Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Zetwerk Team. If you also belong to the team, you can get access from here

Zetwerk Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Zetwerk Interview Questions and Answers

Updated 13 Aug 2025
Popular Designations

79 Interview questions

A Program Manager was asked 3w ago
Q. How does logistics work?
Ans. 

Logistics involves planning, executing, and managing the flow of goods and services from origin to consumption.

  • Logistics includes transportation, warehousing, and inventory management.

  • For example, a company may use trucks to deliver products to retail stores.

  • Supply chain management is a key aspect, coordinating suppliers and distributors.

  • Technology plays a vital role, with software for tracking shipments and manag...

View all Program Manager interview questions
A Senior Executive Engineer was asked 1mo ago
Q. How can piping fronts be generated for erection?
Ans. 

Piping fronts for erection can be generated through planning, design, and coordination of construction activities.

  • 1. Detailed Design: Create comprehensive piping designs using CAD software to visualize the layout.

  • 2. Material Procurement: Ensure all necessary materials are ordered and available on-site before erection begins.

  • 3. Construction Sequencing: Develop a logical sequence for installation to optimize workflo...

View all Senior Executive Engineer interview questions
A Senior Executive Engineer was asked 1mo ago
Q. What is your understanding of welding consumption reports, and how do you maintain them?
Ans. 

Welding consumption reports track materials used in welding processes, ensuring efficiency and cost management.

  • Welding consumption reports detail the amount of welding materials used, such as electrodes and filler metals.

  • These reports help in budgeting and forecasting for future projects by analyzing past consumption patterns.

  • For example, if a project used 500 kg of filler metal, this data can inform future projec...

View all Senior Executive Engineer interview questions
A Senior Executive Engineer was asked 1mo ago
Q. What is the daily progress tracking process for a welder?
Ans. 

Daily progress tracking for welders involves monitoring tasks, quality, and productivity to ensure project timelines are met.

  • Daily task logs: Welders should maintain a log of tasks completed each day, including types of welds and materials used.

  • Quality checks: Implement regular inspections to ensure welds meet specified standards, documenting any defects.

  • Time tracking: Use time sheets to record hours spent on each...

View all Senior Executive Engineer interview questions
An Assistant Manager was asked 4mo ago
Q. What is a Bar Bending Schedule?
Ans. 

A Bar Bending Schedule (BBS) is a detailed list of reinforcement bars used in construction projects.

  • BBS outlines the type, size, and quantity of rebar required for a project.

  • It includes details like bar lengths, shapes, and bending angles.

  • For example, a BBS might specify 10mm diameter bars, 12m long, bent at 90 degrees.

  • BBS helps in accurate estimation of materials and costs.

  • It ensures proper placement and alignmen...

View all Assistant Manager interview questions
An Assistant Manager was asked 4mo ago
Q. What is the critical path in project management?
Ans. 

The critical path is the longest sequence of dependent tasks that determines the shortest project duration.

  • Identifies tasks that directly impact project completion time.

  • If any task on the critical path is delayed, the entire project is delayed.

  • Example: In a construction project, pouring concrete and framing walls may be on the critical path.

  • Helps project managers prioritize resources and focus on key tasks.

  • Can cha...

View all Assistant Manager interview questions

Zetwerk HR Interview Questions

21 questions and answers

Q. What can you tell me about your background as an Electrical Engineer?
Q. How much experience do you have?
Q. What skills do you have?
An Assistant Manager was asked 4mo ago
Q. What is the concept of planning?
Ans. 

Planning is the process of setting objectives and determining a course of action to achieve them effectively and efficiently.

  • Involves defining goals: For example, a company may set a goal to increase sales by 20% in the next quarter.

  • Requires resource allocation: A project manager must allocate budget and personnel to ensure project completion.

  • Involves risk assessment: A business might analyze market trends to miti...

View all Assistant Manager interview questions
Are these interview questions helpful?
A Manager Civil was asked 4mo ago
Q. What strategies can be employed for effective management?
Ans. 

Effective management in civil engineering involves strategic planning, communication, and resource optimization.

  • Set clear goals: Define specific, measurable objectives for projects to ensure all team members are aligned.

  • Foster open communication: Encourage feedback and discussions among team members to enhance collaboration and problem-solving.

  • Utilize project management tools: Implement software like MS Project or...

View all Manager Civil interview questions
A Junior Engineer Civil was asked 5mo ago
Q. How much steel is required for a one-meter span with 100 c/c spacing?
Ans. 

Calculating steel requirement for a 1m span with 100 c/c spacing involves understanding reinforcement needs.

  • Determine the type of structure (beam, slab, etc.) to assess steel requirements.

  • For beams, typically use 0.5% to 1% of the cross-sectional area for steel reinforcement.

  • Example: For a beam with a cross-section of 300mm x 600mm, the area is 0.18 m². Steel required = 0.5% of 0.18 = 0.0009 m².

  • Spacing of 100 c/c ...

View all Junior Engineer Civil interview questions
A Junior Engineer Civil was asked 5mo ago
Q. How much steel is required for a 50KL x 12.0Mtr OHT?
Ans. 

Calculating the amount of steel required for a 50KL water tank with a height of 12.0 meters involves structural design considerations.

  • Volume Calculation: The volume of the tank is 50KL, which is equivalent to 50 cubic meters.

  • Steel Requirement: The amount of steel depends on the design, but a rough estimate can be made based on the tank's dimensions and structural requirements.

  • Reinforcement: Typically, for water ta...

View all Junior Engineer Civil interview questions

Zetwerk Interview Experiences

107 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Role of my job in previous company
  • Q2. Fully described what I performed there.
  • Q3. Client and sub contractor billing process
  • Q4. Elaborate From end to end billing procedure. Re consolation of materials and analysis of vendor work order
  • Ans. 

    The end-to-end billing procedure involves reconciliation of materials and analysis of vendor work orders.

    • Gather all relevant information for billing, including materials used and vendor work orders.

    • Verify the accuracy of the materials used and work performed against the vendor work orders.

    • Calculate the total cost of materials and work performed for billing purposes.

    • Generate an invoice based on the reconciled materials ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. A also known as a Line Leader or Production Team Leader, is responsible for overseeing and coordinating the activities of a production team to ensure efficient operations and meet production goals.
  • Q2. Team Leadership: Directing, motivating, and supervising production team members to ensure they are performing their duties effectively and meeting production targets.
  • Q3. Quality Control: Ensuring that products meet required quality standards and implementing quality control procedures to identify and correct any defects or issues.
  • Q4. Safety Compliance: Adhering to and enforcing safety regulations and procedures to ensure the safety of all team members and the producti
  • Q5. Inventory Management: Monitoring inventory levels, ensuring that materials are available when needed, and managing any issues with inventory or raw materials.
  • Q6. Problem Solving: Identifying and resolving any issues or problems that may arise on the production line, such as equipment malfunctions or production delays.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How much steel will be required in one meter (length × width) span whose specification is 100 c/c
  • Ans. 

    Calculating steel requirement for a 1m span with 100 c/c spacing involves understanding reinforcement needs.

    • Determine the type of structure (beam, slab, etc.) to assess steel requirements.

    • For beams, typically use 0.5% to 1% of the cross-sectional area for steel reinforcement.

    • Example: For a beam with a cross-section of 300mm x 600mm, the area is 0.18 m². Steel required = 0.5% of 0.18 = 0.0009 m².

    • Spacing of 100 c/c means...

  • Answered by AI
  • Q2. 50KL×12.0Mtr Oht How much steel will it
  • Ans. 

    Calculating the amount of steel required for a 50KL water tank with a height of 12.0 meters involves structural design considerations.

    • Volume Calculation: The volume of the tank is 50KL, which is equivalent to 50 cubic meters.

    • Steel Requirement: The amount of steel depends on the design, but a rough estimate can be made based on the tank's dimensions and structural requirements.

    • Reinforcement: Typically, for water tanks, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir asked how did you find out about Zetwork company Do anyone know you? I told you sir I don't know anyone in this company.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Experience related to my job
  • Q2. Present company
  • Ans. 

    I currently work at XYZ Corporation, focusing on quality assurance and control in manufacturing processes.

    • Oversee inspection processes to ensure compliance with industry standards.

    • Implement quality control measures that reduced defects by 20%.

    • Conduct regular audits and training sessions for staff on quality protocols.

    • Collaborate with engineering teams to improve product designs based on quality feedback.

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Codes ASME sec 9 ASME B31. 3
  • Ans. 

    ASME sec 9 and ASME B31.3 are codes related to welding and piping standards in the industry.

    • ASME sec 9 is the Boiler and Pressure Vessel Code which covers welding and brazing qualifications.

    • ASME B31.3 is the Process Piping Code which covers design, construction, and inspection of process piping systems.

    • Both codes are widely used in the industry to ensure quality and safety in welding and piping processes.

  • Answered by AI
  • Q2. Standard
Round 3 - One-on-one 

(2 Questions)

  • Q1. NDT LEVEL 2, RT UT MPT DPT
  • Q2. Site experience
  • Ans. 

    Extensive site experience in QA/QC, ensuring compliance with standards and effective communication with teams.

    • Conducted regular inspections to ensure adherence to project specifications and quality standards.

    • Collaborated with construction teams to identify and resolve quality issues promptly.

    • Implemented quality control procedures that reduced defects by 20% on a major project.

    • Trained junior inspectors on best practices...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clint was bedsheet after all interview completed he told me that he is looking for CSwip certified engineer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the procedure for bolt torque in steel bridges.
  • Ans. 

    Bolt torque procedure in steel bridges involves specific torque values, sequence, and verification steps.

    • Use torque wrench to tighten bolts to specified torque values.

    • Follow specific sequence for tightening bolts to ensure even distribution of load.

    • Verify torque values using calibrated tools to ensure proper tension.

    • Consider factors like bolt size, material, and surface condition when determining torque values.

    • Regularl...

  • Answered by AI
  • Q2. How do you check camber in Steel bridge
  • Ans. 

    Camber in steel bridges is checked using a straight edge and a measuring device.

    • Use a straight edge to measure the deviation from a straight line along the length of the bridge.

    • Measure the camber at multiple points along the bridge to ensure consistency.

    • Use a measuring device such as a level or laser to accurately determine the camber.

    • Compare the measured camber to the specified design requirements for the bridge.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Zetwerk is very good company and if anyone gets an offer from Zetwerk then you can join without thinking about anything
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jul 2025, where I was asked the following questions.

  • Q1. What is the IS code for materials?
  • Q2. What is material density?
  • Q3. Oht and pump house read for drawing
  • Q4. All pipe line direction
  • Q5. All meterial analisis

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company netural
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Instahyre and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Coding Test 

Easy to medium questions, Questions on DSA and Node.js.

Round 2 - Technical 

(2 Questions)

  • Q1. Valid parenthesis
  • Q2. Three sum problem
  • Ans. 

    The three sum problem involves finding unique triplets in an array that sum to zero.

    • Sort the array to simplify finding triplets.

    • Use a loop to fix one element and apply two-pointer technique for the rest.

    • Skip duplicates to ensure unique triplets.

    • Example: For array [-1, 0, 1, 2, -1, -4], the triplets are [-1, -1, 2], [-1, 0, 1].

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Zetwerk Software Developer interview:
  • js
  • node.js
  • dsa

Interview Questions & Answers

user image Anonymous

posted on 27 Jul 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Jun 2025, where I was asked the following questions.

  • Q1. Mechanical work,Pipe laying and hydro testing .
  • Q2. WTP operating scada system

Interview Preparation Tips

Interview preparation tips for other job seekers - My suggestion is that there should always be a good harmony (friendly behavior) between the company and the employees so that there is no problem in work and the company also grows.

Store Officer Interview Questions & Answers

user image Anonymous

posted on 17 Jul 2025

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jun 2025, where I was asked the following questions.

  • Q1. How can mentioned the store
  • Q2. Re-contiliation
  • Q3. Physical stock,
  • Q4. Good receipt report
  • Q5. Monitoring the store staff
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. What are the differences between White box testing and Black box testing?
  • Ans. 

    White box testing is based on the internal logic of the software being tested, while black box testing focuses on the functionality of the software.

    • White box testing is also known as clear box testing or glass box testing.

    • Black box testing is also known as functional testing.

    • White box testing is done by developers to ensure code coverage and identify logical errors.

    • Black box testing is done by testers to validate the f...

  • Answered by AI
  • Q2. What are the differences between validation and verification?
  • Ans. 

    Validation ensures the right product is being built, while verification ensures the product is being built right.

    • Validation confirms that the product meets the customer's requirements and needs.

    • Verification ensures that the product conforms to the specified requirements and standards.

    • Validation is about checking if the right product is being built, while verification is about checking if the product is being built corr...

  • Answered by AI
  • Q3. How do you write test cases for Login page and Payment gateway?
  • Ans. 

    Test cases for Login page and Payment gateway are written by identifying various scenarios, inputs, and expected outcomes.

    • Identify positive test cases for successful login and payment transactions.

    • Identify negative test cases for invalid credentials, error messages, and failed transactions.

    • Include boundary test cases for maximum and minimum input values.

    • Test for different user roles and permissions.

    • Verify the security ...

  • Answered by AI
  • Q4. How do you automate filtering and validate it's been filtered as desired?
  • Ans. 

    Automate filtering by using scripting languages like Python or tools like Selenium. Validate by comparing expected and actual results.

    • Use scripting languages like Python to automate filtering process.

    • Utilize tools like Selenium for automated testing of filtering functionality.

    • Validate filtering by comparing expected results with actual results.

    • Implement test cases to ensure filtering is working as desired.

  • Answered by AI
  • Q5. What is backend and how does it work?
  • Ans. 

    Backend refers to the server-side of an application where data processing and storage occurs.

    • Backend is responsible for handling data processing, storage, and retrieval.

    • It interacts with the frontend to deliver the final product to the user.

    • Common backend technologies include databases like MySQL, programming languages like Java or Python, and frameworks like Node.js.

    • Backend code runs on the server and responds to requ...

  • Answered by AI
  • Q6. For testers what is the use of Git and Jenkin?
  • Ans. 

    Git and Jenkins are essential tools for testers to manage code versions and automate testing processes.

    • Git is used for version control, allowing testers to track changes in code and collaborate with team members.

    • Jenkins is used for continuous integration and continuous delivery (CI/CD), automating the testing process and providing feedback on code quality.

    • Testers can use Git to create branches for different features or...

  • Answered by AI
  • Q7. Give me a simple example of API.
  • Ans. 

    An example of API is a weather API that provides real-time weather data to a mobile app.

    • API stands for Application Programming Interface

    • It allows different software applications to communicate with each other

    • Examples include Google Maps API, Twitter API, and Spotify API

  • Answered by AI
  • Q8. What are the difference between Smoke and Sanity?
  • Ans. 

    Smoke testing is a preliminary test to check if the software build is stable, while sanity testing is a subset of regression testing to ensure that specific functionalities are working correctly.

    • Smoke testing is done to check if the software build is stable enough for further testing, while sanity testing is done to check specific functionalities after changes.

    • Smoke testing is a shallow and wide approach, covering all ...

  • Answered by AI
  • Q9. Scenario : You have 100 data sets for a field . how do you validate it
  • Ans. 

    To validate 100 data sets for a field, use statistical analysis, data visualization, and comparison with known standards.

    • Perform statistical analysis on the data sets to identify outliers and inconsistencies

    • Use data visualization techniques such as histograms, box plots, and scatter plots to visually inspect the data

    • Compare the data sets with known standards or benchmarks to ensure accuracy and consistency

    • Utilize autom...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Zetwerk Junior Engineer - Quality Assurance interview:
  • Manual testing
  • Java
  • SQL
  • API Testing
Interview preparation tips for other job seekers - It's essential to freshers to have some hands on experiences on the manual testing and database setting.

Skills evaluated in this interview

Site Engineer Interview Questions & Answers

user image BUNNY VELPUGONDA

posted on 23 Jul 2025

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in Jun 2025, where I was asked the following questions.

  • Q1. About buildings
  • Q2. Comercial buildings g+2
  • Q3. Quantity estimation
  • Q4. Drawing study .

Interview Preparation Tips

Interview preparation tips for other job seekers - .

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Zetwerk?
Ask anonymously on communities.

Zetwerk Interview FAQs

How many rounds are there in Zetwerk interview?
Zetwerk interview process usually has 2-3 rounds. The most common rounds in the Zetwerk interview process are Technical, HR and Resume Shortlist.
How to prepare for Zetwerk interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Zetwerk. The most common topics and skills that interviewers at Zetwerk expect are Fabrication, Aerospace, Logistics, Injection Moulding and Supply Chain.
What are the top questions asked in Zetwerk interview?

Some of the top questions asked at the Zetwerk interview -

  1. Do you understand the engineering drawings, Preparing of BBS,Quantity Estimat...read more
  2. How do you automate filtering and validate it's been filtered as desir...read more
  3. What are the differences between White box testing and Black box testi...read more
What are the most common questions asked in Zetwerk HR round?

The most common HR questions asked in Zetwerk interview are -

  1. What are your salary expectatio...read more
  2. What are your strengths and weakness...read more
  3. Share details of your previous j...read more
How long is the Zetwerk interview process?

The duration of Zetwerk interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.2/5

based on 135 interview experiences

Difficulty level

Easy 25%
Moderate 67%
Hard 8%

Duration

Less than 2 weeks 72%
2-4 weeks 23%
4-6 weeks 4%
More than 8 weeks 1%
View more

Interview Questions from Similar Companies

Swiggy Interview Questions
3.7
 • 486 Interviews
XpressBees Interview Questions
4.2
 • 384 Interviews
Meesho Interview Questions
3.7
 • 379 Interviews
CARS24 Interview Questions
3.5
 • 372 Interviews
Udaan Interview Questions
4.0
 • 360 Interviews
Zepto Interview Questions
3.6
 • 334 Interviews
BlackBuck Interview Questions
3.7
 • 197 Interviews
Tata 1mg Interview Questions
3.6
 • 191 Interviews
Digit Insurance Interview Questions
3.8
 • 176 Interviews
Paisabazaar.com Interview Questions
3.4
 • 157 Interviews
View all

Zetwerk Reviews and Ratings

based on 976 reviews

4.0/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

4.1

Salary

3.4

Job security

3.9

Company culture

3.4

Promotions

3.7

Work satisfaction

Explore 976 Reviews and Ratings
Smt Engineer - Line Leader

Noida

3-8 Yrs

Not Disclosed

Accounts Executive

Chennai

1-3 Yrs

₹ 4-5 LPA

Explore more jobs
Assistant Manager
101 salaries
unlock blur

₹8.2 L/yr - ₹14.8 L/yr

Project Manager
89 salaries
unlock blur

₹11.7 L/yr - ₹21 L/yr

Site Engineer
89 salaries
unlock blur

₹2.2 L/yr - ₹6.9 L/yr

Senior Engineer
75 salaries
unlock blur

₹4.1 L/yr - ₹9 L/yr

Quality Engineer
74 salaries
unlock blur

₹2.1 L/yr - ₹6 L/yr

Explore more salaries
Compare Zetwerk with

Udaan

4.0
Compare

Swiggy

3.7
Compare

CARS24

3.5
Compare

XpressBees

4.2
Compare
write
Share an Interview