I manage P&L by analyzing financial data, optimizing costs, and driving revenue growth through strategic initiatives.
Regularly review financial statements to identify trends and variances.
Implement cost-control measures, such as renegotiating supplier contracts.
Develop revenue-enhancing strategies, like launching new products or services.
Collaborate with department heads to align operational goals with financi...
Creating Bill of Quantities (BOQs) involves detailed measurement and estimation of materials and labor for construction projects.
Identify project scope: Understand the project requirements and specifications.
Conduct site measurements: Measure dimensions and quantities of materials needed.
List items: Create a detailed list of all materials, labor, and equipment required.
Use standard methods: Apply standardized meas...
I will foster a collaborative environment, prioritize communication, and support team members' growth to enhance overall performance.
Establish open communication: Regular one-on-one meetings to discuss concerns and feedback.
Encourage teamwork: Organize team-building activities to strengthen relationships.
Provide training opportunities: Offer workshops or courses for skill enhancement, like leadership training.
Reco...
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
To control plastering thickness, proper preparation, use of guides, and regular measurements are essential.
Ensure the surface is clean and free from debris before applying plaster.
Use guides such as screeds or battens to maintain a consistent thickness.
Regularly measure the thickness using a measuring tape or a thickness gauge.
Adjust the amount of plaster applied based on the measurements to achieve the desired th...
Cross checking column position in land surveying
Cross check column position by comparing measurements from different surveying techniques
Use multiple surveying instruments to verify column positions
Compare measurements with existing reference points or benchmarks
Ensure accuracy by repeating measurements and averaging the results
Document and record all measurements and cross-checking steps for future reference
To control deviation in vertically elements, proper leveling techniques and equipment must be used.
Use a precise leveling instrument such as a digital level or an automatic level
Ensure the instrument is properly calibrated before use
Establish a benchmark or reference point for vertical control
Use a leveling rod or staff to measure height differences accurately
Perform regular checks and adjustments during the surve...
Concrete grades indicate the compressive strength and mix proportions, essential for structural integrity.
Grades are denoted by 'M' followed by a number, e.g., M20, M25, indicating compressive strength in N/mm².
M20 concrete has a mix ratio of 1:1.5:3 (Cement:Sand:Aggregate) and is commonly used for residential structures.
Higher grades like M30 and M40 are used for commercial buildings and heavy structures due to t...
LD reduces workability and increases the risk of cracking in high grade concrete.
LD (Lignite Dust) is a fine powder that is added to concrete to improve workability.
However, in high grade concrete, LD can reduce workability and increase the risk of cracking.
This is because high grade concrete has a lower water-cement ratio, which means there is less water available to hydrate the cement and make the concrete worka...
I will analyze the reasons for the cost overrun and develop a plan to mitigate it.
Identify the root cause of the cost overrun
Review the project budget and timeline
Develop a plan to reduce costs without compromising quality
Communicate the situation to stakeholders and seek their input
Implement the plan and monitor progress closely
I applied via Naukri.com and was interviewed before Sep 2019. There were 5 interview rounds.
The construction cost was $10 million.
The total cost of construction was $10 million.
The cost included materials, labor, and equipment.
The project was completed within budget.
The cost was higher than anticipated due to unexpected delays.
The cost was lower than expected due to efficient planning and management.
I will analyze the reasons for the cost overrun and develop a plan to mitigate it.
Identify the root cause of the cost overrun
Review the project budget and timeline
Develop a plan to reduce costs without compromising quality
Communicate the situation to stakeholders and seek their input
Implement the plan and monitor progress closely
It depends on the project and its priorities.
Cost over run may be acceptable if the project has a tight budget and the delay is not critical.
Time over run may be acceptable if the project has a strict deadline and the additional cost can be managed.
Both cost and time over runs should be avoided as they can impact the project's success and reputation.
The decision should be based on a thorough analysis of the project's p...
It depends on the project and its priorities.
If the project is time-sensitive, then time under budget is worse.
If the project has a fixed deadline, then cost under budget is worse.
If the project has both time and cost constraints, then it depends on which constraint is more critical.
In general, it is better to have a balanced approach to managing both time and cost.
It is important to communicate any deviations from the...
I appeared for an interview in May 2025, where I was asked the following questions.
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
Creating Bill of Quantities (BOQs) involves detailed measurement and estimation of materials and labor for construction projects.
Identify project scope: Understand the project requirements and specifications.
Conduct site measurements: Measure dimensions and quantities of materials needed.
List items: Create a detailed list of all materials, labor, and equipment required.
Use standard methods: Apply standardized measureme...
I manage P&L by analyzing financial data, optimizing costs, and driving revenue growth through strategic initiatives.
Regularly review financial statements to identify trends and variances.
Implement cost-control measures, such as renegotiating supplier contracts.
Develop revenue-enhancing strategies, like launching new products or services.
Collaborate with department heads to align operational goals with financial ta...
I will foster a collaborative environment, prioritize communication, and support team members' growth to enhance overall performance.
Establish open communication: Regular one-on-one meetings to discuss concerns and feedback.
Encourage teamwork: Organize team-building activities to strengthen relationships.
Provide training opportunities: Offer workshops or courses for skill enhancement, like leadership training.
Recognize...
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
LPA stands for Lasting Power of Attorney, which is a legal document that allows a person to appoint someone to make decisions on their behalf. FAO refers to Foreign Account Operations, which involves managing financial accounts held outside one's home country.
LPA is used in the context of appointing someone to act on behalf of an individual in case they become mentally incapacitated.
FAO involves managing financial acco...
You need to calculate the quantities of materials from drawings randomly given to you.
To control deviation in vertically elements, proper leveling techniques and equipment must be used.
Use a precise leveling instrument such as a digital level or an automatic level
Ensure the instrument is properly calibrated before use
Establish a benchmark or reference point for vertical control
Use a leveling rod or staff to measure height differences accurately
Perform regular checks and adjustments during the survey to ...
Cross checking column position in land surveying
Cross check column position by comparing measurements from different surveying techniques
Use multiple surveying instruments to verify column positions
Compare measurements with existing reference points or benchmarks
Ensure accuracy by repeating measurements and averaging the results
Document and record all measurements and cross-checking steps for future reference
To control plastering thickness, proper preparation, use of guides, and regular measurements are essential.
Ensure the surface is clean and free from debris before applying plaster.
Use guides such as screeds or battens to maintain a consistent thickness.
Regularly measure the thickness using a measuring tape or a thickness gauge.
Adjust the amount of plaster applied based on the measurements to achieve the desired thickne...
Top trending discussions
The duration of ATS Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 28 interview experiences
Difficulty level
Duration
based on 491 reviews
Rating in categories
Assistant Manager
59
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Project Engineer
54
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Civil Foreman
44
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Assistant Project Manager
36
salaries
| ₹7.1 L/yr - ₹11 L/yr |
Senior Project Engineer
32
salaries
| ₹6 L/yr - ₹8.4 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties