i
OPPO
Filter interviews by
uph.upph.cycle time refers to the time taken to complete one cycle of a process in units per hour.
uph stands for units per hour
upph stands for units per person per hour
Cycle time is the time taken to complete one cycle of a process
It is used to measure the efficiency and productivity of a process
For example, if a team of 5 people can produce 100 units in 1 hour, the uph.upph.cycle time would be 20 units per person...
Kaizen roots cause continuous improvement and efficiency in processes.
Kaizen roots cause a culture of continuous improvement within an organization
It leads to increased efficiency and productivity in processes
Kaizen roots encourage employee involvement and empowerment in making small, incremental changes
It focuses on eliminating waste and optimizing resources
Examples include implementing 5S methodology, setting up...
Manpower handling refers to the management and coordination of employees to ensure efficient workflow and productivity.
Manpower handling involves assigning tasks to employees based on their skills and capabilities.
It also includes monitoring and evaluating the performance of employees to ensure they are meeting expectations.
Effective manpower handling requires good communication and leadership skills.
Examples: sch...
Failure analysis involves investigating the root cause of a failure in a system or component.
Identifying the symptoms of the failure
Collecting data and evidence related to the failure
Analyzing the data to determine the root cause
Developing recommendations to prevent future failures
Quality control involves monitoring and verifying the quality of products or services to ensure they meet the desired standards.
Establishing quality standards and procedures
Inspecting and testing products or services
Identifying and addressing defects or issues
Documenting and reporting findings
Implementing corrective actions
Continuously improving processes
Training employees on quality control procedures
6S is a lean manufacturing methodology that aims to improve workplace efficiency and reduce waste.
6S stands for Sort, Set in Order, Shine, Standardize, Sustain, and Safety.
It is often used in manufacturing and production environments.
The methodology involves organizing the workplace, eliminating unnecessary items, and creating a standardized system for maintaining cleanliness and organization.
The ultimate goal of ...
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Aims to increase efficiency and reduce costs
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
Production assembly line is a process of assembling parts to create a finished product in a systematic and efficient manner.
Production assembly lines are designed to increase efficiency and reduce costs.
Each worker is responsible for a specific task in the assembly process.
The assembly line is divided into different stations, each with its own set of tasks.
The finished product is inspected at the end of the line t...
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
Manpower handling refers to the management and coordination of employees to ensure efficient workflow and productivity.
Manpower handling involves assigning tasks to employees based on their skills and capabilities.
It also includes monitoring and evaluating the performance of employees to ensure they are meeting expectations.
Effective manpower handling requires good communication and leadership skills.
Examples: scheduli...
Failure analysis involves investigating the root cause of a failure in a system or component.
Identifying the symptoms of the failure
Collecting data and evidence related to the failure
Analyzing the data to determine the root cause
Developing recommendations to prevent future failures
uph.upph.cycle time refers to the time taken to complete one cycle of a process in units per hour.
uph stands for units per hour
upph stands for units per person per hour
Cycle time is the time taken to complete one cycle of a process
It is used to measure the efficiency and productivity of a process
For example, if a team of 5 people can produce 100 units in 1 hour, the uph.upph.cycle time would be 20 units per person per ...
Kaizen roots cause continuous improvement and efficiency in processes.
Kaizen roots cause a culture of continuous improvement within an organization
It leads to increased efficiency and productivity in processes
Kaizen roots encourage employee involvement and empowerment in making small, incremental changes
It focuses on eliminating waste and optimizing resources
Examples include implementing 5S methodology, setting up regu...
I applied via Apna Jobs and was interviewed in Sep 2024. There were 2 interview rounds.
Assistant manager
Amar Pratap Singh
My salary at my previous position was competitive and reflective of my experience and qualifications.
My salary was in line with industry standards for Assistant Engineers.
I received regular performance-based raises and bonuses.
I was satisfied with my compensation package overall.
Manager interview production department
To achieve a plan despite a 15-minute break, prioritize tasks, stay focused, and utilize time efficiently.
Assess the remaining time and prioritize tasks based on urgency and importance.
Use the 15-minute break to recharge; take deep breaths or stretch to maintain focus.
Break down larger tasks into smaller, manageable parts to maximize productivity.
Set a timer for focused work sessions to maintain momentum after the brea...
I come from a close-knit family that values education, hard work, and community service, which has shaped my character and ambitions.
My father is an engineer, which inspired my interest in technology and problem-solving.
My mother is a teacher, instilling in me the importance of education and lifelong learning.
I have two siblings; we often collaborate on projects, fostering teamwork and communication skills.
Family gathe...
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 3 interview rounds.
Anything can be the topic so prepared according to clear this, and usually they shortlist the candidates based on resume
Quality control involves monitoring and verifying the quality of products or services to ensure they meet the desired standards.
Establishing quality standards and procedures
Inspecting and testing products or services
Identifying and addressing defects or issues
Documenting and reporting findings
Implementing corrective actions
Continuously improving processes
Training employees on quality control procedures
6S is a lean manufacturing methodology that aims to improve workplace efficiency and reduce waste.
6S stands for Sort, Set in Order, Shine, Standardize, Sustain, and Safety.
It is often used in manufacturing and production environments.
The methodology involves organizing the workplace, eliminating unnecessary items, and creating a standardized system for maintaining cleanliness and organization.
The ultimate goal of 6S is...
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
Production assembly line is a process of assembling parts to create a finished product in a systematic and efficient manner.
Production assembly lines are designed to increase efficiency and reduce costs.
Each worker is responsible for a specific task in the assembly process.
The assembly line is divided into different stations, each with its own set of tasks.
The finished product is inspected at the end of the line to ens...
Top trending discussions
based on 9 interview experiences
Difficulty level
Duration
based on 115 reviews
Rating in categories
Sales Executive
472
salaries
| ₹1.1 L/yr - ₹6 L/yr |
Assistant Engineer
434
salaries
| ₹1.9 L/yr - ₹5.5 L/yr |
Team Lead
347
salaries
| ₹1.8 L/yr - ₹6.4 L/yr |
Production Engineer
304
salaries
| ₹2 L/yr - ₹7.4 L/yr |
Process Engineer
269
salaries
| ₹2 L/yr - ₹6.3 L/yr |
vivo
Dell
LG Electronics
HARMAN