Filter interviews by
I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.
Project Technical specifications
Top trending discussions
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
I appeared for an interview in Sep 2021.
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
Class type 22 refers to a specific category or classification within a system or framework.
Class type 22 may refer to a specific type of product or service offered by a company.
It could also be a classification used in a particular industry or field.
In some cases, class type 22 may be a code or identifier used for organizational purposes.
I appeared for an interview in Dec 2024, where I was asked the following questions.
Having section of reasoning and technical questions.
Safety is paramount in the selection process, ensuring the right candidates prioritize and uphold safety standards.
Assess candidates' understanding of safety protocols, such as PPE usage in hazardous environments.
Evaluate past experiences where candidates successfully identified and mitigated safety risks.
Incorporate scenario-based questions to gauge decision-making in emergency situations.
Review candidates' training c...
I applied via Walk-in and was interviewed in Jun 2023. There were 4 interview rounds.
Reconciliation accounts are maintained to ensure accuracy and consistency in financial records.
Helps in identifying discrepancies between different accounts
Ensures accuracy and consistency in financial statements
Facilitates easy tracking of transactions and balances
Aids in detecting errors or fraud in accounting records
Company code level is maintained for global settings applicable to all clients, while client level is maintained for specific settings unique to each client.
Company code level settings include currency, chart of accounts, and fiscal year variants.
Client level settings include customer master data, vendor master data, and sales organization data.
Blueprint phases include planning, designing, and implementation. Tables are used to organize data in a structured format.
Blueprint phases: planning, designing, implementation
Tables: organize data in structured format
Examples: creating a blueprint for a new building, using tables in a database to store information
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
Consists of technical mcq's and general ability like Analytical reasoning and maths. There is negative marking for every question
based on 1 interview experience
Difficulty level
Duration
Fttx Engineer
31
salaries
| ₹3.2 L/yr - ₹5.1 L/yr |
Omcr Executive
19
salaries
| ₹1.8 L/yr - ₹3 L/yr |
ISP Engineer
15
salaries
| ₹2.8 L/yr - ₹4.8 L/yr |
MIS Coordinator
13
salaries
| ₹2.1 L/yr - ₹3.5 L/yr |
Material Coordinator
10
salaries
| ₹2.7 L/yr - ₹4.7 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company