Filter interviews by
Safety precautions during lifting and excavation involve proper planning, training, equipment, and communication.
Conduct a risk assessment before starting any lifting or excavation work
Ensure workers are properly trained on safe lifting techniques and excavation procedures
Use appropriate equipment such as cranes, hoists, and excavators
Ensure proper communication between workers during lifting and excavation operat...
Vendor rating is crucial for evaluating performance and making informed decisions.
Vendor rating is typically based on factors such as quality of products/services, delivery timeliness, pricing, and customer service.
It is important to regularly assess and update vendor ratings to ensure optimal procurement outcomes.
Examples of vendor rating systems include star ratings, numerical scores, and qualitative assessments...
Check point of plastering is a crucial step in ensuring a smooth and even finish on walls or ceilings.
Check for any uneven areas or bumps in the plaster surface
Ensure that the plaster is fully dried before proceeding to the next step
Use a straight edge or level to check for any dips or high spots in the plaster
Inspect the corners and edges for any rough or unfinished areas
Make sure to sand down any rough patches b...
Designing a metro line for a new station involves planning routes, considering passenger flow, and ensuring connectivity.
Conduct a feasibility study to determine the need for a new station
Consider factors such as population density, traffic patterns, and potential future growth
Plan the route to optimize connectivity with existing stations and transportation hubs
Design the station layout to accommodate passenger fl...
The best way to summarize a document in English
Identify key points and main ideas
Use concise language and avoid unnecessary details
Organize information in a logical order
Include a brief introduction and conclusion
Avoid plagiarism by using your own words
Proofread for errors and clarity
The required pressure on the top floor in the fire line depends on the building's height and the water supply available.
The pressure should be high enough to reach the top floor and provide adequate water flow for firefighting.
The National Fire Protection Association (NFPA) recommends a minimum pressure of 100 psi at the top floor.
Factors such as the building's height, water supply, and fire protection system shou...
I appeared for an interview in May 2025, where I was asked the following questions.
Facility managers can adopt sustainable practices by optimizing resources, enhancing efficiency, and leveraging technology without high costs.
Implement energy-efficient lighting, such as LED bulbs, which reduce energy consumption and last longer than traditional bulbs.
Conduct regular maintenance on HVAC systems to ensure they operate efficiently, reducing energy waste and prolonging equipment life.
Utilize smart buildin...
Effective facility management enhances sustainability by optimizing resources and reducing waste through strategic practices.
Implement energy-efficient systems, such as LED lighting and smart HVAC controls, to reduce energy consumption.
Adopt water conservation measures, like low-flow fixtures and rainwater harvesting, to minimize water usage.
Utilize sustainable materials in facility construction and maintenance, such a...
Effective facility management enhances productivity and sustainability by optimizing resources, improving safety, and fostering a positive work environment.
Optimizes resource utilization: Efficient use of energy and materials reduces waste and costs, e.g., implementing energy-efficient lighting.
Enhances employee productivity: Well-maintained facilities create a comfortable work environment, leading to higher employee s...
I applied via Referral and was interviewed in Nov 2024. There were 3 interview rounds.
I have 3 years of experience working as a Supply Chain Analyst for a large retail company.
Managed inventory levels to ensure optimal stock levels and minimize excess inventory
Analyzed supply chain data to identify trends and make recommendations for process improvements
Collaborated with vendors to negotiate pricing and terms for supply contracts
2 excel sheets where given, to analyze and interpret the data to give a better solution for the problem given
I chose this career because of my interest in data analysis and problem-solving in the supply chain industry.
Passion for data analysis and problem-solving
Interest in the supply chain industry
Opportunity for growth and advancement
Desire to make a positive impact on business operations
I appeared for an interview in May 2025, where I was asked the following questions.
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Executing: Implement the project plan and manage resources effectively.
Monitoring: Track project progress, identify risks, and make necessary adjustments.
Closing: Finalize...
Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.
Identify potential risks by conducting a thorough risk assessment
Assess the likelihood and impact of each risk on the project
Prioritize risks based on their severity and potential impact
Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...
Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.
Create a detailed schedule outlining the delivery dates of long lead items
Regularly monitor the progress of long lead items to ensure they are on track
Communicate effectively with suppliers to address any delays or issues
Utilize project management software to track and manage long lead items
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
In my last organization, my day-to-day tasks included providing technical support to end users, troubleshooting hardware and software issues, and managing IT tickets.
Providing technical support to end users
Troubleshooting hardware and software issues
Managing IT tickets
I appeared for an interview in Apr 2025, where I was asked the following questions.
Housekeeping progress involves evaluating cleanliness, efficiency, and staff performance to enhance service quality.
Regular inspections ensure standards are met; for example, checking guest rooms daily.
Implementing training programs for staff improves service quality; for instance, teaching proper cleaning techniques.
Utilizing feedback from guests helps identify areas for improvement; for example, surveys after their s...
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Baseline schedules should be updated regularly to reflect changes in project scope, timeline, and resources.
Baseline schedules should be updated at key project milestones or when significant changes occur.
Regular updates ensure that the schedule remains accurate and reflects the current status of the project.
Updates should be communicated to all stakeholders to keep them informed of any changes.
Examples of changes that...
Crashing of schedule is a technique used in project management to shorten the project duration by adding more resources.
Crashing involves adding more resources to critical path activities to reduce the overall project duration.
It is typically used when there is a need to meet a deadline or when there are financial incentives for early completion.
Crashing may increase project costs due to the additional resources requir...
Creating SOPs with engineering guidelines involves documenting step-by-step procedures based on engineering principles.
Understand the engineering processes and requirements
Collaborate with engineers to ensure accuracy and effectiveness
Document procedures in a clear and concise manner
Include safety measures and quality control checkpoints
Regularly review and update SOPs based on feedback and changes in engineering guide...
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
I am a detail-oriented and experienced Executive Accountant with a strong background in financial analysis and reporting.
I have over 8 years of experience in accounting and finance.
I am skilled in budgeting, forecasting, and financial modeling.
I have a proven track record of improving financial processes and increasing efficiency.
I am proficient in using accounting software such as QuickBooks and SAP.
I have a Bachelor'...
Budgeting and forecasting are financial planning tools used to estimate future revenues and expenses.
Budgeting involves setting financial goals and creating a plan to achieve them.
Forecasting involves predicting future financial outcomes based on historical data and trends.
Budgeting helps in allocating resources effectively, while forecasting helps in making informed decisions.
Examples: Creating an annual budget for a ...
I applied via LinkedIn
Top trending discussions
The duration of Cushman & Wakefield interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 125 interview experiences
Difficulty level
Duration
based on 1.4k reviews
Rating in categories
Assistant Manager
327
salaries
| ₹5.3 L/yr - ₹12.5 L/yr |
Facility Executive
164
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Project Manager
139
salaries
| ₹8.9 L/yr - ₹15.5 L/yr |
Project Engineer
131
salaries
| ₹4.5 L/yr - ₹10.8 L/yr |
Facility Manager
122
salaries
| ₹5.4 L/yr - ₹12.4 L/yr |
JLL
CBRE
Sobha
Lodha Group