I applied via Approached by Company and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
I am currently working as a Billing Engineer in my present company.
Preparing and submitting invoices to clients
Reviewing project contracts and ensuring accurate billing
Tracking project costs and expenses
Collaborating with project managers and accountants
Resolving billing discrepancies
Plaster measurement deduction criteria refers to the standard guidelines used to calculate the deduction for plastering work in construction projects.
Deductions are made for openings such as doors, windows, and ducts in the plastered area.
The deduction criteria may vary based on the type of plastering material used and the specifications of the project.
Common deduction percentages range from 5% to 10% for openings in p...
The excess quantity executed beyond the BOQ quantity needs to be documented and approved by the client before billing.
Document the excess quantity separately from the original BOQ quantity
Seek approval from the client for the excess quantity before including it in the billing
Adjust the billing amount accordingly based on the approved excess quantity
Maintain clear communication with the client regarding the excess quant...
Top trending discussions
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I appeared for an interview before May 2024, where I was asked the following questions.
Mode of measurement refers to the method used to quantify or assess a particular variable or parameter in engineering.
Direct Measurement: Using instruments like rulers or calipers to measure length.
Indirect Measurement: Calculating values based on other known measurements, such as using the Pythagorean theorem.
Continuous Measurement: Monitoring variables like temperature or pressure over time with sensors.
Discrete Meas...
I applied via Referral and was interviewed before Feb 2020. There were 3 interview rounds.
Yes, I have experience in handling multi-dimensional assignments.
I have previously managed a team with diverse skill sets and responsibilities.
I am comfortable with delegating tasks and ensuring timely completion.
I have a strong understanding of project management and resource allocation.
I am adept at prioritizing tasks and managing multiple projects simultaneously.
posted on 24 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 12 Oct 2021
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 29 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
posted on 10 Jun 2025
I appeared for an interview in May 2025, where I was asked the following questions.
I have extensive experience in rural electrification projects, focusing on sustainable energy solutions and community engagement.
Led a project in rural India that provided solar power to over 500 households, improving quality of life and local businesses.
Collaborated with local governments and NGOs to identify areas in need of electrification, ensuring community needs were met.
Implemented training programs for local te...
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
The duration of Som Projects (S.P.L) interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 1 interview experience
Difficulty level
Duration
based on 140 reviews
Rating in categories
Kanyakumari
15-22 Yrs
Not Disclosed
Civil Site Engineer
38
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Site Engineer
16
salaries
| ₹3.2 L/yr - ₹5.5 L/yr |
Accountant
15
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Civil Foreman
14
salaries
| ₹2.8 L/yr - ₹4.2 L/yr |
Civil Engineer
14
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim