Upload Button Icon Add office photos

Dee Piping System

Compare button icon Compare button icon Compare

Filter interviews by

Dee Piping System Deputy Manager Interview Questions and Answers

Updated 7 Mar 2023

Dee Piping System Deputy Manager Interview Experiences

1 interview found

Deputy Manager Interview Questions & Answers

user image ASHISH GAUTAM

posted on 7 Mar 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Medium level aptitude test with technical analysis based questions

Round 3 - Technical 

(1 Question)

  • Q1. Based of position applied for
Round 4 - Technical 

(1 Question)

  • Q1. Drawing and technical knowledge based

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared before going for interview

thoroughly study and analyse the JD

Top trending discussions

View All
Interview Tips & Stories
2w (edited)
timepasstiwari
·
A Digital Markter
Nailed the interview, still rejected
Just had the BEST interview ever – super positive and encouraging! But got rejected. Interviewer said I was the most prepared, knew it was a full-time role (unlike others), and loved my answers. One of my questions was even called "the best ever asked!" He showed me around, said I was exactly what they wanted, and would get back by Friday. I was so hyped! Then today, I got the rejection email. No reason given, just "went with someone else." Feels bad when your best isn't enough. Anyone else been there? How'd you cope?
Got a question about Dee Piping System?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Naukri.com

Interview Questionnaire 

1 Question

  • Q1. Technical

Interview Preparation Tips

Interview preparation tips for other job seekers - In mechanical interview, mainly u will be asked for the name of the eqpts and models u had dealt. Then questions will be asked about detail features of any eqpt. Fuel consumption is a must question. Again it will continue for other eqpts and plant. In plant mainly HMP and crusher will be asked.

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sell our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you would check to sanction a loan ... read more
Q4. What actions do you take when there is a shortage of materials re ... read more
Q5. What was your major area of study in your master's program?
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normally every company asked
Round 3 - Technical 

(1 Question)

  • Q1. It's all about Aroject Management
Round 4 - Technical 

(1 Question)

  • Q1. All the process of Construction, Management and client dealing.
  • Ans. 

    The process involves overseeing construction projects, managing resources, and maintaining client relationships.

    • Overseeing construction projects from start to finish

    • Managing resources such as materials, labor, and equipment

    • Maintaining client relationships through effective communication and problem-solving

    • Ensuring projects are completed on time and within budget

    • Adhering to safety regulations and quality standards

    • Handli...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. CBR requirement of soil.
  • Ans. 

    CBR requirement of soil is a measure of its strength and ability to support heavy loads.

    • CBR stands for California Bearing Ratio.

    • It is a measure of the strength of a soil to support loads applied to it.

    • Higher CBR values indicate stronger soil.

    • CBR values are used in designing pavement structures.

    • Different types of soil have different CBR requirements.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Scheduling to update in MSP.
  • Ans. 

    Scheduling to update in MSP involves inputting and adjusting project tasks and timelines in Microsoft Project.

    • Input new tasks and deadlines

    • Adjust existing tasks and timelines as needed

    • Ensure dependencies are accurately reflected

    • Regularly review and update the schedule

    • Communicate any changes to team members

  • Answered by AI
  • Q2. General procedure for structural concrete.
  • Ans. 

    General procedure for structural concrete involves mixing, pouring, and curing concrete to create a strong and durable structure.

    • Prepare the site by setting up formwork and ensuring proper reinforcement

    • Mix concrete ingredients in the correct proportions

    • Pour the concrete into the formwork and level it

    • Allow the concrete to cure and gain strength over time

    • Finish the surface as needed for the specific application

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
-

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Telephonic Call 

(1 Question)

  • Q1. Roles and Responsibilities
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family Background
  • Q2. Who is ur father etc…. Locality and all
  • Ans. 

    My father is a retired government official who served in the education department. We live in a peaceful neighborhood in the suburbs.

    • My father is a retired government official

    • He worked in the education department

    • We live in a peaceful neighborhood in the suburbs

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join … No relieveing letter or experience letter after serving notice period …. Wrost company
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

How to handle team. How you will give satisfactory response to clients

Round 2 - One-on-one 

(1 Question)

  • Q1. How to tackle clients?
  • Ans. 

    Tackling clients involves building relationships, understanding their needs, and providing excellent customer service.

    • Listen actively to clients to understand their needs and concerns

    • Communicate clearly and effectively to address any issues or questions

    • Provide personalized solutions and excellent customer service to build trust and loyalty

    • Follow up with clients to ensure satisfaction and address any further needs

    • Handle...

  • Answered by AI

I appeared for an interview in Oct 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is your name and your fathers name
  • Q2. How many steps should we take to check an review of another company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Had to check details about another cimoany and it forced me to write review compulsory. So wrote th8s.

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How good are you at handling complaints related to air conditioners?
  • Ans. 

    I am highly skilled in handling complaints related to air conditioners.

    • I have extensive knowledge of air conditioning systems and their common issues.

    • I am experienced in troubleshooting and resolving air conditioner complaints.

    • I have excellent communication skills to effectively address customer concerns.

    • I am adept at managing customer expectations and providing satisfactory solutions.

    • I am familiar with industry standa...

  • Answered by AI
  • Q2. What service revenue can you get for S&W, knowing pretty well that they are only a contractor and not OEM?
  • Ans. 

    As a Service Manager, I can generate service revenue for S&W by offering maintenance contracts, upgrades, and training services.

    • Offering maintenance contracts for regular servicing and repairs

    • Providing upgrades to improve equipment performance

    • Offering training services to improve customer knowledge and skills

    • Selling spare parts and consumables

    • Providing technical support and troubleshooting services

  • Answered by AI
  • Q3. I did not commit a figure, but said I might be able to get around 50 lakhs service revenue per year through AMCs, do and charge jobs. and retrofit jobs.

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview was both a technical one and a HR one. It lasted for about 1 hour. GM (South) interviewed me . It took place at S&W office at Chennai in end Dec 2017. I kept my cool. Most of the questions asked to me were related to my experience in customer service of air conditioners and how I earned service revenue in my previous companies. I answered them to the best of my knowledge. They wanted me to generate good service revenue -at least Rs.2 crore rupees per year .

Dee Piping System Interview FAQs

How many rounds are there in Dee Piping System Deputy Manager interview?
Dee Piping System interview process usually has 4 rounds. The most common rounds in the Dee Piping System interview process are Technical, Resume Shortlist and Aptitude Test.

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Hard 100%

Duration

Less than 2 weeks 100%
View more
Dee Piping System Deputy Manager Salary
based on 34 salaries
₹8.2 L/yr - ₹17 L/yr
14% more than the average Deputy Manager Salary in India
View more details

Dee Piping System Deputy Manager Reviews and Ratings

based on 10 reviews

4.5/5

Rating in categories

4.5

Skill development

4.1

Work-life balance

4.0

Salary

4.2

Job security

4.7

Company culture

4.0

Promotions

4.4

Work satisfaction

Explore 10 Reviews and Ratings
Assistant Engineer
93 salaries
unlock blur

₹2.9 L/yr - ₹5.1 L/yr

Assistant Manager
84 salaries
unlock blur

₹5.7 L/yr - ₹11 L/yr

Senior Engineer
74 salaries
unlock blur

₹4.1 L/yr - ₹10 L/yr

Engineer
65 salaries
unlock blur

₹3.2 L/yr - ₹7.5 L/yr

Junior Engineer
64 salaries
unlock blur

₹2.8 L/yr - ₹4.5 L/yr

Explore more salaries
Compare Dee Piping System with

L&T Energy Hydrocarbon

3.9
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview