Filter interviews by
Maintaining operational condition involves regular assessments, proactive maintenance, and effective resource management.
Conduct regular site inspections to identify potential issues early.
Implement a preventive maintenance schedule for equipment and facilities, such as HVAC systems.
Ensure compliance with safety regulations to avoid operational disruptions.
Utilize technology for monitoring site conditions, like Io...
Effective vendor follow-up ensures timely material delivery, enhancing project efficiency and minimizing delays.
Establish clear communication channels with the vendor, such as regular check-in calls or emails.
Set specific delivery timelines and milestones to track progress, e.g., 'Materials should arrive by the end of the week.'
Use a project management tool to monitor delivery schedules and send reminders as deadl...
Tracking site requirements involves systematic assessment, communication, and documentation to ensure all needs are met efficiently.
Conduct regular site assessments to identify needs and gaps.
Establish clear communication channels with site managers and teams.
Utilize procurement software to log and track requirements.
Implement a checklist system for routine supplies and equipment.
Example: Weekly meetings with site...
Cube test on 7 days is preferred to ensure the concrete's strength and durability over time.
Allows for proper curing and hydration of the concrete
Helps in determining the concrete's compressive strength
Provides a reliable indication of the concrete's quality and durability
Allows for adjustments in the mix design if necessary
Showing why we should give shoring involves demonstrating the necessity and benefits of providing support to the railway infrastructure.
Shoring is essential for maintaining the structural integrity of railway tracks and preventing accidents.
It helps in stabilizing the ground, protecting against erosion, and ensuring safe passage for trains.
By showcasing the potential risks and consequences of not providing shoring...
The formula for steel calculation involves determining the weight of steel required based on the dimensions and density of the material.
Calculate the volume of steel needed by multiplying the length, width, and height of the structure.
Determine the density of the steel material being used.
Multiply the volume by the density to get the weight of steel required.
Consider any additional factors such as wastage or safet...
To close an NCR, identify root cause, implement corrective actions, verify effectiveness, and document closure.
Identify the root cause of the non-conformance
Implement corrective actions to address the root cause
Verify the effectiveness of the corrective actions
Document the closure of the NCR
Preventive actions before mass concrete include proper planning, testing, and monitoring.
Ensure proper mix design is in place
Conduct thorough testing of materials before pouring
Monitor temperature and curing conditions
Implement proper formwork and reinforcement
Consider using admixtures for better performance
LC (Letter of Credit) and BG (Bank Guarantee) are financial instruments used in trade to mitigate risks.
LC is a commitment by a bank to pay a seller on behalf of a buyer, ensuring payment upon fulfillment of terms.
BG is a promise from a bank to cover a loss if a party fails to fulfill contractual obligations.
Merit of LC: Provides security to sellers, ensuring they receive payment once conditions are met.
Demerit of...
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
To close an NCR, identify root cause, implement corrective actions, verify effectiveness, and document closure.
Identify the root cause of the non-conformance
Implement corrective actions to address the root cause
Verify the effectiveness of the corrective actions
Document the closure of the NCR
Preventive actions before mass concrete include proper planning, testing, and monitoring.
Ensure proper mix design is in place
Conduct thorough testing of materials before pouring
Monitor temperature and curing conditions
Implement proper formwork and reinforcement
Consider using admixtures for better performance
Cube test on 7 days is preferred to ensure the concrete's strength and durability over time.
Allows for proper curing and hydration of the concrete
Helps in determining the concrete's compressive strength
Provides a reliable indication of the concrete's quality and durability
Allows for adjustments in the mix design if necessary
Showing why we should give shoring involves demonstrating the necessity and benefits of providing support to the railway infrastructure.
Shoring is essential for maintaining the structural integrity of railway tracks and preventing accidents.
It helps in stabilizing the ground, protecting against erosion, and ensuring safe passage for trains.
By showcasing the potential risks and consequences of not providing shoring, sta...
The formula for steel calculation involves determining the weight of steel required based on the dimensions and density of the material.
Calculate the volume of steel needed by multiplying the length, width, and height of the structure.
Determine the density of the steel material being used.
Multiply the volume by the density to get the weight of steel required.
Consider any additional factors such as wastage or safety mar...
I appeared for an interview in May 2025, where I was asked the following questions.
The technical submittal process involves documentation, review, and approval stages to ensure compliance with project specifications.
1. Prepare Technical Submittal: Gather all necessary documents, including specifications, drawings, and product data sheets.
2. Internal Review: Conduct an internal review with relevant stakeholders (engineering, quality assurance) to ensure compliance.
3. Submission to PMS: Submit the tech...
LC (Letter of Credit) and BG (Bank Guarantee) are financial instruments used in trade to mitigate risks.
LC is a commitment by a bank to pay a seller on behalf of a buyer, ensuring payment upon fulfillment of terms.
BG is a promise from a bank to cover a loss if a party fails to fulfill contractual obligations.
Merit of LC: Provides security to sellers, ensuring they receive payment once conditions are met.
Demerit of LC: ...
I appeared for an interview before Jul 2024, where I was asked the following questions.
Effective management of credit vendors involves strategic evaluation, relationship building, and risk assessment.
Establish clear credit terms: Negotiate payment terms that align with cash flow needs, e.g., 30-day payment terms for essential supplies.
Regularly assess vendor creditworthiness: Use credit reports and financial statements to evaluate ongoing risk, ensuring vendors remain reliable.
Build strong relationships:...
Maintaining operational condition involves regular assessments, proactive maintenance, and effective resource management.
Conduct regular site inspections to identify potential issues early.
Implement a preventive maintenance schedule for equipment and facilities, such as HVAC systems.
Ensure compliance with safety regulations to avoid operational disruptions.
Utilize technology for monitoring site conditions, like IoT sen...
I procure materials through strategic sourcing, supplier evaluation, and negotiation to ensure quality and cost-effectiveness.
Identify requirements: Assess the materials needed based on project specifications.
Market research: Analyze suppliers and market trends to find potential vendors.
Supplier evaluation: Evaluate suppliers based on quality, reliability, and pricing.
Request for Proposal (RFP): Send out RFPs to shortl...
Finalizing purchase rates involves market analysis, supplier negotiation, and cost evaluation to ensure optimal pricing.
Conduct market research to understand current pricing trends and benchmarks.
Evaluate supplier quotes and compare them against industry standards.
Negotiate terms with suppliers, considering factors like bulk discounts and payment terms.
Assess total cost of ownership, including shipping, handling, and p...
Tracking site requirements involves systematic assessment, communication, and documentation to ensure all needs are met efficiently.
Conduct regular site assessments to identify needs and gaps.
Establish clear communication channels with site managers and teams.
Utilize procurement software to log and track requirements.
Implement a checklist system for routine supplies and equipment.
Example: Weekly meetings with site supe...
Effective monitoring of major material stock at site ensures timely procurement and minimizes delays in project execution.
Implement a robust inventory management system to track stock levels in real-time.
Conduct regular physical audits to reconcile actual stock with recorded inventory.
Utilize barcode or RFID technology for efficient tracking and management of materials.
Establish reorder points for critical materials to...
Effective vendor follow-up ensures timely material delivery, enhancing project efficiency and minimizing delays.
Establish clear communication channels with the vendor, such as regular check-in calls or emails.
Set specific delivery timelines and milestones to track progress, e.g., 'Materials should arrive by the end of the week.'
Use a project management tool to monitor delivery schedules and send reminders as deadlines ...
I appeared for an interview before Jun 2024, where I was asked the following questions.
Top trending discussions
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
HR told about the company on the first day, how it works, told the rules, showed the management and a lot
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
Yes, algorithms and pseudocodes are still important in IT Services.
Algorithms are used in various fields of IT such as machine learning, data analysis, and cryptography.
Pseudocodes are used to plan and design algorithms before coding them.
Understanding algorithms and pseudocodes is essential for software engineers to write efficient and optimized code.
Examples of algorithms include sorting algorithms, search algorithms...
I applied via Company Website and was interviewed before Sep 2021. There were 2 interview rounds.
2 coding questions which are of easy level
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.
based on 7 interview experiences
Difficulty level
Duration
based on 36 reviews
Rating in categories
Site Engineer
8
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Civil Site Engineer
7
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Store Incharge
5
salaries
| ₹2.6 L/yr - ₹3.2 L/yr |
Senior Store Officer
4
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
Quantity Surveyor
4
salaries
| ₹3 L/yr - ₹6.6 L/yr |