Upload Button Icon Add office photos

Cushman & Wakefield

Compare button icon Compare button icon Compare

Filter interviews by

Cushman & Wakefield Interview Questions and Answers

Updated 30 Jun 2025
Popular Designations

56 Interview questions

An Assistant Manager HSE was asked
Q. Safety Precautions during Lifting & Excavation.
Ans. 

Safety precautions during lifting and excavation involve proper planning, training, equipment, and communication.

  • Conduct a risk assessment before starting any lifting or excavation work

  • Ensure workers are properly trained on safe lifting techniques and excavation procedures

  • Use appropriate equipment such as cranes, hoists, and excavators

  • Ensure proper communication between workers during lifting and excavation operat...

View all Assistant Manager HSE interview questions
An Assistant Manager Procurement was asked 12mo ago
Q. Rating of vendor
Ans. 

Vendor rating is crucial for evaluating performance and making informed decisions.

  • Vendor rating is typically based on factors such as quality of products/services, delivery timeliness, pricing, and customer service.

  • It is important to regularly assess and update vendor ratings to ensure optimal procurement outcomes.

  • Examples of vendor rating systems include star ratings, numerical scores, and qualitative assessments...

View all Assistant Manager Procurement interview questions
An Assistant Manager was asked 12mo ago
Q. Check point of plastering
Ans. 

Check point of plastering is a crucial step in ensuring a smooth and even finish on walls or ceilings.

  • Check for any uneven areas or bumps in the plaster surface

  • Ensure that the plaster is fully dried before proceeding to the next step

  • Use a straight edge or level to check for any dips or high spots in the plaster

  • Inspect the corners and edges for any rough or unfinished areas

  • Make sure to sand down any rough patches b...

View all Assistant Manager interview questions
A Software Developer was asked
Q. How do you design metro line for new station
Ans. 

Designing a metro line for a new station involves planning routes, considering passenger flow, and ensuring connectivity.

  • Conduct a feasibility study to determine the need for a new station

  • Consider factors such as population density, traffic patterns, and potential future growth

  • Plan the route to optimize connectivity with existing stations and transportation hubs

  • Design the station layout to accommodate passenger fl...

View all Software Developer interview questions
An Import Documentation Executive was asked
Q. English summary of the best way
Ans. 

The best way to summarize a document in English

  • Identify key points and main ideas

  • Use concise language and avoid unnecessary details

  • Organize information in a logical order

  • Include a brief introduction and conclusion

  • Avoid plagiarism by using your own words

  • Proofread for errors and clarity

View all Import Documentation Executive interview questions
A Facility Manager was asked
Q. Required pressure on top floor in Fire line
Ans. 

The required pressure on the top floor in the fire line depends on the building's height and the water supply available.

  • The pressure should be high enough to reach the top floor and provide adequate water flow for firefighting.

  • The National Fire Protection Association (NFPA) recommends a minimum pressure of 100 psi at the top floor.

  • Factors such as the building's height, water supply, and fire protection system shou...

View all Facility Manager interview questions

Cushman & Wakefield Interview Experiences

92 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. How can facility manager effevtively incorporate sustainable practices into building operations without significantly increasing operational costs ?
  • Ans. 

    Facility managers can adopt sustainable practices by optimizing resources, enhancing efficiency, and leveraging technology without high costs.

    • Implement energy-efficient lighting, such as LED bulbs, which reduce energy consumption and last longer than traditional bulbs.

    • Conduct regular maintenance on HVAC systems to ensure they operate efficiently, reducing energy waste and prolonging equipment life.

    • Utilize smart buildin...

  • Answered by AI
  • Q2. How can effective facility management contribute to an organization's sustainability goal,and what are some key strategies to implement sustainable practices in facility operation ?
  • Ans. 

    Effective facility management enhances sustainability by optimizing resources and reducing waste through strategic practices.

    • Implement energy-efficient systems, such as LED lighting and smart HVAC controls, to reduce energy consumption.

    • Adopt water conservation measures, like low-flow fixtures and rainwater harvesting, to minimize water usage.

    • Utilize sustainable materials in facility construction and maintenance, such a...

  • Answered by AI
  • Q3. How does effective facility management contribute to the overall productivity and sustainability of an organization ?
  • Ans. 

    Effective facility management enhances productivity and sustainability by optimizing resources, improving safety, and fostering a positive work environment.

    • Optimizes resource utilization: Efficient use of energy and materials reduces waste and costs, e.g., implementing energy-efficient lighting.

    • Enhances employee productivity: Well-maintained facilities create a comfortable work environment, leading to higher employee s...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Resume discussion, how did you overcome stress etc
  • Q2. Previous work experience
  • Ans. 

    I have 3 years of experience working as a Supply Chain Analyst for a large retail company.

    • Managed inventory levels to ensure optimal stock levels and minimize excess inventory

    • Analyzed supply chain data to identify trends and make recommendations for process improvements

    • Collaborated with vendors to negotiate pricing and terms for supply contracts

  • Answered by AI
Round 2 - Case Study 

2 excel sheets where given, to analyze and interpret the data to give a better solution for the problem given

Round 3 - One-on-one 

(2 Questions)

  • Q1. Aptitude question
  • Q2. Why did you choose this career, why planned to switch
  • Ans. 

    I chose this career because of my interest in data analysis and problem-solving in the supply chain industry.

    • Passion for data analysis and problem-solving

    • Interest in the supply chain industry

    • Opportunity for growth and advancement

    • Desire to make a positive impact on business operations

  • Answered by AI

Shift Engineer Interview Questions & Answers

user image Ashish Kumar Yadav

posted on 4 Jun 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. LT, HT, TRF, DG, CHILLER, AHU, WTP, STP etc
  • Q2. All utility department
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, including timelines, resources, and budget.

    • Executing: Implement the project plan and manage resources effectively.

    • Monitoring: Track project progress, identify risks, and make necessary adjustments.

    • Closing: Finalize...

  • Answered by AI
  • Q2. How to manage risk and mitigation plan
  • Ans. 

    Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.

    • Identify potential risks by conducting a thorough risk assessment

    • Assess the likelihood and impact of each risk on the project

    • Prioritize risks based on their severity and potential impact

    • Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...

  • Answered by AI
  • Q3. How will you track Long lead item
  • Ans. 

    Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.

    • Create a detailed schedule outlining the delivery dates of long lead items

    • Regularly monitor the progress of long lead items to ensure they are on track

    • Communicate effectively with suppliers to address any delays or issues

    • Utilize project management software to track and manage long lead items

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Day today task in last organization
  • Ans. 

    In my last organization, my day-to-day tasks included providing technical support to end users, troubleshooting hardware and software issues, and managing IT tickets.

    • Providing technical support to end users

    • Troubleshooting hardware and software issues

    • Managing IT tickets

  • Answered by AI
  • Q2. Technical support questions by interview

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Apr 2025, where I was asked the following questions.

  • Q1. Housekeeping progress
  • Ans. 

    Housekeeping progress involves evaluating cleanliness, efficiency, and staff performance to enhance service quality.

    • Regular inspections ensure standards are met; for example, checking guest rooms daily.

    • Implementing training programs for staff improves service quality; for instance, teaching proper cleaning techniques.

    • Utilizing feedback from guests helps identify areas for improvement; for example, surveys after their s...

  • Answered by AI
  • Q2. Machinery progress
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Frequency of updating of baseline schedule
  • Ans. 

    Baseline schedules should be updated regularly to reflect changes in project scope, timeline, and resources.

    • Baseline schedules should be updated at key project milestones or when significant changes occur.

    • Regular updates ensure that the schedule remains accurate and reflects the current status of the project.

    • Updates should be communicated to all stakeholders to keep them informed of any changes.

    • Examples of changes that...

  • Answered by AI
  • Q2. What is crashing of schedule
  • Ans. 

    Crashing of schedule is a technique used in project management to shorten the project duration by adding more resources.

    • Crashing involves adding more resources to critical path activities to reduce the overall project duration.

    • It is typically used when there is a need to meet a deadline or when there are financial incentives for early completion.

    • Crashing may increase project costs due to the additional resources requir...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Basic introduction
  • Q2. Man-management knowledge
Round 2 - One-on-one 

(2 Questions)

  • Q1. SOP creations with Engineering guidelines
  • Ans. 

    Creating SOPs with engineering guidelines involves documenting step-by-step procedures based on engineering principles.

    • Understand the engineering processes and requirements

    • Collaborate with engineers to ensure accuracy and effectiveness

    • Document procedures in a clear and concise manner

    • Include safety measures and quality control checkpoints

    • Regularly review and update SOPs based on feedback and changes in engineering guide...

  • Answered by AI
  • Q2. Technical knowledge related to MEP and civil as well

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain confidently about yourself and showcase your technical knowledge as per previous experiences
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me about yourself.
  • Ans. 

    I am a detail-oriented and experienced Executive Accountant with a strong background in financial analysis and reporting.

    • I have over 8 years of experience in accounting and finance.

    • I am skilled in budgeting, forecasting, and financial modeling.

    • I have a proven track record of improving financial processes and increasing efficiency.

    • I am proficient in using accounting software such as QuickBooks and SAP.

    • I have a Bachelor'...

  • Answered by AI
Round 2 - Behavioral 

(1 Question)

  • Q1. What is Budgeting and forcasting?
  • Ans. 

    Budgeting and forecasting are financial planning tools used to estimate future revenues and expenses.

    • Budgeting involves setting financial goals and creating a plan to achieve them.

    • Forecasting involves predicting future financial outcomes based on historical data and trends.

    • Budgeting helps in allocating resources effectively, while forecasting helps in making informed decisions.

    • Examples: Creating an annual budget for a ...

  • Answered by AI

Accountant Interview Questions & Answers

user image Anonymous

posted on 27 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via LinkedIn

Round 1 - HR 

(2 Questions)

  • Q1. Work related questions
  • Q2. Basic questions to clarify the contents of resume
Round 2 - One-on-one 

(1 Question)

  • Q1. Extensive discussion about work experience

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Cushman & Wakefield?
Ask anonymously on communities.

Cushman & Wakefield Interview FAQs

How many rounds are there in Cushman & Wakefield interview?
Cushman & Wakefield interview process usually has 2-3 rounds. The most common rounds in the Cushman & Wakefield interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for Cushman & Wakefield interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Cushman & Wakefield. The most common topics and skills that interviewers at Cushman & Wakefield expect are Career Development, Agile Coaching, Project Management, Architecture and Facility Management.
What are the top questions asked in Cushman & Wakefield interview?

Some of the top questions asked at the Cushman & Wakefield interview -

  1. What kind of water proofing application are used on terrace roof slab of the co...read more
  2. What is the of floor to floor height of the Commercial building...read more
  3. Which type ac unit using for server ro...read more
How long is the Cushman & Wakefield interview process?

The duration of Cushman & Wakefield interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.4/5

based on 125 interview experiences

Difficulty level

Easy 17%
Moderate 74%
Hard 9%

Duration

Less than 2 weeks 66%
2-4 weeks 19%
4-6 weeks 4%
6-8 weeks 6%
More than 8 weeks 6%
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 410 Interviews
CBRE Interview Questions
4.1
 • 300 Interviews
Sobha Interview Questions
3.8
 • 148 Interviews
Kalpataru Limited Interview Questions
4.1
 • 143 Interviews
Lodha Group Interview Questions
4.0
 • 140 Interviews
Godrej Properties Interview Questions
3.6
 • 106 Interviews
DLF Interview Questions
3.9
 • 86 Interviews
Colliers India Interview Questions
3.9
 • 76 Interviews
View all

Cushman & Wakefield Reviews and Ratings

based on 1.4k reviews

4.1/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

3.8

Salary

4.0

Job security

4.0

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 1.4k Reviews and Ratings
Manager - Client Services

Gurgaon / Gurugram

5-10 Yrs

Not Disclosed

Assistant Vice President

Mumbai

12-17 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
327 salaries
unlock blur

₹5.3 L/yr - ₹12.5 L/yr

Facility Executive
164 salaries
unlock blur

₹2.7 L/yr - ₹7.2 L/yr

Project Manager
139 salaries
unlock blur

₹8.9 L/yr - ₹15.5 L/yr

Project Engineer
131 salaries
unlock blur

₹4.5 L/yr - ₹10.8 L/yr

Facility Manager
122 salaries
unlock blur

₹5.4 L/yr - ₹12.4 L/yr

Explore more salaries
Compare Cushman & Wakefield with

JLL

4.1
Compare

CBRE

4.1
Compare

Sobha

3.8
Compare

Lodha Group

4.0
Compare
write
Share an Interview