Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Satra Infrastructure Management Services Team. If you also belong to the team, you can get access from here

Filter interviews by

Satra Infrastructure Management Services Deputy Structure Manager Interview Questions and Answers

Updated 3 Jan 2024

Satra Infrastructure Management Services Deputy Structure Manager Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Why use girders instead of a slab for higher spanned bridges?
  • Ans. 

    Girders are used instead of slabs for higher spanned bridges due to their superior load-bearing capacity and flexibility.

    • Girders have a higher load-bearing capacity compared to slabs, making them suitable for longer spans.

    • Girders provide flexibility in design, allowing for various bridge configurations and accommodating different types of loads.

    • Girders can be precast or cast-in-place, offering construction efficiency a...

  • Answered by AI
  • Q2. IRC 6 loads that are applied in bridges
  • Ans. 

    IRC 6 loads are the standard loads specified for the design of bridges in India.

    • IRC 6 loads are specified by the Indian Road Congress (IRC) for different types of vehicles and their loads.

    • These loads include the weight of the vehicles, impact factors, and dynamic loads.

    • IRC 6 loads are used to determine the maximum load that a bridge may experience during its design life.

    • Examples of IRC 6 loads include the standard axle...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Make the answers to the question simple.
Learn the IRC codes 6 and 112.
Some basic BM and SF ideas

Top trending discussions

View All
Interview Hub
2w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Satra Infrastructure Management Services?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As attendance for “Mid Management level designation “ Just asks about my Experience. Not much Technical points highlighted except few Manager level Questions (general points not much technically projected)...

Interview Preparation Tips

Topics to prepare for VIKRAN Engineering & Exim Assistant Manager interview:
  • Nothing required.
Interview preparation tips for other job seekers - Just expecting less salary and having Good experience in the relevant field you can have JOB CONFIRMED easily.

Deputy Structure Manager Interview Questions Asked at Other Companies

asked in JSW Steel
Q1. Regarding a Grade 8.8 bolt, what do the numbers 8 and 0.8 refer t ... read more
asked in JSW Steel
Q2. What are the criteria for the design of a steel beam?
Q3. Why are girders used instead of slabs for bridges with higher spa ... read more
asked in JSW Steel
Q4. What are the applications of rolled, welded, and hollow sections?
asked in JSW Steel
Q5. What is the effective length factor for a free-standing column?

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How we define daviation of line and spotting of towers, major statuary clerance and their proposal and clearance proposals
  • Ans. 

    Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.

    • Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.

    • Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.

    • Major statutory clearance refers to the minimum distance required between power lines an...

  • Answered by AI
  • Q2. Where is your strengths of transmission line construction activity and why?
  • Ans. 

    My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.

    • Experience in managing large-scale transmission line construction projects

    • Expertise in ensuring adherence to safety standards and regulations

    • Ability to coordinate with cross-functional teams and stakeholders

    • Strong problem-solving and decision-making skills

    • Familiarity w...

  • Answered by AI
  • Q3. Why are you left your current employer

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask what you, dont give incomplete answer

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain compressor troubleshooting
  • Ans. 

    Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.

    • Check for leaks in the system

    • Inspect the compressor for damage or wear

    • Check the electrical connections and wiring

    • Monitor the pressure and temperature readings

    • Clean or replace air filters

    • Check the oil level and quality

    • Inspect the belts and pulleys for wear or damage

  • Answered by AI
  • Q2. Prespare well and before interview make sure

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and all types mechanical equipment
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Technical about railway experience in OHE
  • Q2. Commerical experience related to client billing
  • Ans. 

    I have extensive commercial experience related to client billing.

    • Managed client billing for a software company, ensuring timely and accurate invoicing

    • Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue

    • Collaborated with sales team to resolve billing discrepancies and improve client satisfaction

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Small organisation but growing in a steady path

Deputy Manager Interview Questions & Answers

VIKRAN Engineering & Exim user image sai krishna kaushik yendamuri

posted on 29 May 2025

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Basic technical
  • Q2. Collection process
Be interview-ready. Browse the most asked HR questions.
illustration image
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. Experience in Rural Electrification Experience.
  • Ans. 

    I have extensive experience in rural electrification projects, focusing on sustainable energy solutions and community engagement.

    • Led a project in rural India that provided solar power to over 500 households, improving quality of life and local businesses.

    • Collaborated with local governments and NGOs to identify areas in need of electrification, ensuring community needs were met.

    • Implemented training programs for local te...

  • Answered by AI
  • Q2. Project complaints

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Are these interview questions helpful?

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Your work experience
  • Ans. 

    I have extensive experience in structural engineering, focusing on design, analysis, and project management across various sectors.

    • Worked on the design of a 20-story commercial building, ensuring compliance with local codes and safety standards.

    • Conducted structural analysis using software like SAP2000 and ETABS for various projects, improving efficiency by 30%.

    • Collaborated with architects and contractors to optimize de...

  • Answered by AI
  • Q2. Detail interview about the design
  • Q3. Anyone wishing to join here Please Avoid

Interview Preparation Tips

Interview preparation tips for other job seekers - Please anyone looking to join here please avoid for your own good

I applied via Referral

Interview Questionnaire 

2 Questions

  • Q1. I was asked about power Converters.
  • Q2. I was asked about Traction Transformers

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be true. Never give bluff.

Satra Infrastructure Management Services Interview FAQs

How many rounds are there in Satra Infrastructure Management Services Deputy Structure Manager interview?
Satra Infrastructure Management Services interview process usually has 2 rounds. The most common rounds in the Satra Infrastructure Management Services interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Satra Infrastructure Management Services Deputy Structure Manager interview?

Some of the top questions asked at the Satra Infrastructure Management Services Deputy Structure Manager interview -

  1. Why use girders instead of a slab for higher spanned bridg...read more
  2. IRC 6 loads that are applied in brid...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3/5

based on 1 interview experience

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more
Manager
14 salaries
unlock blur

₹13.1 L/yr - ₹16.3 L/yr

Software Engineer
6 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Team Lead
5 salaries
unlock blur

₹7 L/yr - ₹10.5 L/yr

Resident Engineer
5 salaries
unlock blur

₹17.6 L/yr - ₹31.9 L/yr

CAD Engg
4 salaries
unlock blur

₹5.8 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Satra Infrastructure Management Services with

Lea Associates South Asia

4.2
Compare

ABCI Infrastructures

3.4
Compare

VIKRAN Engineering & Exim

4.0
Compare

The Louis Berger Group

4.3
Compare
write
Share an Interview