Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by RVDK Labourhome Private Limited Team. If you also belong to the team, you can get access from here

RVDK Labourhome Private Limited Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

RVDK Labourhome Private Limited Interview Questions and Answers

Updated 15 Jul 2025
Popular Designations

RVDK Labourhome Private Limited Interview Experiences

5 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Apna Jobs and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Interviewer was with Company CEO
  • Q2. Service gap, labour related questions, manpower handling, staffing types of questions asked, CEO was negative perception initially, but I had cracked it with the postive mindset and high confident level. E...
  • Q3. Asked me do you have bike ? What you were doing during your gap periods ? I said that I was doing my own small scale business. During Pandemic my business was totally went into loss. That's why I am keenl...
Round 2 - One-on-one 

(2 Questions)

  • Q1. 2nd round with the Company Director
  • Q2. About marketing strategy went through and asked about my role and responsibilities about my past employment.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and confidential level should be high. First try to get the point, what they are asking, then answer them accordingly. If you can satisfy them or their queries, then obviously you'll cracked it.

Intern Interview Questions & Answers

user image Anonymous

posted on 28 Jan 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Find the string is palidrome or not?

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 15 Jul 2025

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025, where I was asked the following questions.

  • Q1. Time pass question
  • Q2. Salary and work exp olny
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. My interview was with CEO first day first round. And 2nd day again with Director of the company. Final round
  • Q2. With full of confidence and energetic to face with those two Boss at the time of interview. Be positive and make them understand, and change their negative perception.
  • Q3. With new role i have assigned which is B2B marketing, focuss on industries, warehouse, manufacturing, export house, for their recruitment, Outsourcing and payroll management, administration and facility ma...
Round 3 - One-on-one 

(1 Question)

  • Q1. With Company Director
Round 4 - HR 

(1 Question)

  • Q1. Try to understand first what is their narrative, what they want. If you can solve their needs, then you have cracked it.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive, try to make them understand (interviewer)

I applied via Apna Jobs and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Interviewer was Company CEO and Director
  • Q2. Work related which was totally into my last profile
Round 2 - HR 

(2 Questions)

  • Q1. Was my previous role. And last salary
  • Q2. Last organization about complete Job description

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive always, make them understand for every queries.

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about RVDK Labourhome Private Limited?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Quantity surveying

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and good past experience is must
Be interview-ready. Browse the most asked HR questions.
illustration image

I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What Do You Understand by M25 Concrete?
  • Ans. According to IS 456 : 2000, M refers Mix and 25 refers the characteristic compressive.
  • Answered by MD ASGHAR ALAM

Interview Preparation Tips

Interview preparation tips for other job seekers - As a civil engineer we have must knowledge about IS codes.
Are these interview questions helpful?

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How we define daviation of line and spotting of towers, major statuary clerance and their proposal and clearance proposals
  • Ans. 

    Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.

    • Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.

    • Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.

    • Major statutory clearance refers to the minimum distance required between power lines an...

  • Answered by AI
  • Q2. Where is your strengths of transmission line construction activity and why?
  • Ans. 

    My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.

    • Experience in managing large-scale transmission line construction projects

    • Expertise in ensuring adherence to safety standards and regulations

    • Ability to coordinate with cross-functional teams and stakeholders

    • Strong problem-solving and decision-making skills

    • Familiarity w...

  • Answered by AI
  • Q3. Why are you left your current employer

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask what you, dont give incomplete answer

I applied via Referral and was interviewed before Feb 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Are you committed to be in project till project completion
  • Q2. Can you handel multi dimenssional assignment
  • Ans. 

    Yes, I have experience in handling multi-dimensional assignments.

    • I have previously managed a team with diverse skill sets and responsibilities.

    • I am comfortable with delegating tasks and ensuring timely completion.

    • I have a strong understanding of project management and resource allocation.

    • I am adept at prioritizing tasks and managing multiple projects simultaneously.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I advice individual need to share his technical and team building abilities

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As attendance for “Mid Management level designation “ Just asks about my Experience. Not much Technical points highlighted except few Manager level Questions (general points not much technically projected)...

Interview Preparation Tips

Topics to prepare for VIKRAN Engineering & Exim Assistant Manager interview:
  • Nothing required.
Interview preparation tips for other job seekers - Just expecting less salary and having Good experience in the relevant field you can have JOB CONFIRMED easily.

RVDK Labourhome Private Limited Interview FAQs

How many rounds are there in RVDK Labourhome Private Limited interview?
RVDK Labourhome Private Limited interview process usually has 3 rounds. The most common rounds in the RVDK Labourhome Private Limited interview process are One-on-one Round, Resume Shortlist and HR.
How to prepare for RVDK Labourhome Private Limited interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at RVDK Labourhome Private Limited. The most common topics and skills that interviewers at RVDK Labourhome Private Limited expect are Communication Skills, Labour Management, Construction, Salesforce and Civil Construction.
What are the top questions asked in RVDK Labourhome Private Limited interview?

Some of the top questions asked at the RVDK Labourhome Private Limited interview -

  1. Service gap, labour related questions, manpower handling, staffing types of que...read more
  2. find the string is palidrome or n...read more
  3. With new role i have assigned which is B2B marketing, focuss on industries, war...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.5/5

based on 4 interview experiences

Difficulty level

Easy 33%
Moderate 33%
Hard 33%

Duration

Less than 2 weeks 67%
6-8 weeks 33%
View more

Interview Questions from Similar Companies

R.V.R. PROJECTS Interview Questions
4.0
 • 46 Interviews
BuildAHome Interview Questions
4.2
 • 38 Interviews
Manomav Engineers Interview Questions
4.0
 • 29 Interviews
Gem Engserv Interview Questions
4.0
 • 27 Interviews
Construction Group Interview Questions
4.1
 • 25 Interviews
Bondada Engineering Interview Questions
3.7
 • 23 Interviews
ASC Infratech Interview Questions
4.0
 • 20 Interviews
View all

RVDK Labourhome Private Limited Reviews and Ratings

based on 23 reviews

3.8/5

Rating in categories

3.9

Skill development

3.6

Work-life balance

3.6

Salary

3.4

Job security

3.5

Company culture

3.2

Promotions

3.5

Work satisfaction

Explore 23 Reviews and Ratings
QA Tester - Product & Technology

New Delhi

3-5 Yrs

₹ 3.5-5.5 LPA

Executive Sales - Mumbai & Chennai

Mumbai,

Chennai

3-6 Yrs

₹ 3-4.8 LPA

Electrical Testing Engineer - Saudi Arabia

Saudi arabia

5-7 Yrs

₹ 15-17 LPA

Explore more jobs
Civil Foreman
6 salaries
unlock blur

₹3.2 L/yr - ₹5.6 L/yr

Operations Manager
4 salaries
unlock blur

₹6 L/yr - ₹9.6 L/yr

Backend Developer
3 salaries
unlock blur

₹7 L/yr - ₹7.2 L/yr

Senior Executive Operations
3 salaries
unlock blur

₹4 L/yr - ₹5.1 L/yr

Front end Developer
3 salaries
unlock blur

₹5 L/yr - ₹7.2 L/yr

Explore more salaries
Compare RVDK Labourhome Private Limited with

Lea Associates South Asia

4.2
Compare

R.V.R. PROJECTS

4.0
Compare

McNally Bharat Engineering

4.0
Compare

ABCI Infrastructures

3.4
Compare
write
Share an Interview