables, tools)
Indirect expenses (e.g. utilities, rent)
Overhead costs (e.g. administrative expenses)
Insurance costs
Taxes
The co-efficient of tile adhesive for wall cladding is typically around 0.5 to 0.7.
The co-efficient of tile adhesive refers to the amount of adhesive needed to secure a certain area of wall cladding.
It is usually recommended to follow the manufacturer's instructions for the specific type of tile adhesive being used.
The co-efficient can vary based on factors such as the type of tiles, substrate, and environmental condit...
The unit of skirting is typically measured in linear feet or meters.
Skirting is typically measured in linear feet or meters
It is used to cover the joint between the wall and the floor
Commonly used in construction and interior design projects
About my previous responsibility & why I want to leave previous Company ?
I appeared for an interview in Apr 2025, where I was asked the following questions.
I appeared for an interview in Feb 2025, where I was asked the following questions.
I appeared for an interview in Nov 2023.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
Top trending discussions
The duration of KMV Projects Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 43 interview experiences
Difficulty level
Duration
based on 672 reviews
Rating in categories
Assistant Engineer
203
salaries
| ₹2.2 L/yr - ₹6.2 L/yr |
Engineer
76
salaries
| ₹3.7 L/yr - ₹7.5 L/yr |
Senior Engineer
57
salaries
| ₹5 L/yr - ₹9.6 L/yr |
Assistant Manager
52
salaries
| ₹5.4 L/yr - ₹11 L/yr |
Assistant Engineer - Civil
50
salaries
| ₹1.9 L/yr - ₹5.5 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech