Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matche...
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other rel...
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, ...
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software ...
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
I have over 5 years of experience as a Quantity Surveyor, managing various projects and budgets effectively.
Managed cost estimates for residential and commercial projects, ensuring budget adherence.
Conducted feasibility studies for projects, analyzing costs and potential returns.
Collaborated with architects and engineers to optimize project designs for cost efficiency.
Utilized software like CostX and Excel for accurate...
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
I have not previously applied for any positions with Aarvee Associates, but I am eager to explore opportunities with the firm.
I have researched Aarvee Associates and admire their projects in infrastructure.
I am particularly interested in their approach to sustainable construction.
I believe my skills in cost estimation and project management align well with their needs.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the...
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
Top trending discussions
I appeared for an interview in Aug 2019.
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment dams.
Tu...
Density is the measure of mass per unit volume of a substance.
It is a physical property of matter.
It is calculated by dividing the mass of a substance by its volume.
Units of density include kg/m³, g/cm³, and lb/ft³.
Density can be used to identify substances and determine their purity.
For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors that...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may vary d...
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.
posted on 20 Jul 2017
I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.
Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.
Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.
The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.
The operation of the batching plant involves loading the ingredients into the hopper...
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I am a dedicated site engineer with a passion for construction and project management, ensuring quality and safety on every project.
Graduated with a degree in Civil Engineering from XYZ University.
Worked on various projects, including residential buildings and commercial complexes.
Skilled in using AutoCAD and project management software like MS Project.
Successfully managed a team of 10 workers on a recent site, improvi...
I applied via Walk-in and was interviewed in Nov 2021. There was 1 interview round.
Grab is a Southeast Asian ride-hailing, food delivery, and financial services company. The Pipeline is a program to develop tech talent.
Grab is headquartered in Singapore and operates in 8 countries.
It offers various services like ride-hailing, food delivery, and financial services.
The Pipeline is a program to develop tech talent in Southeast Asia.
It provides training and mentorship to aspiring tech professionals.
The p...
I am currently overseeing the construction and installation of the WTP equipment.
Coordinating with the project team to ensure timely completion of the WTP
Ensuring compliance with safety regulations and quality standards
Conducting regular inspections and tests to ensure proper functioning of the equipment
Addressing any issues or concerns that arise during the construction process
Collaborating with suppliers and contract...
Some of the top questions asked at the Aarvee Associates Quantity Surveyor interview -
based on 1 interview experience
Difficulty level
Duration
based on 8 reviews
Rating in categories
Assistant Manager
236
salaries
| ₹4.5 L/yr - ₹10.9 L/yr |
Manager
134
salaries
| ₹9.6 L/yr - ₹15.4 L/yr |
Site Engineer
118
salaries
| ₹3.6 L/yr - ₹6.8 L/yr |
Field Engineer
83
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Civil Engineer
80
salaries
| ₹3.3 L/yr - ₹7.8 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International