Voltage drop is the reduction in voltage that occurs as electricity flows through a circuit due to resistance.
Calculate the total resistance of the circuit
Determine the current flowing through the circuit
Multiply the current by the total resistance to get the voltage drop
Use Ohm's Law (V=IR) to calculate voltage drop across individual components
Consider using voltage drop calculators or tables for more complex cir...
Choose cable based on voltage, current, temperature, environment and application.
Determine voltage and current requirements
Consider temperature range and environmental conditions
Choose cable type based on application (e.g. power, data, signal)
Select appropriate conductor material (e.g. copper, aluminum)
Check for any regulatory requirements or standards (e.g. NEC, UL)
Examples: THHN for indoor power, Cat6 for data t...
Starters are used to control the starting current of motors.
Starters are used to limit the inrush current during motor starting.
They protect the motor from damage due to high starting current.
Types of starters include direct-on-line, star-delta, and soft starters.
Starters are commonly used in industrial and commercial applications.
Examples of applications include pumps, fans, and conveyor belts.
I'm sorry, I don't have the available data to answer this question.
I have executed multiple projects in the last few years.
Developed a new website for a client using HTML, CSS, and JavaScript.
Created a mobile application for a startup using React Native.
Managed a team of developers to build a custom CRM system for a large corporation.
Implemented a data analytics solution for a healthcare organization using Python and SQL.
Designed and executed a social media marketing campaign for...
I tend to get too focused on details and may overlook the bigger picture.
I have a tendency to get bogged down in technical details and may need to remind myself to step back and look at the overall project goals.
I sometimes struggle with presenting technical information in a way that is easily understandable to non-technical stakeholders.
I am always working to improve my knowledge and skills in areas where I may b...
Yes, shutter vibrator is relevant for a circular pier.
Shutter vibrator is used to compact concrete and remove air voids.
Circular piers also require proper compaction of concrete.
Shutter vibrator helps in achieving uniform and dense concrete in circular piers.
It ensures better strength and durability of the pier.
Example: In the construction of a circular bridge pier, a shutter vibrator would be used to ensure prope...
Permission to fix barricade boards can be obtained from the local government or relevant authorities.
Permission can be obtained from the local municipality or city council.
In some cases, permission may need to be sought from the transportation department or highway authority.
The process of obtaining permission may involve submitting an application, providing details of the location and purpose of the barricade boa...
The depth of socketing required in a pile depends on various factors such as soil conditions, load requirements, and design standards.
Socketing depth is determined based on the type and strength of the soil.
It is also influenced by the load-bearing capacity required for the structure.
Design standards and codes provide guidelines for determining the socketing depth.
For example, in cohesive soils, socketing depth ma...
The minimum distance between piles to permit the bore successively depends on various factors such as soil conditions, pile diameter, and construction method.
The minimum distance between piles should be determined based on the soil conditions. If the soil is weak or loose, a larger distance between piles may be required to ensure stability.
The diameter of the piles also plays a role in determining the minimum dist...
I appeared for an interview in Dec 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Oct 2024.ย There were 2 interview rounds.
Regarding RDSS Projects
I appeared for an interview in Mar 2025, where I was asked the following questions.
Cable tray laying involves planning, installation, and securing cable trays for efficient cable management in electrical systems.
Assess the layout: Determine the optimal route for cable trays considering building structure and electrical load requirements.
Select appropriate materials: Use materials like aluminum or steel based on environmental conditions and load capacity.
Ensure proper support: Install trays with adequ...
Cables require proper termination and laying techniques for effective electrical performance and safety.
Types of cable terminations include crimping, soldering, and using connectors.
Cable laying methods include direct burial, conduit installation, and aerial installation.
For example, underground cables are often terminated with heat-shrinkable sleeves.
Aerial cables are typically laid using support structures like poles...
Load calculation is crucial for ensuring electrical systems can handle demand without failure.
Load calculation determines the total electrical demand of a system.
It considers various factors like lighting, HVAC, and equipment loads.
Example: In a residential building, lighting load might be calculated based on wattage per square foot.
Commercial buildings may require demand factors for peak load scenarios.
Accurate load c...
I have knowledge in the field of mechanical engineering.
Mechanical engineering principles and concepts
Design and analysis of mechanical systems
Thermodynamics and fluid mechanics
I am not comfortable disclosing my past salary from my previous company.
It is not appropriate to discuss past salary during an interview
Focus on the value I can bring to this new role
Salary expectations should be based on the current market and the responsibilities of the new position
I worked at my past company for 3 years.
Worked at past company for 3 years
Started in entry-level position and was promoted twice
Received Employee of the Year award in second year
I expect a competitive salary that reflects my skills, experience, and the market rate for this position.
Research the average salary range for Engineer 1 positions in the industry and location
Consider your own qualifications, experience, and the value you bring to the company
Be prepared to negotiate based on the company's offer and benefits package
I appeared for an interview in Apr 2025, where I was asked the following questions.
I appeared for an interview in Jan 2025.
Written performance about the overall questions in time management.
How you would approach to solve a problem.
Top trending discussions
The duration of AECOM interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 101 interview experiences
Difficulty level
Duration
based on 1.7k reviews
Rating in categories
Gurgaon / Gurugram,
Bangalore / Bengaluru
+118-28 Yrs
Not Disclosed
Project Engineer
259
salaries
| โน5.5 L/yr - โน20 L/yr |
Senior Engineer
195
salaries
| โน8.2 L/yr - โน30 L/yr |
L2 Engineer
155
salaries
| โน3.4 L/yr - โน10.1 L/yr |
Engineer
132
salaries
| โน4 L/yr - โน14.5 L/yr |
Associate
116
salaries
| โน14 L/yr - โน45 L/yr |
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain
AtkinsRealis