Filter interviews by
Cooling tower in power plant is used to remove excess heat from the water used in the cooling system.
Cooling tower helps in maintaining the temperature of water used in the cooling system.
It removes excess heat from the water and releases it into the atmosphere.
This helps in preventing overheating of the equipment and ensures efficient operation.
Examples of cooling towers include natural draft, mechanical draft, a...
Initial setting time of cement is the time taken by cement to harden and resist penetration by a standard needle.
Initial setting time is affected by factors like temperature, water-cement ratio, and type of cement.
The standard needle used for testing has a diameter of 1.13 mm and a length of 50 mm.
The initial setting time of ordinary Portland cement is around 30 minutes.
The initial setting time of rapid hardening ...
Handled projects with power capacity up to 500 MW
Managed electrical design and installation for power plants with capacity up to 500 MW
Oversaw testing and commissioning of electrical systems for large-scale industrial projects
Implemented energy-efficient solutions to optimize power usage and reduce costs
Collaborated with cross-functional teams to ensure project timelines and budgets were met
Otto cycle is a four-stroke combustion cycle used in spark-ignition engines.
It consists of four processes: intake, compression, power, and exhaust.
During the intake stroke, the fuel-air mixture is drawn into the cylinder.
In the compression stroke, the mixture is compressed to a high pressure and temperature.
The power stroke is where the spark plug ignites the mixture, causing it to expand and push the piston down.
...
4 stroke engines have separate intake, compression, combustion and exhaust strokes while 2 stroke engines combine intake and compression strokes and combustion and exhaust strokes.
4 stroke engines are more fuel efficient and produce less pollution than 2 stroke engines.
2 stroke engines are simpler in design and have fewer parts than 4 stroke engines.
2 stroke engines have a higher power-to-weight ratio than 4 strok...
IDFT controller stands for Inverse Discrete Fourier Transform controller.
IDFT controller is used in signal processing to convert frequency domain signals to time domain signals.
It is the inverse of the Discrete Fourier Transform (DFT) controller.
IDFT controller is commonly used in audio and video processing applications.
It is also used in communication systems to convert frequency domain signals to time domain sig...
Speed control on motors and generators can be achieved through various methods.
For motors, speed control can be achieved by adjusting the voltage, frequency, or the number of poles.
For generators, speed control can be achieved by adjusting the mechanical input or the load connected to the generator.
In motors, variable frequency drives (VFDs) can be used to control the speed by adjusting the frequency of the power ...
Landing zones are pre-defined architectures for deploying workloads in Azure.
Landing zones provide a standardized approach to deploying workloads in Azure.
They help ensure compliance with organizational policies and best practices.
Landing zones can be customized to meet specific requirements.
Examples of landing zones include the Enterprise-Scale Landing Zone and the Hub-Spoke Landing Zone.
Assumptions in stress block parameters refer to the simplifications made in modeling the stress distribution in concrete beams.
Assumptions include assuming a rectangular stress block shape for simplicity
Assuming a linear stress distribution within the stress block
Neglecting the effects of shear in the stress block
Assuming a constant value for the compressive stress in the stress block
These assumptions help simplif...
BMD of frames refers to the bending moment diagrams of structural frames under different loading conditions.
BMD shows the variation of bending moment along the length of the frame.
Different cases include point loads, distributed loads, and varying support conditions.
Calculating BMD involves determining reactions, internal forces, and moment distribution.
Example: BMD for a simply supported beam with a point load at...
I applied via Referral and was interviewed in Jun 2024. There were 3 interview rounds.
I am a passionate and experienced Design Engineer with a strong background in mechanical engineering.
Graduated with a degree in Mechanical Engineering
Worked at XYZ Company for 5 years designing innovative products
Proficient in CAD software such as SolidWorks and AutoCAD
Strong problem-solving skills and attention to detail
Collaborated with cross-functional teams to bring projects to completion
Passion for designing structures and solving complex problems led me to choose civil engineering.
Passion for designing structures
Interest in solving complex problems
Desire to contribute to infrastructure development
Fascination with construction projects
Inspiration from iconic architectural landmarks
Water ratio refers to the proportion of water in a mixture or solution.
Water ratio is typically expressed as a percentage or ratio of water to the total mixture.
It is commonly used in various industries such as construction, agriculture, and food production.
For example, a concrete mix may have a water ratio of 0.5, meaning there is half as much water as other ingredients.
The estimation for a 1 BHK varies depending on location, size, amenities, and other factors.
Estimation for 1 BHK can range from $50,000 to $500,000 or more.
Factors affecting the estimation include location (urban vs rural), size of the apartment, amenities provided, and demand in the area.
For example, a 1 BHK in a prime location in a metropolitan city will cost more than a similar apartment in a suburban area.
I saved project costs by optimizing resource allocation, negotiating with vendors, and implementing cost-effective solutions.
Optimized resource allocation to reduce unnecessary expenses
Negotiated with vendors for better pricing and discounts
Implemented cost-effective solutions without compromising quality
Utilized technology to streamline processes and reduce manual labor costs
Rate analysis is the process of determining the rates of various items of work to calculate the cost of a project.
Rate analysis involves breaking down the cost of materials, labor, and equipment for each item of work in a project.
It helps in estimating the total cost of a project and in preparing accurate project budgets.
Rate analysis is essential for comparing different bids from contractors and ensuring fair pricing.
...
I am an organized and detail-oriented professional with a passion for creating efficient office environments.
Over 5 years of experience in office management, ensuring smooth daily operations.
Skilled in budgeting and financial management, having reduced office expenses by 15% in my previous role.
Proficient in various office software, including Microsoft Office Suite and project management tools like Asana.
Strong communi...
I have over five years of experience managing office operations, enhancing efficiency, and supporting team collaboration.
Managed daily office operations, ensuring smooth workflow and timely completion of tasks.
Implemented a new filing system that reduced document retrieval time by 30%.
Coordinated team meetings and events, improving communication and collaboration among staff.
Oversaw inventory management, ensuring that ...
I prefer a job location that fosters collaboration, is easily accessible, and has a positive work environment.
Proximity to public transport for easy commuting, like being near a subway station.
A vibrant office culture that encourages teamwork and creativity, such as open-plan spaces.
Access to amenities like cafes and parks for breaks and relaxation, enhancing work-life balance.
A location that aligns with my personal va...
I appeared for an interview in Dec 2024.
Tool test based on experience
I appeared for an interview in Sep 2024, where I was asked the following questions.
In my previous role, I handled various use cases involving threat detection, incident response, and compliance monitoring.
Developed a real-time monitoring system to detect anomalies in network traffic, reducing response time by 30%.
Implemented a SIEM solution that aggregated logs from multiple sources, improving incident response efficiency.
Conducted regular security assessments and vulnerability scans, identifying cri...
I applied via Indeed and was interviewed in Dec 2023. There was 1 interview round.
The layout of building points is determined by using surveying equipment and techniques to mark the location of key points on the ground.
Start by establishing a reference point using GPS or total station.
Use measuring tapes, levels, and theodolites to mark out the building corners and key points.
Ensure accuracy by cross-checking measurements and using benchmarks for elevation.
Consider factors like setbacks, utilities, ...
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.
Top trending discussions
The duration of Assystem interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 40 interview experiences
Difficulty level
Duration
based on 679 reviews
Rating in categories
Hyderabad / Secunderabad,
Gurgaon / Gurugram
8-13 Yrs
Not Disclosed
Design Engineer
81
salaries
| ₹5 L/yr - ₹11 L/yr |
Structural Design Engineer
55
salaries
| ₹5.6 L/yr - ₹12.4 L/yr |
Consultant Engineer
51
salaries
| ₹4.8 L/yr - ₹9 L/yr |
Senior Engineer
35
salaries
| ₹7 L/yr - ₹14.5 L/yr |
Assistant Design Engineer
34
salaries
| ₹3 L/yr - ₹6 L/yr |
Suzlon Group
Torrent Power
Eaton
Vestas