Filter interviews by
I applied via Company Website and was interviewed before Dec 2020. There was 1 interview round.
Top trending discussions
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
posted on 5 Aug 2022
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
posted on 2 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Discussed about experience, discussed about technical and professional skills
Good attitude and best interview procedure
posted on 3 Feb 2025
I appeared for an interview before Jul 2024, where I was asked the following questions.
posted on 6 Nov 2023
I appeared for an interview in May 2023.
posted on 19 Mar 2024
I appeared for an interview before Mar 2023, where I was asked the following questions.
I excel in problem-solving and managing on-site operations through analytical thinking and effective team collaboration.
Utilized root cause analysis to identify and resolve operational inefficiencies, resulting in a 20% increase in productivity.
Implemented a new scheduling system that improved resource allocation and reduced overtime costs by 15%.
Led a cross-functional team to address a critical supply chain issue, suc...
posted on 29 May 2024
Piping Supervisor
8
salaries
| ₹4 L/yr - ₹9.6 L/yr |
Mechanical Engineer
4
salaries
| ₹0.6 L/yr - ₹1.2 L/yr |
Piping Engineer
4
salaries
| ₹10.5 L/yr - ₹19.6 L/yr |
Civil Supervisor
4
salaries
| ₹6 L/yr - ₹8 L/yr |
QC Piping Inspector
4
salaries
| ₹6.5 L/yr - ₹10 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures