Nagarjuna Construction Company Assistant Engineer Interview Questions and Answers

Updated 31 May 2025

24 Interview questions

An Assistant Engineer was asked 3mo ago
Q. What is the unit weight of 16mm steel?
Ans. 

The unit weight of 16mm steel is approximately 0.615 kg/m.

  • Unit weight is crucial for calculating the total weight of steel in construction.

  • For 16mm diameter steel bars, the unit weight is about 0.615 kg/m.

  • Example: A 12-meter long 16mm steel bar weighs approximately 7.38 kg (0.615 kg/m * 12 m).

  • Unit weight can vary slightly based on the steel grade and manufacturing process.

An Assistant Engineer was asked 3mo ago
Q. What is pH value?
Ans. 

pH value measures the acidity or alkalinity of a solution on a scale from 0 to 14.

  • pH 7 is neutral (e.g., pure water).

  • pH < 7 indicates acidity (e.g., lemon juice, pH 2).

  • pH > 7 indicates alkalinity (e.g., baking soda, pH 9).

  • pH is logarithmic; a change of 1 unit represents a tenfold change in acidity/alkalinity.

  • pH affects chemical reactions, biological processes, and environmental conditions.

Assistant Engineer Interview Questions Asked at Other Companies

Q1. How do we measure the slump of concrete during casting? Is there ... read more
Q2. Why do we take only 1 set of cube samples when casting concrete o ... read more
asked in Randstad
Q3. 1.Define the term capacitance & inductance 2.what is Rectifie ... read more
Q4. What is the 5S methodology, and why is it important in an industr ... read more
asked in TCE
Q5. What provisions do you check when designing a beam/column accordi ... read more
An Assistant Engineer was asked 3mo ago
Q. What is the density of steel?
Ans. 

The density of steel typically ranges from 7.75 to 8.05 g/cm³, depending on its composition and alloying elements.

  • Density varies with different types of steel; for example, stainless steel is denser than carbon steel.

  • Common structural steel has a density of about 7.85 g/cm³.

  • Density affects the weight of steel structures; heavier steel can lead to stronger but more expensive constructions.

  • Steel's density is crucial...

An Assistant Engineer was asked 6mo ago
Q. What type of structures do you currently work on?
Ans. 

I currently work on various civil engineering structures, including bridges, buildings, and infrastructure projects.

  • Bridges: Designing and analyzing load-bearing structures for transportation.

  • Buildings: Working on residential and commercial projects, focusing on safety and sustainability.

  • Infrastructure: Involvement in roads, highways, and utilities to enhance urban development.

An Assistant Engineer was asked 6mo ago
Q. What grade of concrete do you use in your projects?
Ans. 

The grade of concrete used depends on structural requirements, typically ranging from M20 to M50 for various applications.

  • M20 is commonly used for residential buildings and pavements.

  • M25 is often used for medium-strength structures like beams and slabs.

  • M30 is suitable for high-rise buildings and industrial structures.

  • M40 and M50 are used in specialized applications like bridges and high-strength components.

An Assistant Engineer was asked 6mo ago
Q. What is your total experience?
Ans. 

I have over 5 years of experience in engineering, focusing on project management and technical design in various sectors.

  • Worked on multiple projects, including a bridge construction that improved local traffic flow.

  • Led a team of engineers in developing a new software tool that increased efficiency by 30%.

  • Conducted regular site inspections to ensure compliance with safety regulations and quality standards.

  • Collabora...

An Assistant Engineer was asked 12mo ago
Q. How do you prepare a BBS?
Ans. 

BBS preparation involves calculating quantities of steel reinforcement required for construction projects.

  • Start by studying the structural drawings and specifications provided

  • Identify the different structural elements like beams, columns, slabs, etc.

  • Calculate the total length of each type of reinforcement required

  • Use standard formulas and codes to determine the quantity of steel bars needed

  • Prepare a detailed Bill ...

Are these interview questions helpful?
An Assistant Engineer was asked 12mo ago
Q. Describe the piling process.
Ans. 

Piling is a construction technique used to strengthen the foundation of a building by driving piles into the ground.

  • Piling involves driving long, slender columns (piles) into the ground to provide support for structures.

  • The process starts with site investigation to determine soil conditions and load-bearing capacity.

  • Piles can be made of concrete, steel, or timber, depending on the project requirements.

  • Piles are dr...

An Assistant Engineer was asked
Q. What do you mean by slump test?
Ans. 

Slump test is a concrete testing method to measure the consistency and workability of fresh concrete.

  • Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring how much the concrete slumps or settles.

  • The result of the slump test indicates the workability of the concrete mix - a higher slump value indicates higher workability.

  • The slump test is commonly used in construction t...

An Assistant Engineer was asked
Q. What is the process of brick work?
Ans. 

The process of brick work involves laying bricks in a specific pattern using mortar to create walls or structures.

  • Prepare the surface by cleaning and dampening it

  • Lay a bed of mortar on the surface

  • Place the bricks in the desired pattern, ensuring they are level and aligned

  • Use a trowel to add more mortar between the bricks to secure them in place

  • Repeat the process for each layer of bricks until the desired height is...

Nagarjuna Construction Company Assistant Engineer Interview Experiences

16 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Details for RCC road construction with specifications
  • Ans. 

    RCC road construction involves using reinforced concrete for durability and strength.

    • RCC stands for Reinforced Cement Concrete

    • Specifications include using high-quality cement, aggregates, and steel reinforcement

    • Proper compaction and curing are essential for durability

    • Thickness of the RCC road depends on traffic load and subgrade conditions

    • Joint spacing should be as per design specifications

  • Answered by AI
  • Q2. Some workings activities of Building construction
  • Ans. 

    Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.

    • Excavation: Digging the foundation and preparing the site

    • Foundation work: Pouring concrete and setting the foundation

    • Framing: Building the structure's skeleton with wood or steel beams

    • Roofing: Installing the roof materials

    • Electrical work: Wiring the building for electricity

    • Plumbing: Installin...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Abouts salaries and accommodation
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Oct 2020, where I was asked the following questions.

  • Q1. Type of pile
  • Ans. 

    Piles are deep foundation elements used to transfer loads to deeper soil layers, enhancing stability and support.

    • Types of piles include: driven piles, bored piles, and screw piles.

    • Driven piles are pre-fabricated and hammered into the ground, e.g., concrete or steel piles.

    • Bored piles are cast in-situ by drilling a hole and filling it with concrete, suitable for weak soils.

    • Screw piles have helical blades and are rotated ...

  • Answered by AI
  • Q2. Super structure
  • Q3. Baar bending shedule
  • Q4. Billing and sub
  • Q5. Client billing and
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Questions ask like Qc and execution and some questions from IS code interview was held in fully English language
  • Q2. Go and do interview preparation from Qc and execution and IS code
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What is unite weight of steel 16mm?
  • Ans. 

    The unit weight of 16mm steel is approximately 0.615 kg/m.

    • Unit weight is crucial for calculating the total weight of steel in construction.

    • For 16mm diameter steel bars, the unit weight is about 0.615 kg/m.

    • Example: A 12-meter long 16mm steel bar weighs approximately 7.38 kg (0.615 kg/m * 12 m).

    • Unit weight can vary slightly based on the steel grade and manufacturing process.

  • Answered by AI
  • Q2. What is density of steel?
  • Ans. 

    The density of steel typically ranges from 7.75 to 8.05 g/cm³, depending on its composition and alloying elements.

    • Density varies with different types of steel; for example, stainless steel is denser than carbon steel.

    • Common structural steel has a density of about 7.85 g/cm³.

    • Density affects the weight of steel structures; heavier steel can lead to stronger but more expensive constructions.

    • Steel's density is crucial in e...

  • Answered by AI
  • Q3. What is ph value
  • Ans. 

    pH value measures the acidity or alkalinity of a solution on a scale from 0 to 14.

    • pH 7 is neutral (e.g., pure water).

    • pH < 7 indicates acidity (e.g., lemon juice, pH 2).

    • pH > 7 indicates alkalinity (e.g., baking soda, pH 9).

    • pH is logarithmic; a change of 1 unit represents a tenfold change in acidity/alkalinity.

    • pH affects chemical reactions, biological processes, and environmental conditions.

  • Answered by AI

Assistant Engineer Interview Questions & Answers

user image Shailesh keshri

posted on 4 Dec 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. In which type of structures do you work currently?
  • Ans. 

    I currently work on various civil engineering structures, including bridges, buildings, and infrastructure projects.

    • Bridges: Designing and analyzing load-bearing structures for transportation.

    • Buildings: Working on residential and commercial projects, focusing on safety and sustainability.

    • Infrastructure: Involvement in roads, highways, and utilities to enhance urban development.

  • Answered by AI
  • Q2. What is the grade of concrete you use in your project or working Structures?
  • Ans. 

    The grade of concrete used depends on structural requirements, typically ranging from M20 to M50 for various applications.

    • M20 is commonly used for residential buildings and pavements.

    • M25 is often used for medium-strength structures like beams and slabs.

    • M30 is suitable for high-rise buildings and industrial structures.

    • M40 and M50 are used in specialized applications like bridges and high-strength components.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your total experience?
  • Ans. 

    I have over 5 years of experience in engineering, focusing on project management and technical design in various sectors.

    • Worked on multiple projects, including a bridge construction that improved local traffic flow.

    • Led a team of engineers in developing a new software tool that increased efficiency by 30%.

    • Conducted regular site inspections to ensure compliance with safety regulations and quality standards.

    • Collaborated w...

  • Answered by AI
  • Q2. How much salary would you expect?

Assistant Engineer Interview Questions & Answers

user image Krishna Gore

posted on 17 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About previous work experience
  • Q2. Difficulties in work

Assistant Engineer Interview Questions & Answers

user image Md Amir Raza

posted on 11 Jan 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. All Civil basics knowledge as per your cv and experience.
  • Q2. Size of covering block
  • Ans. 

    The size of covering block is determined based on the type of structure and its requirements.

    • The size of covering block is usually specified in the design drawings or specifications.

    • It is important to consider the dimensions and spacing of reinforcement bars when determining the size of covering block.

    • The covering block should provide adequate protection to the reinforcement bars from fire, corrosion, and other environ...

  • Answered by AI
  • Q3. Length of development
  • Ans. 

    The length of development refers to the duration it takes to complete a project or task.

    • The length of development can vary depending on the complexity of the project.

    • Factors such as team size, resources, and scope can also impact the length of development.

    • It is important to set realistic timelines and milestones to ensure efficient development.

    • For example, a simple website development project may take a few weeks, whil...

  • Answered by AI
  • Q4. Bending moment and Soil test
  • Q5. Construction materials in details
  • Ans. 

    Construction materials are substances used for building and construction purposes.

    • Construction materials include cement, concrete, bricks, steel, wood, and glass.

    • Cement is a binding agent used in the production of concrete.

    • Concrete is a mixture of cement, sand, gravel, and water, used for construction.

    • Bricks are rectangular blocks made of clay or concrete, used for building walls.

    • Steel is a strong and durable material ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer interview:
  • Structural Analysis
  • Cost Estimation
  • Quality Control
  • Bmcp
Interview preparation tips for other job seekers - Try to join through Head office.Never join through Regional office Or Site office.
Because you will get salary, increament everything good if you join directly through head office Hyderabad.
Visit website and submit Cv there.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Describe the whole process of piling
  • Ans. 

    Piling is a construction technique used to strengthen the foundation of a building by driving piles into the ground.

    • Piling involves driving long, slender columns (piles) into the ground to provide support for structures.

    • The process starts with site investigation to determine soil conditions and load-bearing capacity.

    • Piles can be made of concrete, steel, or timber, depending on the project requirements.

    • Piles are driven ...

  • Answered by AI
  • Q2. How to prepare BBS
  • Ans. 

    BBS preparation involves calculating quantities of steel reinforcement required for construction projects.

    • Start by studying the structural drawings and specifications provided

    • Identify the different structural elements like beams, columns, slabs, etc.

    • Calculate the total length of each type of reinforcement required

    • Use standard formulas and codes to determine the quantity of steel bars needed

    • Prepare a detailed Bill of Qu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give your answer honestly
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Process of Transmission line construction
  • Ans. 

    Transmission line construction involves planning, design, material procurement, site preparation, tower erection, conductor stringing, and testing.

    • Planning involves route selection, environmental impact assessment, and obtaining necessary permits.

    • Design includes determining tower locations, conductor size, and insulator type.

    • Material procurement involves sourcing towers, conductors, insulators, and hardware.

    • Site prepar...

  • Answered by AI
  • Q2. Explained right from survey to foundation to erection, Stringing and commissioning
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Basics of concrete and mortars
  • Q2. What do you mean by slump test?
  • Ans. 

    Slump test is a concrete testing method to measure the consistency and workability of fresh concrete.

    • Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring how much the concrete slumps or settles.

    • The result of the slump test indicates the workability of the concrete mix - a higher slump value indicates higher workability.

    • The slump test is commonly used in construction to ens...

  • Answered by AI
  • Q3. What is segregation?
  • Ans. 

    Segregation is the separation of different components of a mixture based on their physical properties.

    • Segregation occurs when particles of different sizes, shapes, or densities separate from each other.

    • For example, in a concrete mix, larger aggregates tend to settle at the bottom while smaller particles rise to the top.

    • Segregation can also occur in granular materials like sand and gravel during handling and transportat...

  • Answered by AI
  • Q4. What is the process of brick work?
  • Ans. 

    The process of brick work involves laying bricks in a specific pattern using mortar to create walls or structures.

    • Prepare the surface by cleaning and dampening it

    • Lay a bed of mortar on the surface

    • Place the bricks in the desired pattern, ensuring they are level and aligned

    • Use a trowel to add more mortar between the bricks to secure them in place

    • Repeat the process for each layer of bricks until the desired height is reac...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer interview:
  • Concrete and Quantity survey
  • Bar Bending Schedule
Interview preparation tips for other job seekers - Be confident your last previous roles and Responsibilities

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Nagarjuna Construction Company?
Ask anonymously on communities.

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Assistant Engineer interview?
Nagarjuna Construction Company interview process usually has 1-2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical, Resume Shortlist and HR.
How to prepare for Nagarjuna Construction Company Assistant Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nagarjuna Construction Company. The most common topics and skills that interviewers at Nagarjuna Construction Company expect are Commissioning, Execution, Hydro Testing, MSP and Metro Rail.
What are the top questions asked in Nagarjuna Construction Company Assistant Engineer interview?

Some of the top questions asked at the Nagarjuna Construction Company Assistant Engineer interview -

  1. How do we take slump for casting of concrete and what if when we go rise about ...read more
  2. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less ...read more
  3. What if we r doing a casting of concrete and in the meantime rain comes and con...read more
How long is the Nagarjuna Construction Company Assistant Engineer interview process?

The duration of Nagarjuna Construction Company Assistant Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.6/5

based on 25 interview experiences

Difficulty level

Moderate 88%
Hard 13%

Duration

Less than 2 weeks 88%
4-6 weeks 13%
View more
Nagarjuna Construction Company Assistant Engineer Salary
based on 839 salaries
₹3 L/yr - ₹9.1 L/yr
46% more than the average Assistant Engineer Salary in India
View more details

Nagarjuna Construction Company Assistant Engineer Reviews and Ratings

based on 286 reviews

4.1/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

3.9

Salary

4.2

Job security

3.9

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 286 Reviews and Ratings
Junior Engineer
951 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
839 salaries
unlock blur

₹3 L/yr - ₹9.1 L/yr

Senior Engineer
463 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Junior Engineer Civil
437 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Assistant Engineer - Civil
284 salaries
unlock blur

₹3.3 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
write
Share an Interview