Cable tray laying involves planning, installation, and securing cable trays for efficient cable management in electrical systems.
Assess the layout: Determine the optimal route for cable trays considering building structure and electrical load requirements.
Select appropriate materials: Use materials like aluminum or steel based on environmental conditions and load capacity.
Ensure proper support: Install trays with ...
I have experience working with minor irrigation systems, including design, installation, and maintenance.
Designed irrigation systems for small-scale agricultural projects
Installed drip irrigation systems for gardens and landscaping
Performed routine maintenance on irrigation pumps and pipes
Troubleshooted and repaired irrigation system malfunctions
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, ...
Bearings are structural components used to support and facilitate movement between two structural elements.
Types include roller bearings, ball bearings, plain bearings, and fluid bearings.
Roller bearings use cylindrical rollers to support heavy loads.
Ball bearings use balls to reduce friction between two surfaces.
Plain bearings have a sliding surface with no rolling elements.
Fluid bearings use a thin layer of liqu...
IEC codes and standards are international standards for electrical engineering.
IEC stands for International Electrotechnical Commission
IEC codes and standards ensure safety, reliability, and compatibility of electrical systems and equipment
Examples of IEC standards include IEC 60601 for medical electrical equipment and IEC 61850 for communication networks and systems in substations
Tolerance limits in various structure members, specifically piles.
Tolerance limits in pile diameter can range from +/- 5mm to +/- 25mm depending on the design specifications.
Tolerance limits in pile length can range from +/- 100mm to +/- 300mm depending on the design specifications.
Tolerance limits in pile verticality can range from +/- 1% to +/- 5% depending on the design specifications.
Tolerance limits in pile a...
HVDC is a technology used to transmit high voltage DC power over long distances. Offshore connections refer to power transmission from offshore wind farms.
HVDC is more efficient than AC transmission over long distances
Offshore connections require specialized equipment and installation techniques
HVDC is used for offshore connections to transmit power from offshore wind farms to the mainland
Examples of HVDC projects...
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
Market research approach involves gathering and analyzing data to understand the target market and competition.
Identify research objectives and questions
Determine research methodology (qualitative or quantitative)
Collect data through surveys, interviews, focus groups, etc.
Analyze data to draw insights and conclusions
Use findings to inform business decisions and strategies
I appeared for an interview in Dec 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Oct 2024.ย There were 2 interview rounds.
Regarding RDSS Projects
I appeared for an interview in Mar 2025, where I was asked the following questions.
Cable tray laying involves planning, installation, and securing cable trays for efficient cable management in electrical systems.
Assess the layout: Determine the optimal route for cable trays considering building structure and electrical load requirements.
Select appropriate materials: Use materials like aluminum or steel based on environmental conditions and load capacity.
Ensure proper support: Install trays with adequ...
Cables require proper termination and laying techniques for effective electrical performance and safety.
Types of cable terminations include crimping, soldering, and using connectors.
Cable laying methods include direct burial, conduit installation, and aerial installation.
For example, underground cables are often terminated with heat-shrinkable sleeves.
Aerial cables are typically laid using support structures like poles...
Load calculation is crucial for ensuring electrical systems can handle demand without failure.
Load calculation determines the total electrical demand of a system.
It considers various factors like lighting, HVAC, and equipment loads.
Example: In a residential building, lighting load might be calculated based on wattage per square foot.
Commercial buildings may require demand factors for peak load scenarios.
Accurate load c...
I have knowledge in the field of mechanical engineering.
Mechanical engineering principles and concepts
Design and analysis of mechanical systems
Thermodynamics and fluid mechanics
I am not comfortable disclosing my past salary from my previous company.
It is not appropriate to discuss past salary during an interview
Focus on the value I can bring to this new role
Salary expectations should be based on the current market and the responsibilities of the new position
I worked at my past company for 3 years.
Worked at past company for 3 years
Started in entry-level position and was promoted twice
Received Employee of the Year award in second year
I expect a competitive salary that reflects my skills, experience, and the market rate for this position.
Research the average salary range for Engineer 1 positions in the industry and location
Consider your own qualifications, experience, and the value you bring to the company
Be prepared to negotiate based on the company's offer and benefits package
I appeared for an interview in Apr 2025, where I was asked the following questions.
I appeared for an interview in Jan 2025.
Written performance about the overall questions in time management.
How you would approach to solve a problem.
Top trending discussions
The duration of AECOM interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 101 interview experiences
Difficulty level
Duration
based on 1.7k reviews
Rating in categories
Gurgaon / Gurugram,
Bangalore / Bengaluru
+118-28 Yrs
Not Disclosed
Project Engineer
259
salaries
| โน5.5 L/yr - โน20 L/yr |
Senior Engineer
195
salaries
| โน8.2 L/yr - โน30 L/yr |
L2 Engineer
155
salaries
| โน3.4 L/yr - โน10.1 L/yr |
Engineer
132
salaries
| โน4 L/yr - โน14.5 L/yr |
Associate
116
salaries
| โน14 L/yr - โน45 L/yr |
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain
AtkinsRealis