Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.
The finishing sequence post block masonry and RCC involves several systematic steps to ensure quality and aesthetics.
1. Surface Preparation: Clean and smoothen the surfaces of block masonry and RCC to remove any debris or irregularities.
2. Plastering: Apply plaster to walls for a smooth finish, ensuring proper curing to avoid cracks.
3. Waterproofing: Implement waterproofing measures in areas prone to moisture, such as ...
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
Top trending discussions
posted on 2 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
Estimation and costing of materials is a crucial aspect of civil engineering projects.
Estimation involves calculating the quantity of materials required for a project
Costing involves determining the cost of these materials
Factors such as market rates, transportation costs, and taxes must be considered
Software such as AutoCAD and Excel can be used for accurate estimation and costing
Regular updates and adjustments must b...
OPC stands for Ordinary Portland Cement, which is a widely used type of cement in construction work.
OPC is a type of cement that is commonly used in the construction industry.
It is known for its high strength and durability.
OPC is made by grinding clinker, gypsum, and other materials.
It is used in various applications such as concrete, mortar, and plaster.
OPC is available in different grades, such as OPC 33, OPC 43, an...
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
One meter is equal to 39.37 inches.
One meter is equivalent to 100 centimeters.
One inch is equal to 2.54 centimeters.
To convert meters to inches, multiply by 39.37 (100 * 2.54).
Steel density is typically around 7.85 g/cm^3.
Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel can vary depending on the specific alloy composition.
For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2022. There were 2 interview rounds.
RCC beam and column ratios depend on design requirements, load conditions, and structural safety standards.
Typical beam to column ratio is 1:1.5 to 1:2, depending on load and span.
For example, a beam may be designed with a width of 230mm and a column with 300mm.
The ratio can vary based on the type of structure; residential buildings may have different ratios than commercial.
Design codes like IS 456 provide guidelines f...
I appeared for an interview in Mar 2025, where I was asked the following questions.
based on 3 interview experiences
Difficulty level
Duration
based on 29 reviews
Rating in categories
Associate Manager
418
salaries
| ₹6 L/yr - ₹13.2 L/yr |
Deputy Manager
298
salaries
| ₹9.5 L/yr - ₹17.2 L/yr |
Manager
219
salaries
| ₹12 L/yr - ₹21.1 L/yr |
Sales Executive
209
salaries
| ₹3.9 L/yr - ₹8.5 L/yr |
Senior Executive
199
salaries
| ₹4.5 L/yr - ₹10.3 L/yr |
Sobha
Godrej Properties
Cushman & Wakefield
Colliers India