i
Afcons
Infrastructure
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
Addressing site-related issues requires systematic problem-solving and effective communication with the team.
Identify the specific issue: For example, if there are delays in material delivery, assess the supply chain.
Communicate with the team: Hold a meeting to discuss the problem and gather input from all stakeholders.
Develop a solution: If equipment is malfunctioning, consider renting or borrowing similar equipm...
Safety rules at construction sites ensure worker protection and compliance with regulations to prevent accidents and injuries.
Conduct regular safety training sessions for all workers to ensure they understand safety protocols.
Use personal protective equipment (PPE) such as helmets, gloves, and safety goggles at all times.
Implement a strict fall protection plan when working at heights, including guardrails and harn...
Daily Tool Box Talks (TBT) ensure safety and efficiency before starting work at construction sites.
Discuss specific hazards related to the day's tasks, such as working at heights or handling heavy materials.
Review safety protocols and personal protective equipment (PPE) required for the day's activities.
Encourage team members to share any concerns or past experiences related to the tasks ahead.
Provide updates on s...
Daily updates to the plan ensure project alignment, resource optimization, and timely completion of erection and fabrication tasks.
Review daily progress against the project timeline to identify any delays or issues.
Communicate with team members to gather updates on their tasks and any challenges faced.
Adjust resource allocation based on current needs, such as increasing manpower for critical tasks.
Utilize project ...
Quality work in erection and fabrication ensures safety, durability, and compliance with industry standards.
Adhere to established quality standards like ISO 9001 to ensure consistency.
Conduct regular inspections during the fabrication process to identify defects early.
Implement a quality control checklist for each project phase, ensuring all criteria are met.
Use certified materials and components to guarantee reli...
Daily Progress Report (DPR) tracks site activities, ensuring transparency and accountability in engineering projects.
Document daily activities: Record all tasks completed, such as erection of structural steel or installation of equipment.
Note manpower and equipment: Include the number of workers on-site and machinery used, e.g., cranes or forklifts.
Highlight safety measures: Report any safety incidents or inspecti...
SES stands for Service Entry Sheet, used in SAP MM to confirm services rendered and facilitate invoice processing.
SES is a document used to record services provided by a vendor.
It is essential for service procurement processes in SAP MM.
SES allows for the verification of services before payment is made.
Example: If a contractor completes a maintenance job, an SES is created to confirm the work done.
SES can be linke...
GRN stands for Goods Receipt Note, a document confirming the receipt of goods in inventory.
GRN is used to document the receipt of goods from suppliers.
It serves as proof of delivery and is essential for inventory management.
Example: A company receives a shipment of raw materials and generates a GRN to confirm the quantity and condition.
GRNs help in matching invoices with received goods to ensure accuracy in paymen...
Creating a Purchase Order in SAP MM involves several steps to ensure accurate procurement and inventory management.
Access the SAP GUI and navigate to the transaction code ME21N to create a Purchase Order.
Select the document type (e.g., Standard PO, Consignment PO) based on your procurement needs.
Enter the vendor's information in the 'Vendor' field to specify who you are purchasing from.
Fill in the material details...
As a Construction Manager, I oversee project planning, execution, and ensure compliance with safety and quality standards.
Coordinate with architects and engineers to ensure project specifications are met.
Manage budgets and timelines, ensuring projects are completed on schedule and within budget.
Conduct regular site inspections to monitor progress and address any issues.
Implement safety protocols to protect workers...
I appeared for an interview in May 2025, where I was asked the following questions.
Overview of Tunnel Boring Machines, their maintenance, and safety measures in engineering projects.
TBMs use a rotating cutter head to excavate soil and rock, transporting material via a conveyor system.
Common hydraulic failures include leaks in hoses, pump malfunctions, and pressure loss due to blockages.
Preventive maintenance involves regular inspections, lubrication, and replacing worn parts to avoid breakdowns.
Thrus...
Aspiring Junior Mechanical Engineer eager to contribute to Afcons Infrastructure Ltd with strong problem-solving skills and a passion for innovation.
I graduated with a degree in Mechanical Engineering from XYZ University, where I developed a solid foundation in thermodynamics and fluid mechanics.
I am particularly drawn to Afcons Infrastructure Ltd because of its reputation for innovative infrastructure projects and com...
As an HSE Officer, I ensure workplace safety, compliance with regulations, and promote health and environmental practices.
Conduct regular safety audits to identify hazards and implement corrective actions.
Develop and deliver training programs on safety protocols and emergency procedures.
Monitor compliance with health and safety regulations, such as OSHA standards.
Investigate accidents and incidents to determine root ca...
As an HSE Officer, I ensure workplace safety, compliance with regulations, and promote health and environmental standards.
Conduct regular safety audits to identify hazards and implement corrective actions.
Develop and deliver training programs on safety protocols and emergency procedures.
Monitor compliance with health and safety regulations, such as OSHA standards.
Investigate incidents and accidents to determine root ca...
As an HSE Officer, my role involves ensuring workplace safety, compliance with regulations, and promoting health and safety culture.
Conduct regular safety audits to identify hazards and implement corrective actions.
Develop and deliver safety training programs for employees, such as fire safety drills.
Ensure compliance with local and international safety regulations, like OSHA standards.
Investigate incidents and acciden...
I appeared for an interview in Jan 2025.
SPI, CPI, cost variance, and schedule variance are key performance indicators used in project management to measure project performance.
SPI (Schedule Performance Index) measures the efficiency of schedule performance. SPI = EV / PV. A value greater than 1 indicates ahead of schedule, less than 1 behind schedule.
CPI (Cost Performance Index) measures the efficiency of cost performance. CPI = EV / AC. A value greater than...
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
Currently working on implementing a new data analytics platform to improve reporting efficiency.
Identifying key requirements for the new platform
Developing a project plan with timelines and milestones
Collaborating with IT team to ensure smooth implementation
Testing and refining the platform before full deployment
Experienced MIS Manager with a background in data analysis and system optimization.
Over 5 years of experience in managing MIS systems
Skilled in data analysis and reporting tools such as SQL, Excel, and Tableau
Implemented process improvements resulting in 20% increase in efficiency
Led a team of analysts to successfully implement a new CRM system
I changed organizations quickly to pursue new opportunities for growth and development.
Opportunity for career advancement
Desire for new challenges
Better work-life balance
Company restructuring or downsizing
Relocation to a new city
Yes, I am willing to work in a remote location as long as the necessary resources are provided.
I am comfortable with remote work and have experience managing teams remotely.
I have a dedicated home office setup with reliable internet connection.
I am open to occasional travel for meetings or training sessions.
I am familiar with using collaboration tools like Slack, Zoom, and Trello for remote work.
I understand the import...
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I bring extensive experience, technical expertise, and a collaborative approach to enhance project outcomes in engineering geology.
Proven track record in geotechnical investigations, leading to successful project completions, such as the XYZ Bridge project.
Strong analytical skills, demonstrated by my ability to assess complex geological data and provide actionable insights.
Effective communication and teamwork, as evide...
posted on 1 Aug 2025
Mapping in CHI involves creating spatial representations of geotechnical data for analysis and decision-making.
Utilizes Geographic Information Systems (GIS) to visualize subsurface conditions.
Helps in identifying soil types, rock formations, and groundwater levels.
Facilitates risk assessment for construction projects by mapping potential hazards.
Example: Mapping landslide-prone areas to inform infrastructure planning.
I appeared for an interview in May 2025, where I was asked the following questions.
I prioritize tasks, utilize project management tools, and collaborate with team members to ensure timely and efficient completion of work.
Set clear goals and deadlines for each project phase, such as completing initial designs within two weeks.
Use project management software like MS Project or Trello to track progress and manage resources effectively.
Conduct regular team meetings to discuss challenges and share updates...
I plan to complete my work through structured planning, effective communication, and continuous monitoring of project progress.
Develop a detailed project plan outlining tasks, timelines, and resources needed.
Utilize project management software to track progress and adjust schedules as necessary.
Conduct regular team meetings to ensure everyone is aligned and address any challenges.
Implement quality control measures at e...
As a Civil Structural Engineer, I oversee design, analysis, and project management to ensure safe and efficient structures.
Conduct structural analysis to determine load-bearing capacities and material strengths.
Design structures such as bridges and buildings, ensuring compliance with safety codes.
Collaborate with architects and other engineers to integrate structural elements into overall designs.
Prepare detailed const...
I appeared for an interview in May 2025, where I was asked the following questions.
Planning is the process of setting goals, determining actions to achieve those goals, and allocating resources to accomplish the goals.
Setting goals and objectives
Identifying actions and tasks needed to achieve the goals
Allocating resources such as time, money, and manpower
Creating schedules and timelines
Monitoring progress and making adjustments as needed
During my internship, I assisted in creating project schedules, tracking progress, and analyzing delays.
Assisted in creating project schedules using software like Primavera P6
Tracked progress by updating Gantt charts and critical path analysis
Analyzed delays by identifying causes and proposing mitigation strategies
Top trending discussions
The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 239 interview experiences
Difficulty level
Duration
based on 2.7k reviews
Rating in categories
Senior Engineer
416
salaries
| ₹7.4 L/yr - ₹13.1 L/yr |
Assistant Manager
214
salaries
| ₹9 L/yr - ₹14.3 L/yr |
Planning Engineer
194
salaries
| ₹4.9 L/yr - ₹10 L/yr |
Civil Engineer
193
salaries
| ₹3.5 L/yr - ₹8.4 L/yr |
Executive Engineer
178
salaries
| ₹4.7 L/yr - ₹10.1 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company