I applied via Referral and was interviewed in May 2024. There was 1 interview round.
I applied via Campus Placement
I am very interested in accepting an offer letter for the MEP Manager position, as it aligns with my career goals and expertise.
The role aligns perfectly with my background in mechanical, electrical, and plumbing systems.
I have successfully managed similar projects in the past, such as overseeing the MEP installation in a large commercial building.
I am eager to contribute to your team and help drive successful project ...
Top trending discussions
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I have extensive experience in substation design and development of industrial parks, including managing projects from conception to completion.
Managed multiple substation design projects, ensuring compliance with industry standards and regulations
Led the development of industrial parks, overseeing site selection, infrastructure planning, and stakeholder coordination
Collaborated with engineers, architects, and governme...
posted on 30 Apr 2024
I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.
I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.
Seeking new challenges and opportunities for skill development
Leaving for career growth and advancement
Experience and expertise in the field
Ability to contribute effectively to the team and projects
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
based on 3 interview experiences
Difficulty level
Duration
based on 21 reviews
Rating in categories
Deputy Manager
695
salaries
| ₹7.9 L/yr - ₹15 L/yr |
Senior Engineer
431
salaries
| ₹5 L/yr - ₹12 L/yr |
Construction Engineer
301
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Safety Officer
232
salaries
| ₹2.5 L/yr - ₹7.4 L/yr |
Engineer
229
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Kalpataru Projects International
Alstom Transportation