J. Kumar Infraprojects Project Manager Interview Questions and Answers

Updated 6 Aug 2025

5 Interview questions

A Project Manager was asked 1d ago
Q. What is the voltage range for HT cables?
Ans. 

HT cables are high-tension cables used for transmitting electricity at high voltages, typically above 1 kV.

  • HT cables are designed for high voltage applications, usually ranging from 1 kV to 33 kV.

  • Common types include XLPE (cross-linked polyethylene) and PVC (polyvinyl chloride) insulated cables.

  • HT cables are used in power distribution networks, industrial applications, and renewable energy systems.

  • Examples of HT c...

A Project Manager was asked 1d ago
Q. What are the different types of PVC conduit?
Ans. 

PVC conduits are durable, lightweight tubes used for electrical wiring and protection against environmental factors.

  • Types include Schedule 40 and Schedule 80, differing in thickness and pressure ratings.

  • Rigid PVC conduit is commonly used for underground installations.

  • Flexible PVC conduit allows for easier installation in tight spaces.

  • Examples include electrical raceways in residential and commercial buildings.

Project Manager Interview Questions Asked at Other Companies

Q1. Present a holistic view grounded in reality, not just textbook an ... read more
Q2. What is success & what is failure to you? How do you handle f ... read more
asked in HCLTech
Q3. How did you manage the software release and deployment?
asked in Infosys
Q4. What is the difference between a scrum master and a product manag ... read more
Q5. If you have 1 kg of cotton and 1 kg of iron, which is heavier?
A Project Manager was asked 1d ago
Q. What is the range of LT cables?
Ans. 

LT cable range refers to low tension cables used for electrical distribution in various applications.

  • LT cables typically range from 1.1 kV to 33 kV.

  • Common types include PVC insulated, XLPE insulated, and rubber insulated cables.

  • Used in residential, commercial, and industrial applications.

  • Examples include power distribution in buildings and street lighting.

A Project Manager was asked 1d ago
Q. What are the different types of transformer tests?
Ans. 

Testing of transformers involves various tests to ensure performance, safety, and reliability in electrical systems.

  • 1. Insulation Resistance Test: Measures the resistance of insulation to prevent electrical leakage.

  • 2. Transformer Turns Ratio (TTR) Test: Compares the ratio of primary to secondary windings to ensure correct voltage transformation.

  • 3. Power Factor Test: Assesses the power factor of the transformer to ...

A Project Manager was asked 1d ago
Q. What is the difference between HT and LT cables?
Ans. 

HT (High Tension) cables carry high voltage electricity, while LT (Low Tension) cables handle lower voltage levels.

  • HT cables typically operate at voltages above 1 kV, used for transmission over long distances.

  • LT cables operate at voltages below 1 kV, commonly used for distribution to homes and businesses.

  • Examples of HT cables include those used in power plants and substations.

  • Examples of LT cables include those us...

J. Kumar Infraprojects Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jul 2025, where I was asked the following questions.

  • Q1. What is type of pvc conduit?
  • Ans. 

    PVC conduits are durable, lightweight tubes used for electrical wiring and protection against environmental factors.

    • Types include Schedule 40 and Schedule 80, differing in thickness and pressure ratings.

    • Rigid PVC conduit is commonly used for underground installations.

    • Flexible PVC conduit allows for easier installation in tight spaces.

    • Examples include electrical raceways in residential and commercial buildings.

  • Answered by AI
  • Q2. What is no of testing oh tranformer?
  • Ans. 

    Testing of transformers involves various tests to ensure performance, safety, and reliability in electrical systems.

    • 1. Insulation Resistance Test: Measures the resistance of insulation to prevent electrical leakage.

    • 2. Transformer Turns Ratio (TTR) Test: Compares the ratio of primary to secondary windings to ensure correct voltage transformation.

    • 3. Power Factor Test: Assesses the power factor of the transformer to evalu...

  • Answered by AI
  • Q3. What is the difference of HTAnd LT cable?
  • Ans. 

    HT (High Tension) cables carry high voltage electricity, while LT (Low Tension) cables handle lower voltage levels.

    • HT cables typically operate at voltages above 1 kV, used for transmission over long distances.

    • LT cables operate at voltages below 1 kV, commonly used for distribution to homes and businesses.

    • Examples of HT cables include those used in power plants and substations.

    • Examples of LT cables include those used in...

  • Answered by AI
  • Q4. What is lt cable range?
  • Ans. 

    LT cable range refers to low tension cables used for electrical distribution in various applications.

    • LT cables typically range from 1.1 kV to 33 kV.

    • Common types include PVC insulated, XLPE insulated, and rubber insulated cables.

    • Used in residential, commercial, and industrial applications.

    • Examples include power distribution in buildings and street lighting.

  • Answered by AI
  • Q5. What is HT cable range?
  • Ans. 

    HT cables are high-tension cables used for transmitting electricity at high voltages, typically above 1 kV.

    • HT cables are designed for high voltage applications, usually ranging from 1 kV to 33 kV.

    • Common types include XLPE (cross-linked polyethylene) and PVC (polyvinyl chloride) insulated cables.

    • HT cables are used in power distribution networks, industrial applications, and renewable energy systems.

    • Examples of HT cable ...

  • Answered by AI

J. Kumar Infraprojects HR Interview Questions

8 questions and answers

Q. What is your role in the company?
Q. Why do you want to leave your previous company?
Q. Where do you stay?

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about J. Kumar Infraprojects?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Please tell me about yourself
  • Ans. I have 15 years experience in Highways Structure activities etc.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Assistant Manager interview:
  • Technical skill
Interview preparation tips for other job seekers - It was good experience in first time I faced lnt Sr. staff
Are these interview questions helpful?

I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. All about core knowledge in specified sector of my existing work experience.
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and other benefits.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep things short and simple, answer only what is asked precisely and to the point. Don't show over confidence. Prepare for core of your previous work related topics.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Can you work in rural place
  • Ans. 

    I am open to working in a rural location, as it offers unique opportunities for growth and community engagement.

    • Rural areas often have a close-knit community, allowing for stronger relationships with colleagues and clients.

    • Working in a rural location can provide unique challenges that enhance problem-solving skills, such as limited resources.

    • I appreciate the opportunity to contribute to underserved areas, making a posi...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't fear too much even the minimum guy can get through

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

J. Kumar Infraprojects Interview FAQs

What are the top questions asked in J. Kumar Infraprojects Project Manager interview?

Some of the top questions asked at the J. Kumar Infraprojects Project Manager interview -

  1. what is the difference of HTAnd LT cab...read more
  2. what is no of testing oh tranform...read more
  3. what is type of pvc condu...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
J. Kumar Infraprojects Project Manager Salary
based on 25 salaries
₹17.8 L/yr - ₹33.2 L/yr
34% more than the average Project Manager Salary in India
View more details

J. Kumar Infraprojects Project Manager Reviews and Ratings

based on 7 reviews

4.6/5

Rating in categories

4.4

Skill development

4.3

Work-life balance

4.7

Salary

4.5

Job security

4.3

Company culture

3.7

Promotions

3.6

Work satisfaction

Explore 7 Reviews and Ratings
Junior Engineer
181 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Civil Engineer
155 salaries
unlock blur

₹2.5 L/yr - ₹7.6 L/yr

Senior Engineer
149 salaries
unlock blur

₹4.8 L/yr - ₹11.2 L/yr

Civil Site Engineer
144 salaries
unlock blur

₹2.4 L/yr - ₹6.6 L/yr

Engineer
118 salaries
unlock blur

₹3.6 L/yr - ₹7.7 L/yr

Explore more salaries
Compare J. Kumar Infraprojects with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.2
Compare
write
Share an Interview