i
Afcons
Infrastructure
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
SAP uses various tools for billing, including SAP SD, SAP FI, and SAP PS, to manage invoicing and financial processes efficiently.
SAP SD (Sales and Distribution): This module handles all sales processes, including order management, pricing, and billing.
SAP FI (Financial Accounting): Integrates billing with financial reporting, ensuring accurate accounting entries for invoices.
SAP PS (Project System): Manages billi...
Billing certification involves a systematic process to verify and approve contractor payments based on work completed.
1. Prepare the Bill: Compile all relevant documents, including invoices, work orders, and measurement sheets.
2. Measurement Verification: Ensure that the quantities of work completed match the measurements recorded in the bill.
3. Site Inspection: Conduct a site visit to verify the quality and quant...
I prefer locations that offer a balance of professional growth and personal comfort, ideally near urban centers with project opportunities.
Proximity to major construction projects, e.g., urban areas with ongoing infrastructure development.
Access to professional networks and resources, such as industry conferences in metropolitan cities.
Availability of amenities and lifestyle options, like parks and cultural activi...
Rate analysis involves estimating the cost of construction activities by evaluating material, labor, and overhead expenses.
Identify the work item: Determine the specific construction activity for which the rate analysis is being conducted.
Break down components: List all materials, labor, and overhead costs associated with the work item.
Gather market rates: Research current market prices for materials and labor to ...
Cube curing temperature at site is crucial for concrete strength development and should be maintained between 10°C to 30°C.
Curing temperature affects hydration and strength gain of concrete.
Ideal curing temperature is typically between 10°C to 30°C.
Extreme temperatures can lead to cracking or incomplete curing.
In hot weather, use curing compounds or wet coverings to maintain moisture.
In cold weather, insulation or...
The softening point of bitumen is determined using the Ring and Ball method, measuring temperature at which it softens.
The Ring and Ball method is the standard procedure for determining the softening point.
Two steel balls and a ring are used, with bitumen placed in the ring.
The apparatus is heated in a water bath, and the temperature is recorded when the bitumen softens enough for the balls to fall.
The softening p...
A deck slab is a flat structural element that forms the surface of a bridge or building, supporting loads and providing stability.
Deck slabs are typically made of reinforced concrete for strength and durability.
They are used in various structures, including bridges, parking garages, and roofs.
For example, a bridge deck slab supports the weight of vehicles and distributes loads to the supporting beams.
The thickness...
Design mix concrete is a specific blend of materials tailored for desired strength and durability in construction projects.
Design mix concrete is formulated based on structural requirements and environmental conditions.
It includes precise proportions of cement, aggregates, water, and additives.
For example, a mix design might specify 1:2:4 (cement:sand:gravel) for a standard strength concrete.
Different grades of co...
The process involves using a time tracking system to record the attendance of staff and workers.
Implement a time tracking system where staff can clock in and out
Ensure staff are trained on how to use the system properly
Regularly review and verify attendance records for accuracy
Address any discrepancies or issues with attendance promptly
Planning is the process of setting goals, determining actions to achieve those goals, and allocating resources to accomplish the goals.
Setting goals and objectives
Identifying actions and tasks needed to achieve the goals
Allocating resources such as time, money, and manpower
Creating schedules and timelines
Monitoring progress and making adjustments as needed
I appeared for an interview in May 2025, where I was asked the following questions.
Overview of Tunnel Boring Machines, their maintenance, and safety measures in engineering projects.
TBMs use a rotating cutter head to excavate soil and rock, transporting material via a conveyor system.
Common hydraulic failures include leaks in hoses, pump malfunctions, and pressure loss due to blockages.
Preventive maintenance involves regular inspections, lubrication, and replacing worn parts to avoid breakdowns.
Thrus...
Aspiring Junior Mechanical Engineer eager to contribute to Afcons Infrastructure Ltd with strong problem-solving skills and a passion for innovation.
I graduated with a degree in Mechanical Engineering from XYZ University, where I developed a solid foundation in thermodynamics and fluid mechanics.
I am particularly drawn to Afcons Infrastructure Ltd because of its reputation for innovative infrastructure projects and com...
As an HSE Officer, I ensure workplace safety, compliance with regulations, and promote health and environmental practices.
Conduct regular safety audits to identify hazards and implement corrective actions.
Develop and deliver training programs on safety protocols and emergency procedures.
Monitor compliance with health and safety regulations, such as OSHA standards.
Investigate accidents and incidents to determine root ca...
As an HSE Officer, I ensure workplace safety, compliance with regulations, and promote health and environmental standards.
Conduct regular safety audits to identify hazards and implement corrective actions.
Develop and deliver training programs on safety protocols and emergency procedures.
Monitor compliance with health and safety regulations, such as OSHA standards.
Investigate incidents and accidents to determine root ca...
As an HSE Officer, my role involves ensuring workplace safety, compliance with regulations, and promoting health and safety culture.
Conduct regular safety audits to identify hazards and implement corrective actions.
Develop and deliver safety training programs for employees, such as fire safety drills.
Ensure compliance with local and international safety regulations, like OSHA standards.
Investigate incidents and acciden...
I appeared for an interview in Jan 2025.
SPI, CPI, cost variance, and schedule variance are key performance indicators used in project management to measure project performance.
SPI (Schedule Performance Index) measures the efficiency of schedule performance. SPI = EV / PV. A value greater than 1 indicates ahead of schedule, less than 1 behind schedule.
CPI (Cost Performance Index) measures the efficiency of cost performance. CPI = EV / AC. A value greater than...
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
Currently working on implementing a new data analytics platform to improve reporting efficiency.
Identifying key requirements for the new platform
Developing a project plan with timelines and milestones
Collaborating with IT team to ensure smooth implementation
Testing and refining the platform before full deployment
Experienced MIS Manager with a background in data analysis and system optimization.
Over 5 years of experience in managing MIS systems
Skilled in data analysis and reporting tools such as SQL, Excel, and Tableau
Implemented process improvements resulting in 20% increase in efficiency
Led a team of analysts to successfully implement a new CRM system
I changed organizations quickly to pursue new opportunities for growth and development.
Opportunity for career advancement
Desire for new challenges
Better work-life balance
Company restructuring or downsizing
Relocation to a new city
Yes, I am willing to work in a remote location as long as the necessary resources are provided.
I am comfortable with remote work and have experience managing teams remotely.
I have a dedicated home office setup with reliable internet connection.
I am open to occasional travel for meetings or training sessions.
I am familiar with using collaboration tools like Slack, Zoom, and Trello for remote work.
I understand the import...
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I bring extensive experience, technical expertise, and a collaborative approach to enhance project outcomes in engineering geology.
Proven track record in geotechnical investigations, leading to successful project completions, such as the XYZ Bridge project.
Strong analytical skills, demonstrated by my ability to assess complex geological data and provide actionable insights.
Effective communication and teamwork, as evide...
posted on 1 Aug 2025
Mapping in CHI involves creating spatial representations of geotechnical data for analysis and decision-making.
Utilizes Geographic Information Systems (GIS) to visualize subsurface conditions.
Helps in identifying soil types, rock formations, and groundwater levels.
Facilitates risk assessment for construction projects by mapping potential hazards.
Example: Mapping landslide-prone areas to inform infrastructure planning.
I appeared for an interview in May 2025, where I was asked the following questions.
I prioritize tasks, utilize project management tools, and collaborate with team members to ensure timely and efficient completion of work.
Set clear goals and deadlines for each project phase, such as completing initial designs within two weeks.
Use project management software like MS Project or Trello to track progress and manage resources effectively.
Conduct regular team meetings to discuss challenges and share updates...
I plan to complete my work through structured planning, effective communication, and continuous monitoring of project progress.
Develop a detailed project plan outlining tasks, timelines, and resources needed.
Utilize project management software to track progress and adjust schedules as necessary.
Conduct regular team meetings to ensure everyone is aligned and address any challenges.
Implement quality control measures at e...
As a Civil Structural Engineer, I oversee design, analysis, and project management to ensure safe and efficient structures.
Conduct structural analysis to determine load-bearing capacities and material strengths.
Design structures such as bridges and buildings, ensuring compliance with safety codes.
Collaborate with architects and other engineers to integrate structural elements into overall designs.
Prepare detailed const...
I appeared for an interview in May 2025, where I was asked the following questions.
Planning is the process of setting goals, determining actions to achieve those goals, and allocating resources to accomplish the goals.
Setting goals and objectives
Identifying actions and tasks needed to achieve the goals
Allocating resources such as time, money, and manpower
Creating schedules and timelines
Monitoring progress and making adjustments as needed
During my internship, I assisted in creating project schedules, tracking progress, and analyzing delays.
Assisted in creating project schedules using software like Primavera P6
Tracked progress by updating Gantt charts and critical path analysis
Analyzed delays by identifying causes and proposing mitigation strategies
Top trending discussions
The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 239 interview experiences
Difficulty level
Duration
based on 2.7k reviews
Rating in categories
Senior Engineer
416
salaries
| ₹7.4 L/yr - ₹13.1 L/yr |
Assistant Manager
214
salaries
| ₹9 L/yr - ₹14.3 L/yr |
Planning Engineer
194
salaries
| ₹4.9 L/yr - ₹10 L/yr |
Civil Engineer
193
salaries
| ₹3.5 L/yr - ₹8.4 L/yr |
Executive Engineer
178
salaries
| ₹4.7 L/yr - ₹10.1 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company