Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

G R Infraprojects Senior Manager Interview Questions and Answers

Updated 7 Jul 2023

G R Infraprojects Senior Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Complete interview through system
Round 3 - Technical 

(1 Question)

  • Q1. Need expertise in SAP and Excel

Interview Preparation Tips

Interview preparation tips for other job seekers - Excel and SAP must

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about G R Infraprojects?
Ask anonymously on communities.

Interview questions from similar companies

I appeared for an interview before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

Senior Manager Interview Questions Asked at Other Companies

Q1. What is your understanding of the requirements for shuttering mat ... read more
asked in Tata Motors
Q2. Types of pumps and for which process which types of pumps are req ... read more
asked in Tata Motors
Q3. What would you do if there was a shortage of parts for a customer ... read more
asked in Tata Motors
Q4. If you are a customer of a TATA product and face a problem, where ... read more
asked in Flipkart
Q5. What would you do to double the revenue of your organization?

I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Were your current company, salary
  • Q2. Which years expearance

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't join this company. Very very dangoures persons have this company. Future 100% spoil. Time waste. Politics 10000%. After work salary not give.

I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What is Experience in Oi; & Gas Sector in which Department
  • Ans. 

    I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.

    • I have worked in the Operations department of an oil and gas company for 5 years.

    • During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.

    • I have successfully managed various projects related to drilling, production optimization, and cost re...

  • Answered by AI
  • Q2. How much Experience in Planning Department
  • Ans. 

    I have over five years of experience in planning, focusing on project management and resource allocation.

    • Led a team in developing a strategic plan that improved project delivery timelines by 20%.

    • Implemented a new scheduling system that reduced resource conflicts and increased efficiency.

    • Collaborated with cross-functional teams to align project goals with organizational objectives.

    • Conducted regular reviews and adjustmen...

  • Answered by AI
  • Q3. Where are you from
  • Ans. 

    I hail from a vibrant city known for its rich culture, diverse community, and beautiful landscapes, which have shaped my perspective.

    • I grew up in a city that celebrates various festivals, such as Diwali and Christmas, showcasing its cultural diversity.

    • The local cuisine is a blend of flavors, with street food being a popular aspect of daily life, like the famous chaat and biryani.

    • Nature is close to my heart; I often vis...

  • Answered by AI
  • Q4. How do you Preparation of RA BILL
  • Ans. 

    Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.

    • Gather all necessary information such as product or service details, quantity, and pricing

    • Create a detailed invoice with clear descriptions and itemized costs

    • Include any applicable taxes or discounts

    • Ensure accuracy and completeness of the bill before submitting to the client

    • Follow up with th...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The job description may also give you ideas about questions the employer When an interviewer asks you to describe your strengths

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your past practical work experience
Round 3 - HR 

(1 Question)

  • Q1. Salary, Designation and accommodation negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work in construction industry, can gather lots of experience

G R Infraprojects HR Interview Questions

21 questions and answers

Q. Tell me about a project that interests you and why you are interested in jo ... read more
Q. Why are you suitable for this job?
Q. What are your expectations of the company?

I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. General and deep questions regarding the subject will be asked as per the position applied and past experience.
Round 3 - HR 

(1 Question)

  • Q1. Regarding salary negotiation the discussion was on. TPL always gives a hike from current salary where no other current contractor in the industry can offer the same. Their package is fixed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well according to your past experiences. Don’t have any loose end in what you have worked on. Be vigilant and have patience while replying becoz mostly interview will be took on Skype during 2019 nowadays using Microsoft teams
Are these interview questions helpful?

I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. General accounting and tax related questions

Interview Preparation Tips

Topics to prepare for Kalpataru Projects International Deputy Manager interview:
  • Key Accounts
Interview preparation tips for other job seekers - Be confident and lead the interviewer they will see how confident you are

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Gst Questions, Audit exposure, Past Experience and personal skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give your best and brief as told by interviewer

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Senior Manager interview?
G R Infraprojects interview process usually has 3 rounds. The most common rounds in the G R Infraprojects interview process are Resume Shortlist, One-on-one Round and Technical.
How to prepare for G R Infraprojects Senior Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are Senior Management, Substation, 400Kv, Construction and MIS Reporting.

Tell us how to improve this page.

Overall Interview Experience Rating

3/5

based on 2 interview experiences

G R Infraprojects Senior Manager Salary
based on 57 salaries
₹14.4 L/yr - ₹24.7 L/yr
17% less than the average Senior Manager Salary in India
View more details

G R Infraprojects Senior Manager Reviews and Ratings

based on 19 reviews

4.2/5

Rating in categories

3.2

Skill development

3.7

Work-life balance

4.0

Salary

3.2

Job security

3.3

Company culture

3.8

Promotions

3.6

Work satisfaction

Explore 19 Reviews and Ratings
Senior Manager/ AGM (QA/QC - Hydro or Tunnel)

Gurgaon / Gurugram

20-20 Yrs

Not Disclosed

Senior Manager Substation Electrical

Vijayapura

15-20 Yrs

Not Disclosed

Senior Manager

Hubli,

Mangaluru

+3

13-15 Yrs

₹ 16-25 LPA

Explore more jobs
Assistant Manager
317 salaries
unlock blur

₹4.8 L/yr - ₹11.5 L/yr

Senior Engineer
241 salaries
unlock blur

₹4.1 L/yr - ₹8.8 L/yr

Engineer
135 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Deputy Manager
134 salaries
unlock blur

₹9.5 L/yr - ₹17 L/yr

Senior Executive
112 salaries
unlock blur

₹3.5 L/yr - ₹7.4 L/yr

Explore more salaries
Compare G R Infraprojects with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
write
Share an Interview