Upload Button Icon Add office photos

R K Construction

Compare button icon Compare button icon Compare

Filter interviews by

R K Construction Interview Questions and Answers

Updated 27 Apr 2025
Popular Designations

R K Construction Interview Experiences

4 interviews found

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Roll and responsibility of a safety officer?
  • Q2. What is HSE plan?
  • Q3. What is PTW system?
  • Q4. Important of TBT?
Be interview-ready. Browse the most asked HR questions.
illustration image

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Nov 2022

I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Why do you want to work for our company?

Interview Preparation Tips

Topics to prepare for R K Construction Site Engineer interview:
  • Civil Construction
  • Civil Works
  • Handling Civil
Interview preparation tips for other job seekers - Job search like it's your job.focus on the employer's needs.
Are these interview questions helpful?

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 23 Apr 2021

I applied via Job Portal

Interview Questionnaire 

1 Question

  • Q1. Why u wanted to be th

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum . He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. How to calculate cement,sand and aggregate.
  • Ans. 

    To calculate cement, sand and aggregate, use the mix design ratio and the volume of concrete required.

    • Determine the mix design ratio for the concrete

    • Calculate the volume of concrete required

    • Multiply the volume by the mix ratio to get the amount of cement, sand, and aggregate needed

    • Convert the volume of each material to its weight using its density

    • Add 5-10% extra to account for wastage and ensure there is enough materia...

  • Answered by AI
  • Q2. Density of materials.
  • Ans. 

    Density of materials refers to the mass per unit volume of a substance.

    • Density is measured in units of mass per unit volume, such as kg/m³ or g/cm³.

    • The density of a material can vary depending on temperature and pressure.

    • Some common materials and their densities include water (1 g/cm³), aluminum (2.7 g/cm³), and gold (19.3 g/cm³).

  • Answered by AI
  • Q3. Thickness of slab
  • Ans. 

    The thickness of a slab depends on the load it needs to bear and the type of material used.

    • The thickness of a slab is determined by the structural engineer during the design phase.

    • The load that the slab needs to bear is a crucial factor in determining its thickness.

    • The type of material used for the slab also affects its thickness.

    • For example, a concrete slab for a residential building may be 4 inches thick, while a sla...

  • Answered by AI
  • Q4. Which amount of cement bag is used in your last site for slab
  • Ans. 

    We used 300 cement bags for the slab in our last site.

    • We used a total of 300 cement bags for the slab.

    • The amount of cement bags used may vary depending on the size of the slab.

    • We ensured that the cement was mixed properly to avoid any cracks in the slab.

  • Answered by AI
  • Q5. Calculate reinforcement BBS
  • Q6. Lapping length
  • Q7. Measurement units

Interview Preparation Tips

Interview preparation tips for other job seekers - Get knowledge practically on feild or in site it is easier than theory

Top trending discussions

View All
Interview Hub
2w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about R K Construction?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What is the role of site engineer in the field
  • Ans. 

    A site engineer oversees construction projects, ensuring quality, safety, and adherence to plans and regulations.

    • Coordinate daily operations on the construction site, ensuring tasks are completed on schedule.

    • Monitor construction progress and quality, making adjustments as necessary to meet project specifications.

    • Communicate with architects, contractors, and clients to address any issues or changes in the project.

    • Conduc...

  • Answered by AI
  • Q2. How to make good D.P.R at site
  • Ans. 

    A good Daily Progress Report (D.P.R) captures site activities, progress, and challenges to ensure effective project management.

    • Document daily activities: Record all tasks completed each day, such as excavation, concrete pouring, or installation of structures.

    • Track progress against the schedule: Compare actual progress with planned timelines to identify delays or ahead-of-schedule tasks.

    • Include weather conditions: Note ...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About work experience and salary
Round 3 - Technical 

(1 Question)

  • Q1. Deep knowledge about the work

Interview Preparation Tips

Topics to prepare for BuildAHome Site Engineer interview:
  • About residential projects
Interview preparation tips for other job seekers - Job Seeker can join the company without any confusion and you can learn many things over here.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jun 2024, where I was asked the following questions.

  • Q1. Mix ratio of M25&M20
  • Ans. 

    M25 and M20 are concrete grades with specific mix ratios for strength and durability in construction.

    • M20 concrete mix ratio is 1:1.5:3 (Cement: Sand: Aggregate).

    • M25 concrete mix ratio is 1:1:2 (Cement: Sand: Aggregate).

    • M20 is suitable for moderate strength applications like residential buildings.

    • M25 is used for structures requiring higher strength, such as beams and columns.

    • The numbers (20 and 25) represent the charact...

  • Answered by AI
  • Q2. Steel weight calculation formula
  • Ans. 

    The steel weight calculation formula helps determine the weight of steel based on its dimensions and density.

    • The formula to calculate the weight of steel is: Weight (kg) = Volume (m³) × Density (kg/m³).

    • For example, for a steel bar with a diameter of 10 mm and a length of 1 m, the volume is π × (0.005 m)² × 1 m.

    • Density of steel is typically around 7850 kg/m³, so using the volume calculated, you can find the weight.

    • For a...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. What can you share about your previous work experience?
  • Ans. 

    I have extensive experience in site engineering, focusing on project management, quality control, and team collaboration.

    • Managed a team of 10 engineers on a large commercial building project, ensuring timely completion within budget.

    • Implemented quality control measures that reduced rework by 15%, enhancing overall project efficiency.

    • Collaborated with architects and contractors to resolve design issues on-site, improvin...

  • Answered by AI
  • Q2. Basic knowledge about site engineer
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. Introduce yourself
  • Ans. 

    I am a dedicated Site Engineer with a strong background in construction management and a passion for delivering quality projects on time.

    • Education: Bachelor's degree in Civil Engineering from XYZ University.

    • Experience: Over 5 years of experience in managing construction sites, including residential and commercial projects.

    • Skills: Proficient in project management software like AutoCAD and MS Project.

    • Achievements: Succes...

  • Answered by AI
  • Q2. What is your Qualification
  • Ans. 

    I hold a Bachelor's degree in Civil Engineering, specializing in construction management and site operations.

    • Bachelor's degree in Civil Engineering from XYZ University.

    • Completed coursework in structural analysis, materials science, and project management.

    • Interned at ABC Construction Company, gaining hands-on experience in site supervision.

    • Certified in safety management and quality control processes.

  • Answered by AI

R K Construction Interview FAQs

How many rounds are there in R K Construction interview?
R K Construction interview process usually has 2 rounds. The most common rounds in the R K Construction interview process are Resume Shortlist and HR.
How to prepare for R K Construction interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at R K Construction. The most common topics and skills that interviewers at R K Construction expect are Accounting, Advanced Excel, Architecture, Bank Reconciliation and Budgeting.
What are the top questions asked in R K Construction interview?

Some of the top questions asked at the R K Construction interview -

  1. Which amount of cement bag is used in your last site for sl...read more
  2. How to calculate cement,sand and aggrega...read more
  3. Calculate reinforcement ...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.2/5

based on 5 interview experiences

Difficulty level

Easy 100%
View more

R K Construction Reviews and Ratings

based on 100 reviews

4.2/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

3.8

Salary

4.0

Job security

4.0

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 100 Reviews and Ratings
Project Manager

Vijayawada,

Visakhapatnam

+2

5-10 Yrs

Not Disclosed

Explore more jobs
Site Engineer
66 salaries
unlock blur

₹1.8 L/yr - ₹5.1 L/yr

Civil Site Engineer
45 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Civil Engineer
17 salaries
unlock blur

₹2 L/yr - ₹4.7 L/yr

Project Engineer
10 salaries
unlock blur

₹3.1 L/yr - ₹7.5 L/yr

Accountant
9 salaries
unlock blur

₹1.2 L/yr - ₹3 L/yr

Explore more salaries
Compare R K Construction with

Lea Associates South Asia

4.2
Compare

R.V.R. PROJECTS

4.1
Compare

McNally Bharat Engineering

4.0
Compare

ABCI Infrastructures

3.4
Compare
write
Share an Interview