i
Hilti
Filter interviews by
I prioritize tasks, set clear goals, and allocate time for meetings and follow-ups to ensure productivity and alignment with team objectives.
Start each week by reviewing ongoing projects and deadlines to identify priorities.
Use a digital calendar to block time for key activities, such as client meetings and strategy sessions.
Allocate specific time slots for prospecting new leads, ensuring consistent outreach.
Sched...
India has four seismic zones based on the intensity of earthquakes and their frequency.
India is divided into four seismic zones - Zone 2, 3, 4, and 5
Zone 5 is the most seismically active region, while Zone 2 is the least active
The seismic zones are based on the intensity of earthquakes and their frequency
The zones help in designing earthquake-resistant structures and disaster management plans
Specifications are provided by structural consultants to contractors to ensure that the construction meets the required standards.
Structural consultants provide detailed specifications for the construction project.
These specifications include information on materials, dimensions, and quality standards.
Contractors use these specifications to ensure that the construction meets the required standards.
The specificatio...
Limit state method considers the ultimate load capacity of the structure while working stress method considers the permissible stress limit.
Limit state method is a modern approach while working stress method is an older approach.
Limit state method considers the safety of the structure against ultimate failure while working stress method considers the safety of the structure against yielding.
Limit state method uses...
I prefer not to disclose my current CTC. As for my expected salary, it would depend on the job responsibilities and market standards.
I am not comfortable sharing my current CTC as it is confidential information.
My expected salary would be based on the job responsibilities, company culture, and market standards.
I am open to negotiation and would like to discuss the compensation package in detail.
I am more intereste...
Cracked concrete refers to concrete that has developed cracks due to various reasons.
Cracks in concrete can be caused by shrinkage, settlement, or overload.
Cracks can also be caused by temperature changes, chemical reactions, or poor construction practices.
Cracked concrete can lead to structural problems and should be repaired as soon as possible.
Repair methods for cracked concrete include epoxy injection, concret...
I appeared for an interview before Jul 2024, where I was asked the following questions.
I prioritize tasks, set clear goals, and allocate time for meetings and follow-ups to ensure productivity and alignment with team objectives.
Start each week by reviewing ongoing projects and deadlines to identify priorities.
Use a digital calendar to block time for key activities, such as client meetings and strategy sessions.
Allocate specific time slots for prospecting new leads, ensuring consistent outreach.
Schedule r...
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Limit state method considers the ultimate load capacity of the structure while working stress method considers the permissible stress limit.
Limit state method is a modern approach while working stress method is an older approach.
Limit state method considers the safety of the structure against ultimate failure while working stress method considers the safety of the structure against yielding.
Limit state method uses part...
Cracked concrete refers to concrete that has developed cracks due to various reasons.
Cracks in concrete can be caused by shrinkage, settlement, or overload.
Cracks can also be caused by temperature changes, chemical reactions, or poor construction practices.
Cracked concrete can lead to structural problems and should be repaired as soon as possible.
Repair methods for cracked concrete include epoxy injection, concrete ove...
India has four seismic zones based on the intensity of earthquakes and their frequency.
India is divided into four seismic zones - Zone 2, 3, 4, and 5
Zone 5 is the most seismically active region, while Zone 2 is the least active
The seismic zones are based on the intensity of earthquakes and their frequency
The zones help in designing earthquake-resistant structures and disaster management plans
Specifications are provided by structural consultants to contractors to ensure that the construction meets the required standards.
Structural consultants provide detailed specifications for the construction project.
These specifications include information on materials, dimensions, and quality standards.
Contractors use these specifications to ensure that the construction meets the required standards.
The specifications al...
Developers and PMCs have significant influence on a project's outcome and site development.
Developers can influence the design and functionality of the site through their expertise and experience.
PMCs can influence the project's timeline, budget, and quality through their management and oversight.
Both can influence the site's overall success by ensuring proper planning, communication, and execution.
For example, a devel...
I prefer not to disclose my current CTC. As for my expected salary, it would depend on the job responsibilities and market standards.
I am not comfortable sharing my current CTC as it is confidential information.
My expected salary would be based on the job responsibilities, company culture, and market standards.
I am open to negotiation and would like to discuss the compensation package in detail.
I am more interested in ...
Top trending discussions
I appeared for an interview before Feb 2023.
posted on 26 Jun 2024
Learn basics and try to solve problems
I appeared for an interview in Mar 2025, where I was asked the following questions.
posted on 18 Apr 2025
I appeared for an interview in Oct 2024, where I was asked the following questions.
Ultrasonic and Coriolis mass flowmeters are advanced devices for measuring fluid flow using sound waves and mass principles.
Ultrasonic flowmeters use sound waves to measure the velocity of a fluid, which is then converted to flow rate.
Coriolis mass flowmeters measure the mass flow and density of a fluid by detecting changes in vibration frequency.
Ultrasonic flowmeters are non-intrusive and suitable for various applicat...
I appeared for an interview before Jun 2024, where I was asked the following questions.
Managed diverse projects focusing on team collaboration, process improvement, and client satisfaction across various sectors.
Led a team of 10 in a project to streamline operations, resulting in a 20% increase in efficiency.
Implemented a new customer feedback system that improved client satisfaction scores by 15%.
Coordinated a cross-departmental initiative to reduce costs, saving the company $50,000 annually.
Developed t...
I possess strong leadership, communication, and analytical skills, essential for effective team management and decision-making.
Leadership: Successfully led a team of 10 in a project that increased efficiency by 20%.
Communication: Regularly present project updates to stakeholders, ensuring clarity and alignment.
Analytical Skills: Utilized data analysis to identify trends, leading to a 15% reduction in costs.
I appeared for an interview before Jun 2024, where I was asked the following questions.
I have extensive experience in quality assurance within textile testing labs, ensuring compliance with industry standards.
Conducted regular inspections of raw materials to ensure they met quality specifications.
Implemented standardized testing procedures for fabric strength, colorfastness, and shrinkage.
Collaborated with production teams to address quality issues and improve processes.
Utilized statistical process contr...
I ensure compliance with international testing standards through systematic documentation, regular audits, and continuous training.
Implement a centralized documentation system to track all testing protocols and results.
Conduct regular internal audits to ensure adherence to standards like ISO 17025.
Provide ongoing training for staff on international standards and compliance requirements.
Utilize software tools for real-t...
I resolved a discrepancy in test reports by conducting a thorough investigation and collaborating with the team to ensure accuracy.
Identified the discrepancy during a routine review of test reports.
Gathered all relevant data, including original test results and documentation.
Collaborated with the testing team to understand the testing process and identify potential errors.
Conducted a root cause analysis to determine if...
I have regularly used various instruments for testing fabric and leather, ensuring quality and durability standards are met.
Tensile Strength Tester: Measures the force required to break a fabric or leather sample.
Abrasion Tester: Assesses the wear resistance of materials by simulating friction.
Water Repellency Tester: Evaluates the water resistance of fabrics and leathers.
Colorfastness Tester: Tests how well a material...
I stay updated on testing standards through continuous learning, industry publications, and active participation in professional communities.
Subscribe to industry journals like 'Software Testing & Quality Engineering' for the latest research and trends.
Attend webinars and conferences such as the 'International Conference on Software Testing' to network and learn from experts.
Participate in online forums and communi...
I have trained junior staff using a structured approach, focusing on hands-on experience and continuous feedback.
Developed a comprehensive training plan that included both theoretical knowledge and practical skills.
Utilized shadowing techniques, allowing junior staff to observe experienced technicians in real-time.
Conducted regular feedback sessions to address questions and reinforce learning.
Implemented role-playing s...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
Some of the top questions asked at the Hilti Business Development Manager interview -
based on 1 interview experience
Difficulty level
Duration
based on 10 reviews
Rating in categories
Technical Account Manager
310
salaries
| ₹8.8 L/yr - ₹15.1 L/yr |
Senior Technical Account Manager
294
salaries
| ₹11 L/yr - ₹18.5 L/yr |
Key Account Manager
248
salaries
| ₹12.4 L/yr - ₹21.4 L/yr |
Area Sales Manager
113
salaries
| ₹20 L/yr - ₹34.7 L/yr |
Assistant Manager
64
salaries
| ₹8.7 L/yr - ₹16 L/yr |
John Deere
Cummins
ABB
CNH ( Case New Holland)