Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Afcons Infrastructure Team. If you also belong to the team, you can get access from here

Afcons Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Afcons Infrastructure Interview Questions and Answers

Updated 13 Aug 2025
Popular Designations

159 Interview questions

An Erection & Fabrication Engineer was asked 3mo ago
Q. How do you solve problems on-site?
Ans. 

Addressing site-related issues requires systematic problem-solving and effective communication with the team.

  • Identify the specific issue: For example, if there are delays in material delivery, assess the supply chain.

  • Communicate with the team: Hold a meeting to discuss the problem and gather input from all stakeholders.

  • Develop a solution: If equipment is malfunctioning, consider renting or borrowing similar equipm...

View all Erection & Fabrication Engineer interview questions
An Erection & Fabrication Engineer was asked 3mo ago
Q. How do you ensure that all safety rules are maintained on the site?
Ans. 

Safety rules at construction sites ensure worker protection and compliance with regulations to prevent accidents and injuries.

  • Conduct regular safety training sessions for all workers to ensure they understand safety protocols.

  • Use personal protective equipment (PPE) such as helmets, gloves, and safety goggles at all times.

  • Implement a strict fall protection plan when working at heights, including guardrails and harn...

View all Erection & Fabrication Engineer interview questions
An Erection & Fabrication Engineer was asked 3mo ago
Q. What is your experience conducting Toolbox Talks (TBT) on-site before starting work?
Ans. 

Daily Tool Box Talks (TBT) ensure safety and efficiency before starting work at construction sites.

  • Discuss specific hazards related to the day's tasks, such as working at heights or handling heavy materials.

  • Review safety protocols and personal protective equipment (PPE) required for the day's activities.

  • Encourage team members to share any concerns or past experiences related to the tasks ahead.

  • Provide updates on s...

View all Erection & Fabrication Engineer interview questions
An Erection & Fabrication Engineer was asked 3mo ago
Q. How do you update the plan and maintain it daily?
Ans. 

Daily updates to the plan ensure project alignment, resource optimization, and timely completion of erection and fabrication tasks.

  • Review daily progress against the project timeline to identify any delays or issues.

  • Communicate with team members to gather updates on their tasks and any challenges faced.

  • Adjust resource allocation based on current needs, such as increasing manpower for critical tasks.

  • Utilize project ...

View all Erection & Fabrication Engineer interview questions
An Erection & Fabrication Engineer was asked 3mo ago
Q. How do you maintain quality work according to quality rules?
Ans. 

Quality work in erection and fabrication ensures safety, durability, and compliance with industry standards.

  • Adhere to established quality standards like ISO 9001 to ensure consistency.

  • Conduct regular inspections during the fabrication process to identify defects early.

  • Implement a quality control checklist for each project phase, ensuring all criteria are met.

  • Use certified materials and components to guarantee reli...

View all Erection & Fabrication Engineer interview questions
An Erection & Fabrication Engineer was asked 3mo ago
Q. How do you prepare the Daily Progress Report (DPR) based on site activities?
Ans. 

Daily Progress Report (DPR) tracks site activities, ensuring transparency and accountability in engineering projects.

  • Document daily activities: Record all tasks completed, such as erection of structural steel or installation of equipment.

  • Note manpower and equipment: Include the number of workers on-site and machinery used, e.g., cranes or forklifts.

  • Highlight safety measures: Report any safety incidents or inspecti...

View all Erection & Fabrication Engineer interview questions

Afcons Infrastructure HR Interview Questions

65 questions and answers

Q. How many years of work experience do you have?
Q. Why are you interested in tunnel projects?
Q. How do you manage a site team?
A SAP MM was asked 3mo ago
Q. What is SES?
Ans. 

SES stands for Service Entry Sheet, used in SAP MM to confirm services rendered and facilitate invoice processing.

  • SES is a document used to record services provided by a vendor.

  • It is essential for service procurement processes in SAP MM.

  • SES allows for the verification of services before payment is made.

  • Example: If a contractor completes a maintenance job, an SES is created to confirm the work done.

  • SES can be linke...

View all SAP MM interview questions
Are these interview questions helpful?
A SAP MM was asked 3mo ago
Q. What is GRN?
Ans. 

GRN stands for Goods Receipt Note, a document confirming the receipt of goods in inventory.

  • GRN is used to document the receipt of goods from suppliers.

  • It serves as proof of delivery and is essential for inventory management.

  • Example: A company receives a shipment of raw materials and generates a GRN to confirm the quantity and condition.

  • GRNs help in matching invoices with received goods to ensure accuracy in paymen...

View all SAP MM interview questions
A SAP MM was asked 3mo ago
Q. How do you create a Purchase Order?
Ans. 

Creating a Purchase Order in SAP MM involves several steps to ensure accurate procurement and inventory management.

  • Access the SAP GUI and navigate to the transaction code ME21N to create a Purchase Order.

  • Select the document type (e.g., Standard PO, Consignment PO) based on your procurement needs.

  • Enter the vendor's information in the 'Vendor' field to specify who you are purchasing from.

  • Fill in the material details...

View all SAP MM interview questions
A Construction Manager Civil was asked 4mo ago
Q. Can you describe your job role and its responsibilities?
Ans. 

As a Construction Manager, I oversee project planning, execution, and ensure compliance with safety and quality standards.

  • Coordinate with architects and engineers to ensure project specifications are met.

  • Manage budgets and timelines, ensuring projects are completed on schedule and within budget.

  • Conduct regular site inspections to monitor progress and address any issues.

  • Implement safety protocols to protect workers...

View all Construction Manager Civil interview questions

Afcons Infrastructure Interview Experiences

237 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
No response

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. 1.Explain the working principle of a Tunnel Boring Machine (TBM). 2. What are the common causes of hydraulic failure in TBM systems? 3. How do you perform preventive maintenance on mechanical systems? 4. W...
  • Ans. 

    Overview of Tunnel Boring Machines, their maintenance, and safety measures in engineering projects.

    • TBMs use a rotating cutter head to excavate soil and rock, transporting material via a conveyor system.

    • Common hydraulic failures include leaks in hoses, pump malfunctions, and pressure loss due to blockages.

    • Preventive maintenance involves regular inspections, lubrication, and replacing worn parts to avoid breakdowns.

    • Thrus...

  • Answered by AI
  • Q2. Tell me about yourself. 2. Why do you want to work with Afcons Infrastructure Ltd? 3. What are your strengths and weaknesses? 4. Where do you see yourself in 5 years? 5. Why did you leave your previous job...
  • Ans. 

    Aspiring Junior Mechanical Engineer eager to contribute to Afcons Infrastructure Ltd with strong problem-solving skills and a passion for innovation.

    • I graduated with a degree in Mechanical Engineering from XYZ University, where I developed a solid foundation in thermodynamics and fluid mechanics.

    • I am particularly drawn to Afcons Infrastructure Ltd because of its reputation for innovative infrastructure projects and com...

  • Answered by AI

HSE Officer Interview Questions & Answers

user image Anonymous

posted on 5 Dec 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Job related questions
  • Ans. 

    As an HSE Officer, I ensure workplace safety, compliance with regulations, and promote health and environmental practices.

    • Conduct regular safety audits to identify hazards and implement corrective actions.

    • Develop and deliver training programs on safety protocols and emergency procedures.

    • Monitor compliance with health and safety regulations, such as OSHA standards.

    • Investigate accidents and incidents to determine root ca...

  • Answered by AI
  • Q2. Safety officer responsibly
Round 2 - One-on-one 

(2 Questions)

  • Q1. Job related questions
  • Ans. 

    As an HSE Officer, I ensure workplace safety, compliance with regulations, and promote health and environmental standards.

    • Conduct regular safety audits to identify hazards and implement corrective actions.

    • Develop and deliver training programs on safety protocols and emergency procedures.

    • Monitor compliance with health and safety regulations, such as OSHA standards.

    • Investigate incidents and accidents to determine root ca...

  • Answered by AI
  • Q2. Safety officer Responsibility
Round 3 - One-on-one 

(2 Questions)

  • Q1. Job related questions
  • Ans. 

    As an HSE Officer, my role involves ensuring workplace safety, compliance with regulations, and promoting health and safety culture.

    • Conduct regular safety audits to identify hazards and implement corrective actions.

    • Develop and deliver safety training programs for employees, such as fire safety drills.

    • Ensure compliance with local and international safety regulations, like OSHA standards.

    • Investigate incidents and acciden...

  • Answered by AI
  • Q2. Safety officer Responsibility

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview to be conducted in both languages Hindi & English

Pget Interview Questions & Answers

user image Anonymous

posted on 21 Feb 2025

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Resource leveling and resource smoothening
  • Q2. Explain spi,cpi, cost vaiance scchedule varience
  • Ans. 

    SPI, CPI, cost variance, and schedule variance are key performance indicators used in project management to measure project performance.

    • SPI (Schedule Performance Index) measures the efficiency of schedule performance. SPI = EV / PV. A value greater than 1 indicates ahead of schedule, less than 1 behind schedule.

    • CPI (Cost Performance Index) measures the efficiency of cost performance. CPI = EV / AC. A value greater than...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - whole interview on planning
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Present working projects activity and its planning sequences?
  • Ans. 

    Currently working on implementing a new data analytics platform to improve reporting efficiency.

    • Identifying key requirements for the new platform

    • Developing a project plan with timelines and milestones

    • Collaborating with IT team to ensure smooth implementation

    • Testing and refining the platform before full deployment

  • Answered by AI
  • Q2. UG Project and PG Projects related and resume
  • Q3. Planning related uses , how and where to use like that
Round 3 - One-on-one 

(3 Questions)

  • Q1. Tell me about your self
  • Ans. 

    Experienced MIS Manager with a background in data analysis and system optimization.

    • Over 5 years of experience in managing MIS systems

    • Skilled in data analysis and reporting tools such as SQL, Excel, and Tableau

    • Implemented process improvements resulting in 20% increase in efficiency

    • Led a team of analysts to successfully implement a new CRM system

  • Answered by AI
  • Q2. Why you changed organisation quickly
  • Ans. 

    I changed organizations quickly to pursue new opportunities for growth and development.

    • Opportunity for career advancement

    • Desire for new challenges

    • Better work-life balance

    • Company restructuring or downsizing

    • Relocation to a new city

  • Answered by AI
  • Q3. Willing To work remote location?
  • Ans. 

    Yes, I am willing to work in a remote location as long as the necessary resources are provided.

    • I am comfortable with remote work and have experience managing teams remotely.

    • I have a dedicated home office setup with reliable internet connection.

    • I am open to occasional travel for meetings or training sessions.

    • I am familiar with using collaboration tools like Slack, Zoom, and Trello for remote work.

    • I understand the import...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Domain knowledge, which you really works strong in those areas. Don’t watch more youtube videos and Prepare

Interview Questions & Answers

user image Roop Kishor

posted on 7 Dec 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your career story
  • Q2. What is the benefits of hiring you.
  • Ans. 

    I bring extensive experience, technical expertise, and a collaborative approach to enhance project outcomes in engineering geology.

    • Proven track record in geotechnical investigations, leading to successful project completions, such as the XYZ Bridge project.

    • Strong analytical skills, demonstrated by my ability to assess complex geological data and provide actionable insights.

    • Effective communication and teamwork, as evide...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What are RMR and Q system?
  • Q2. Describe about Instruments in tunnel alignments.
  • Q3. Describe Mapping in CHI?
  • Ans. 

    Mapping in CHI involves creating spatial representations of geotechnical data for analysis and decision-making.

    • Utilizes Geographic Information Systems (GIS) to visualize subsurface conditions.

    • Helps in identifying soil types, rock formations, and groundwater levels.

    • Facilitates risk assessment for construction projects by mapping potential hazards.

    • Example: Mapping landslide-prone areas to inform infrastructure planning.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - where ever you work must concentrate and learn in the particular field. can't run for salary and jump new company. All companies al most same. Try to create your own image through hard and smart work. Definitely one day you like your same company like your family.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What is the procedure for aligning the bed of a precast segment curve span?
  • Q2. What is the method for calculating the volume of concrete?
  • Q3. What is the method for calculating the cut length of stirrups?
  • Q4. What is the process for compacting concrete?
  • Q5. How do you manage your contractor workers?
  • Q6. What is the full form of PPE?
  • Q7. What does the acronym SHE stand for?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. How do you plan to accomplish your work tasks?
  • Ans. 

    I prioritize tasks, utilize project management tools, and collaborate with team members to ensure timely and efficient completion of work.

    • Set clear goals and deadlines for each project phase, such as completing initial designs within two weeks.

    • Use project management software like MS Project or Trello to track progress and manage resources effectively.

    • Conduct regular team meetings to discuss challenges and share updates...

  • Answered by AI
  • Q2. How do you plan to complete your work?
  • Ans. 

    I plan to complete my work through structured planning, effective communication, and continuous monitoring of project progress.

    • Develop a detailed project plan outlining tasks, timelines, and resources needed.

    • Utilize project management software to track progress and adjust schedules as necessary.

    • Conduct regular team meetings to ensure everyone is aligned and address any challenges.

    • Implement quality control measures at e...

  • Answered by AI
  • Q3. What are your responsibilities within your company?
  • Ans. 

    As a Civil Structural Engineer, I oversee design, analysis, and project management to ensure safe and efficient structures.

    • Conduct structural analysis to determine load-bearing capacities and material strengths.

    • Design structures such as bridges and buildings, ensuring compliance with safety codes.

    • Collaborate with architects and other engineers to integrate structural elements into overall designs.

    • Prepare detailed const...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. HSE compliances
  • Q2. Resolved client

Interview Preparation Tips

Interview preparation tips for other job seekers - I want to give best performance in any organization
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is planning?
  • Ans. 

    Planning is the process of setting goals, determining actions to achieve those goals, and allocating resources to accomplish the goals.

    • Setting goals and objectives

    • Identifying actions and tasks needed to achieve the goals

    • Allocating resources such as time, money, and manpower

    • Creating schedules and timelines

    • Monitoring progress and making adjustments as needed

  • Answered by AI
  • Q2. What you have done in your internship explain in details
  • Ans. 

    During my internship, I assisted in creating project schedules, tracking progress, and analyzing delays.

    • Assisted in creating project schedules using software like Primavera P6

    • Tracked progress by updating Gantt charts and critical path analysis

    • Analyzed delays by identifying causes and proposing mitigation strategies

  • Answered by AI

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Afcons Infrastructure?
Ask anonymously on communities.

Afcons Infrastructure Interview FAQs

How many rounds are there in Afcons Infrastructure interview?
Afcons Infrastructure interview process usually has 2-3 rounds. The most common rounds in the Afcons Infrastructure interview process are Technical, Resume Shortlist and HR.
How to prepare for Afcons Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Afcons Infrastructure. The most common topics and skills that interviewers at Afcons Infrastructure expect are Industrial Safety, Construction Safety, Bridges, Primavera and Safety Management.
What are the top questions asked in Afcons Infrastructure interview?

Some of the top questions asked at the Afcons Infrastructure interview -

  1. In which code you are proficient, ASME, IS, BSEN, ISO stande...read more
  2. What is a material received pros...read more
  3. 1) DESCRIBE ABOUT THE WORKING OF TRANSMISSION OF WHEEL LOADER. 2) SHARE THE WOR...read more
What are the most common questions asked in Afcons Infrastructure HR round?

The most common HR questions asked in Afcons Infrastructure interview are -

  1. Why are you looking for a chan...read more
  2. What are your salary expectatio...read more
  3. Where do you see yourself in 5 yea...read more
How long is the Afcons Infrastructure interview process?

The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.4/5

based on 239 interview experiences

Difficulty level

Easy 19%
Moderate 64%
Hard 16%

Duration

Less than 2 weeks 79%
2-4 weeks 11%
4-6 weeks 3%
6-8 weeks 3%
More than 8 weeks 3%
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 515 Interviews
KEC International Interview Questions
4.0
 • 361 Interviews
TCE Interview Questions
3.8
 • 271 Interviews
Saint-Gobain Interview Questions
4.0
 • 188 Interviews
Worley Interview Questions
4.1
 • 125 Interviews
Power Mech Projects Interview Questions
3.8
 • 106 Interviews
GMR Group Interview Questions
4.0
 • 94 Interviews
View all

Afcons Infrastructure Reviews and Ratings

based on 2.7k reviews

4.2/5

Rating in categories

4.1

Skill development

3.8

Work-life balance

4.0

Salary

4.1

Job security

4.0

Company culture

3.7

Promotions

3.9

Work satisfaction

Explore 2.7k Reviews and Ratings
Safety Engineer

Dahej,

Jamnagar

+1

8-13 Yrs

Not Disclosed

Design Coordinator - Water Segment - India & Africa

Jaunpur,

Dungarpur

+1

3-8 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
416 salaries
unlock blur

₹7.4 L/yr - ₹13.1 L/yr

Assistant Manager
214 salaries
unlock blur

₹9 L/yr - ₹14.3 L/yr

Planning Engineer
194 salaries
unlock blur

₹4.9 L/yr - ₹10 L/yr

Civil Engineer
193 salaries
unlock blur

₹3.5 L/yr - ₹8.4 L/yr

Executive Engineer
178 salaries
unlock blur

₹4.7 L/yr - ₹10.1 L/yr

Explore more salaries
Compare Afcons Infrastructure with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.2
Compare

Nagarjuna Construction Company

4.1
Compare
write
Share an Interview