Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Interview Questions and Answers

Updated 30 Jun 2025
Popular Designations

202 Interview questions

A Project Manager was asked 1mo ago
Q. What is your plan to achieve targets with limited time and resources in solar project completion?
Ans. 

Efficient planning, resource allocation, and stakeholder engagement are key to completing solar projects on time and within budget.

  • Conduct a thorough project assessment to identify critical tasks and potential bottlenecks.

  • Utilize project management tools like Gantt charts to visualize timelines and resource allocation.

  • Engage stakeholders early to ensure alignment and support, reducing delays in decision-making.

  • Imp...

View all Project Manager interview questions
A Trainee was asked 1mo ago
Q. How do you think renewable energy will evolve in the era of artificial intelligence?
Ans. 

AI will enhance renewable energy through improved efficiency, predictive maintenance, and optimized resource management.

  • Predictive Analytics: AI can analyze data from renewable energy sources to predict energy production and optimize grid management.

  • Smart Grids: AI can facilitate the development of smart grids that dynamically balance supply and demand, integrating various renewable sources.

  • Energy Storage Optimiza...

View all Trainee interview questions
A Survey Officer was asked 2mo ago
Q. What are the fundamental theories associated with surveying?
Ans. 

Surveying is based on fundamental theories that ensure accurate measurement and representation of the Earth's surface.

  • Geometric Principles: Surveying relies on geometric concepts such as points, lines, and angles to determine locations and distances accurately.

  • Triangulation: This method uses the principles of triangles to measure distances indirectly, often used in large-scale surveys.

  • Coordinate Systems: Surveying...

View all Survey Officer interview questions
A Survey Officer was asked 2mo ago
Q. What is the role of a surveyor in the context of transmission line construction?
Ans. 

Surveyors play a crucial role in the planning and execution of transmission line construction, ensuring accuracy and compliance.

  • Site Assessment: Surveyors evaluate the proposed route for the transmission line, considering topography, land use, and environmental impact.

  • Boundary Identification: They establish property boundaries to avoid legal disputes and ensure the project stays within designated areas.

  • Elevation a...

View all Survey Officer interview questions
A Project Manager was asked 2mo ago
Q. What new ideas can you bring to our system?
Ans. 

I can enhance project efficiency through innovative strategies, improved communication, and data-driven decision-making.

  • Implement Agile methodologies to increase flexibility and responsiveness to changes, as seen in successful tech startups.

  • Introduce a project management tool like Trello or Asana to streamline task assignments and progress tracking.

  • Foster a culture of open communication through regular team check-...

View all Project Manager interview questions
A Survey Engineer was asked 2mo ago
Q. Do you know about contouring?
Ans. 

Contouring is the process of creating contour lines on a map to represent elevation changes in a landscape.

  • Contouring helps visualize terrain and landforms, aiding in planning and design.

  • It involves drawing lines that connect points of equal elevation, known as contour lines.

  • For example, in civil engineering, contour maps are used for site planning and drainage design.

  • Contour intervals represent the vertical dista...

View all Survey Engineer interview questions
A Planning Manager was asked 2mo ago
Q. What is the difference between MS Project and Primavera?
Ans. 

MS Project is user-friendly for small projects, while Primavera excels in complex project management with advanced features.

  • MS Project is generally easier to use for beginners, while Primavera has a steeper learning curve due to its advanced functionalities.

  • Primavera is better suited for large-scale projects, such as construction or engineering, where resource management is critical.

  • MS Project integrates well with...

View all Planning Manager interview questions
Are these interview questions helpful?
A Planning Manager was asked 2mo ago
Q. What is delay analysis and what is its importance?
Ans. 

Delay analysis assesses project delays to determine causes and impacts, crucial for effective project management.

  • Identifies the root causes of delays, such as resource shortages or unforeseen events.

  • Helps in quantifying the impact of delays on project timelines and costs.

  • Facilitates communication among stakeholders by providing clear evidence of delay causes.

  • Examples include using techniques like the Critical Path...

View all Planning Manager interview questions
A Senior Safety Engineer was asked 2mo ago
Q. Classify the fire extinguishers.
Ans. 

Fire extinguishers are classified based on the type of fire they are designed to combat, ensuring effective fire suppression.

  • Class A: For ordinary combustibles like wood, paper, and cloth.

  • Class B: For flammable liquids such as gasoline, oil, and grease.

  • Class C: For electrical fires involving live equipment.

  • Class D: For combustible metals like magnesium and sodium.

  • Class K: For cooking oils and fats, commonly found ...

View all Senior Safety Engineer interview questions
A Senior Safety Engineer was asked 2mo ago
Q. What is the full form of ISO?
Ans. 

ISO stands for International Organization for Standardization, which develops and publishes international standards.

  • Founded in 1947, ISO is an independent, non-governmental international organization.

  • ISO standards cover various fields, including quality management (ISO 9001) and environmental management (ISO 14001).

  • ISO standards help ensure safety, efficiency, and interoperability of products and services globally...

View all Senior Safety Engineer interview questions

KEC International Interview Experiences

354 interviews found

Store Officer Interview Questions & Answers

user image Anonymous

posted on 12 Mar 2022

I applied via Referral

Round 1 - One-on-one 

(4 Questions)

  • Q1. Which SAP T code used for mm ?
  • Q2. Which SAP movement type used for mm
  • Q3. Which Advance excel used for inventory..?
  • Q4. How much experienced in same Department..?
  • Ans. 

    I have over five years of experience in retail management, focusing on inventory control and customer service excellence.

    • Managed inventory for a store with over 10,000 SKUs, ensuring optimal stock levels.

    • Implemented a new inventory tracking system that reduced discrepancies by 30%.

    • Trained and supervised a team of 15 staff members, enhancing customer service ratings.

    • Conducted regular audits to maintain compliance with c...

  • Answered by AI
Round 2 - HR 

(4 Questions)

  • Q1. Tell me about yourself.
  • Q2. Where do you see yourself in 5 years?
  • Ans. 

    In five years, I envision myself as a Store Officer leading a team, optimizing operations, and enhancing customer satisfaction.

    • Leadership Role: I aim to take on a leadership position where I can mentor new employees and foster a positive team environment.

    • Operational Excellence: I plan to implement best practices that streamline store operations, reducing costs and improving efficiency.

    • Customer Engagement: I want to dev...

  • Answered by AI
  • Q3. Why are you looking for a change?
  • Q4. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive & honestly answered him

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Transmission Tower Detailing
  • Q2. Shop Drawing Bil of Meterial Tower Devlop & Re Devlop
  • Q3. Raice Chimney Drawing
  • Q4. Stub Template Prop Drawing
  • Q5. Structural Develop and Redevelop, Marking Erection Drawing , Bolts Nuts Grip Checking and Counting, Bill of Material , Shop Drawing Cad & Dxf and Shop Drawing Checking , Prop Drawing, Raise Chimney Transm...

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission Tower Detailing Shop Drawing Bill Of Meterial Tower Devlop & Re Devlop, RC, Prop
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024, where I was asked the following questions.

  • Q1. What is your notice period
  • Ans. 

    My notice period is typically two weeks, allowing for a smooth transition and handover of responsibilities.

    • Standard notice period in my current role is two weeks.

    • I believe this timeframe allows for proper handover and transition.

    • In my previous job, I was able to complete ongoing projects within my notice period.

    • I am open to negotiating the notice period if necessary.

  • Answered by AI
  • Q2. How many years of epc exp you have
  • Ans. 

    I have over 5 years of EPC experience, focusing on project management and execution in various sectors.

    • Managed multiple EPC projects, including a $10 million infrastructure project.

    • Led a team of engineers and technicians to ensure timely project delivery.

    • Implemented cost-saving measures that reduced project expenses by 15%.

    • Collaborated with cross-functional teams to enhance project efficiency.

  • Answered by AI

Interview Questions & Answers

user image Anonymous

posted on 30 Jun 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024, where I was asked the following questions.

  • Q1. Rolls and Responsibilities
  • Q2. Projects Completed
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-

I appeared for an interview in Jan 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Civil Engineer tag can be obtained from the company.
  • Ans. Yes, of course you can get the tag if are skilled at the work.
  • Answered Anonymously
  • Q2. Is there a way to go from Foreman to Engineer?
  • Ans. 

    Transitioning from Foreman to Engineer involves gaining education, experience, and skills in engineering principles and practices.

    • Pursue a degree in civil engineering or a related field to gain foundational knowledge.

    • Gain relevant work experience by collaborating with engineers on projects.

    • Obtain certifications such as PMP or LEED to enhance your qualifications.

    • Develop technical skills in software like AutoCAD or Revit...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - A good platform for your future.

Interview Questions & Answers

user image Anonymous

posted on 10 Dec 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Job specific/ roles and responsibilities
  • Q2. Legal requirements
Round 2 - HR 

(2 Questions)

  • Q1. Why you want to switch
  • Q2. Salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge of core safety requirements and it's implementation procedure
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(2 Questions)

  • Q1. Site work related like foundation
  • Q2. Eraction and stringing
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. PEB structure lifting schedule and process
  • Q2. Fabrication & erection
  • Q3. Lifting process
  • Q4. Before lifting of material prepare the erection plan
  • Q5. Pre TBT will be completed at site for safety related
  • Q6. TBT will be conducted with all representative staff and workers
  • Q7. Before lifting of material crane positioning should be checked
  • Q8. Then start the lifting of material
  • Q9. Before lifting of material all lifting tools and tackle should be checked
  • Q10. Material lifting should be slowly slowly lift and after that when material has been portioning and lock the material
  • Q11. After positioning of materials then released the crane and post TBT should be conducted at site and stop the work
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What is fatal prevention plan?
  • Q2. Hira & Risk matrix

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary on time but there is facilities. No work life balance, heavy politics, torture with new comer
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
No response

I appeared for an interview in Feb 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Ur best experience in line
  • Ans. 

    My best experience as a Wireman Technician involved troubleshooting complex electrical issues and successfully completing a major project.

    • Successfully diagnosed and repaired a faulty wiring system in a commercial building, improving safety and efficiency.

    • Led a team in installing a new electrical system for a large residential project, ensuring compliance with local codes.

    • Implemented preventive maintenance schedules tha...

  • Answered by AI
  • Q2. Why this works
  • Ans. 

    Understanding the principles behind electrical systems helps troubleshoot and maintain equipment effectively.

    • Electrical circuits operate on Ohm's Law, which states V=IR (Voltage = Current x Resistance).

    • Understanding AC vs. DC current is crucial; AC is used in homes, while DC is common in batteries.

    • Fuses and circuit breakers protect circuits from overloads by interrupting the flow of electricity.

    • Grounding is essential f...

  • Answered by AI

Sr. EHS Engineer Interview Questions & Answers

user image Arunabha Maity

posted on 12 Mar 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. How to handle site at your level
  • Ans. 

    Effective site handling involves proactive risk management, compliance, and fostering a safety culture among all stakeholders.

    • Conduct regular site assessments to identify potential hazards and implement corrective actions.

    • Engage with site personnel through training sessions to promote awareness of EHS protocols.

    • Establish clear communication channels for reporting incidents or unsafe conditions, ensuring timely response...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your expectations
  • Ans. 

    I expect a collaborative environment, opportunities for growth, and a commitment to safety and sustainability in EHS practices.

    • Collaboration: I look forward to working with cross-functional teams to enhance safety protocols, like conducting joint safety audits.

    • Professional Growth: I expect opportunities for continuous learning, such as attending EHS conferences or obtaining certifications.

    • Commitment to Safety: I hope t...

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about KEC International?
Ask anonymously on communities.

KEC International Interview FAQs

How many rounds are there in KEC International interview?
KEC International interview process usually has 2-3 rounds. The most common rounds in the KEC International interview process are Technical, Resume Shortlist and HR.
How to prepare for KEC International interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Project Management, Transmission Line, EHS, Substation and Auditing.
What are the top questions asked in KEC International interview?

Some of the top questions asked at the KEC International interview -

  1. 8. A critical deliverable which was to be delivered to the C-Suite is way behin...read more
  2. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide ...read more
  3. Which Advance excel used for inventory...read more
What are the most common questions asked in KEC International HR round?

The most common HR questions asked in KEC International interview are -

  1. Where do you see yourself in 5 yea...read more
  2. What are your strengths and weakness...read more
  3. Why are you looking for a chan...read more
How long is the KEC International interview process?

The duration of KEC International interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 415 interview experiences

Difficulty level

Easy 24%
Moderate 64%
Hard 13%

Duration

Less than 2 weeks 63%
2-4 weeks 24%
4-6 weeks 4%
6-8 weeks 3%
More than 8 weeks 6%
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 819 Interviews
Tata Projects Interview Questions
4.2
 • 496 Interviews
Dilip Buildcon Interview Questions
4.0
 • 156 Interviews
G R Infraprojects Interview Questions
4.1
 • 145 Interviews
AtkinsRealis Interview Questions
3.9
 • 92 Interviews
GMR Group Interview Questions
4.0
 • 91 Interviews
View all

KEC International Reviews and Ratings

based on 4.1k reviews

4.0/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 4.1k Reviews and Ratings
Manager EHS

Mumbai

15-18 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
690 salaries
unlock blur

₹7.9 L/yr - ₹16 L/yr

Senior Engineer
475 salaries
unlock blur

₹4.3 L/yr - ₹14 L/yr

Safety Officer
212 salaries
unlock blur

₹1.8 L/yr - ₹7.5 L/yr

Project Engineer
196 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Civil Engineer
194 salaries
unlock blur

₹2.2 L/yr - ₹9.5 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
write
Share an Interview