Documentation refers to the process of recording and organizing information in a systematic manner.
Documentation involves creating and maintaining written records of processes, procedures, and policies.
It includes capturing and storing data, such as test results, reports, and specifications.
Documentation ensures traceability and provides a reference for future use.
It helps in maintaining quality standards, complia...
FE 500 and FE 500D are both types of steel used in construction, but they have different properties.
FE 500 has a minimum yield strength of 500 N/mm², while FE 500D has a minimum yield strength of 500 N/mm² with higher elongation.
FE 500D is more ductile and has better seismic resistance compared to FE 500.
FE 500D is recommended for areas prone to earthquakes or seismic activities.
FE 500D steel has a higher percenta...
Rates for particular item of work are analysed by comparing with historical data, market rates, and considering factors like location, complexity, and materials.
Compare rates with historical data for similar projects
Research current market rates for the specific item of work
Consider factors such as location, complexity, and materials used in the work
Consult with suppliers and subcontractors for pricing information
...
Claiming non scheduled items involves identifying the item, determining its cost, submitting a claim with supporting documentation, and negotiating with the client or contractor.
Identify the non scheduled item in the project scope
Determine the cost of the item including labor, materials, and any other associated expenses
Submit a claim to the client or contractor detailing the non scheduled item and its cost
Provide...
Client bills are finalized by reviewing project scope, quantities, rates, and any variations before preparing the final invoice.
Review project scope and ensure all deliverables are included in the bill
Check quantities of materials and services provided against the agreed upon contract
Verify rates for each item and ensure they match the agreed upon pricing
Account for any variations or changes to the original scope ...
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of ...
The lap length of a column is the length of overlap between two reinforcing bars.
The lap length is determined by the diameter of the bars and the strength of the concrete.
It is important to ensure that the lap length is sufficient to transfer the load from one bar to the other.
The lap length can vary depending on the type of column and the design requirements.
For example, in a reinforced concrete column, the lap l...
Tile laying involves preparing the surface, measuring and marking, applying adhesive, laying tiles, and grouting.
Surface preparation involves cleaning, leveling, and ensuring it is dry and free of debris.
Measure and mark the area to be tiled, ensuring the tiles are evenly spaced and aligned.
Apply adhesive to the surface using a notched trowel, ensuring it is spread evenly.
Lay the tiles starting from the center and...
I appeared for an interview in Nov 2024.
Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.
Managing project budgets effectively to avoid cost overruns
Dealing with unexpected site conditions such as soil instability or environmental hazards
Ensuring compliance with regulations and obtaining necessary permits
Balancing the needs of various stakeho...
What is the colume
The vertical part of the building and base of the slab, distribution of load
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Anchorage of reinforcing bars refers to the method of securing the bars in concrete to ensure proper transfer of forces.
Anchorage length is the portion of the reinforcing bar embedded in concrete to transfer forces effectively.
Proper anchorage is crucial for the structural integrity of the concrete element.
Anchorage can be achieved through hooks, bends, or mechanical anchorage devices.
Development length is the minimum ...
The minimum development length in a column is the length required for the full transfer of stress from the steel reinforcement to the concrete.
The minimum development length is typically specified by design codes or standards.
It is influenced by factors such as the diameter of the reinforcement, concrete strength, and bond characteristics.
For example, in ACI 318, the minimum development length for a #5 bar is 12 inches...
Embedded length is the length of reinforcement bar embedded in concrete, while development length is the length required for the bar to transfer its load to the concrete.
Embedded length is the portion of the reinforcement bar that is embedded in concrete to provide structural support.
Development length is the length of reinforcement required for the bar to transfer its load to the concrete without slippage.
Embedded len...
I appeared for an interview in Apr 2025, where I was asked the following questions.
I have extensive experience managing lab operations, ensuring compliance, and leading teams to achieve research goals effectively.
Managed a team of 10 in a high-throughput lab environment, improving efficiency by 20%.
Implemented new safety protocols that reduced incidents by 30%.
Oversaw the procurement of lab equipment, negotiating contracts that saved the department 15%.
Led a project on sample analysis that resulted i...
Construction hazards include falls, electrical hazards, struck-by hazards, caught-in/between hazards, and hazardous materials.
Falls from heights
Electrical hazards
Struck-by hazards (e.g. falling objects)
Caught-in/between hazards (e.g. machinery)
Hazardous materials exposure
Trip and fall hazards include uneven surfaces, cluttered walkways, poor lighting, and slippery floors.
Uneven surfaces such as cracked sidewalks or loose floor tiles
Cluttered walkways with obstacles like cables or boxes
Poor lighting in dimly lit areas
Slippery floors from spills or wet surfaces
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
The overall plant process involves controlling temperature, pressure, and level through setpoints, along with following specific start-up and shutdown procedures.
The plant process involves various unit operations such as mixing, reaction, separation, and purification.
Temperature, pressure, and level are controlled using instruments like thermocouples, pressure transmitters, and level sensors.
Setpoints are predetermined...
DCS operation involves monitoring and controlling processes through a centralized control system.
Monitoring process parameters
Adjusting control setpoints
Responding to alarms and abnormalities
Performing routine maintenance on DCS equipment
Troubleshooting system issues
Collaborating with other operators and engineers
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
The responsibilities of Quality Control include ensuring product quality, following QAP and QMP, preventing leakage, taking precautions for waterproofing, using codes for mix design, understanding self compact concrete, and being familiar with Mivan Shuttering.
Ensuring product quality
Following Quality Assurance Plan (QAP) and Quality Management Plan (QMP)
Preventing leakage
Taking precautions for waterproofing
Using codes...
The capacity of a Water Treatment Plant (WTP) is measured in million gallons per day (mgd).
WTP capacity is the maximum amount of water that can be treated and supplied per day.
It is an important factor in determining the water supply capability of a WTP.
Capacity can vary depending on the size and design of the plant.
For example, a WTP may have a capacity of 10 mgd, meaning it can treat and supply up to 10 million gallo...
Top trending discussions
The duration of Ramky Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 57 interview experiences
Difficulty level
Duration
based on 617 reviews
Rating in categories
Engineer
110
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Assistant Manager
97
salaries
| ₹4 L/yr - ₹9 L/yr |
Senior Engineer
82
salaries
| ₹3.5 L/yr - ₹7.6 L/yr |
Deputy Manager
63
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Senior Assistant Manager
59
salaries
| ₹5.1 L/yr - ₹10.3 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon