Filter interviews by
I applied via Naukri.com and was interviewed in Jul 2022. There were 5 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2020. There were 3 interview rounds.
The interview questions are related to the candidate's current project, construction costs, material checking, project life cycle, compressive strength, rolling margin, project execution, standard deviation, steel wastage, productivity, waterproofing, and thickness of waterproof coat.
Present company project is about...
Total cost of construction per sqft is...
Materials at site are checked by...
Tests performed for tiles ...
Top trending discussions
posted on 12 Jun 2021
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
The sampling frequency for private density test per square meter depends on the type of test being conducted.
The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.
For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Dressing and personality
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
The slab cycle of aluminium shuttering refers to the process of using aluminium formwork for casting slabs in construction projects.
Aluminium shuttering is lightweight and durable, making it ideal for repetitive use in slab construction.
The slab cycle involves setting up the aluminium formwork, pouring concrete, allowing it to cure, and then dismantling the formwork for reuse.
Aluminium shuttering can be easily assemble...
I appeared for an interview in Nov 2024, where I was asked the following questions.
I am ready to join immediately, but I can also accommodate a notice period if required by my current employer.
Immediate Availability: I can start right away, which allows for a quick transition and minimal disruption to the team.
Notice Period Flexibility: If needed, I can negotiate a start date that aligns with my current employer's requirements, typically two weeks.
Preparation Time: I am willing to take a few days to ...
based on 3 interview experiences
Difficulty level
Duration
based on 16 reviews
Rating in categories
Assistant Manager
888
salaries
| ₹5.4 L/yr - ₹21 L/yr |
Senior Executive
523
salaries
| ₹5.5 L/yr - ₹15 L/yr |
Manager
205
salaries
| ₹9 L/yr - ₹35 L/yr |
Sales Executive
121
salaries
| ₹2 L/yr - ₹9 L/yr |
Deputy Manager
108
salaries
| ₹9.5 L/yr - ₹22 L/yr |
Sobha
DLF
Surya Roshni
Emaar India Limited