i
Afcons
Infrastructure
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
I'm seeking a change to grow professionally, embrace new challenges, and contribute to innovative projects in traffic management.
Professional Growth: I'm looking for opportunities that allow me to expand my skill set and take on more responsibilities, such as leading projects.
New Challenges: I thrive in dynamic environments and want to tackle complex traffic management issues that require innovative solutions.
Contribut...
Salary expectations depend on experience, industry standards, and the specific responsibilities of the Traffic Manager role.
Market Research: I have researched the average salary for Traffic Managers in this region, which typically ranges from $60,000 to $90,000 annually.
Experience Level: With my 5 years of experience in traffic management and optimization, I believe a salary in the upper range is justified.
Value Additi...
As a Traffic Manager, I coordinated logistics and optimized traffic flow to ensure timely deliveries and efficient operations.
Logistics Coordination: Managed the scheduling and routing of deliveries, ensuring that all shipments arrived on time and within budget.
Traffic Flow Optimization: Analyzed traffic patterns and implemented strategies to minimize delays, such as adjusting delivery times based on peak traffic hours...
The procedure for implementing Traffic Diversion work involves several steps.
Conduct a traffic survey to identify the areas that need diversion
Plan the diversion routes and communicate them to the public
Implement the diversion by putting up signs and barriers
Monitor the traffic flow and make adjustments as necessary
Remove the diversion once the work is completed
Top trending discussions
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
posted on 12 Jan 2023
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
posted on 14 Nov 2021
I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.
posted on 24 Mar 2020
I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost re...
I have over five years of experience in planning, focusing on project management and resource allocation.
Led a team in developing a strategic plan that improved project delivery timelines by 20%.
Implemented a new scheduling system that reduced resource conflicts and increased efficiency.
Collaborated with cross-functional teams to align project goals with organizational objectives.
Conducted regular reviews and adjustmen...
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with th...
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
posted on 22 Jun 2021
I applied via Campus Placement and was interviewed in May 2021. There were 3 interview rounds.
based on 1 review
Rating in categories
Senior Engineer
407
salaries
| ₹7.9 L/yr - ₹14.5 L/yr |
Planning Engineer
194
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Executive Engineer
180
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Civil Engineer
180
salaries
| ₹3.8 L/yr - ₹8.5 L/yr |
Assistant Manager
173
salaries
| ₹8.5 L/yr - ₹15.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company