Filter interviews by
P2P cycle stands for Procure to Pay cycle, which is the process of obtaining goods or services from a supplier to making payment for them.
P2P cycle starts with the need for a product or service, followed by requisition, approval, purchase order creation, goods receipt, invoice receipt, and ends with payment to the supplier.
It involves multiple steps such as supplier selection, negotiation, contract management, and...
ABC analysis is a material management technique that categorizes inventory items into three categories based on their importance.
ABC analysis categorizes inventory items into A, B, and C categories based on their value and importance
Category A items are high value items that require tight control and frequent monitoring
Category C items are low value items that require less attention and can be ordered less frequen...
One lean methodology is 5S, which focuses on organizing the workplace for efficiency and effectiveness.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
It involves organizing the workplace by removing unnecessary items, arranging necessary items for easy access, cleaning and maintaining the workspace, setting standards for organization, and sustaining the improvements.
Example: Implementing 5S in a...
Analyze code snippets to identify and explain errors in software testing.
Check for syntax errors, e.g., missing semicolons or brackets.
Look for logical errors, such as incorrect conditions in if statements.
Verify variable initialization; uninitialized variables can lead to runtime errors.
Ensure proper use of data types; for example, trying to perform arithmetic on strings.
Review function calls for correct paramete...
Find the largest sub string in a given string.
Iterate through the string and check for all possible substrings
Keep track of the length of each substring and update the maximum length found
Return the largest substring found
I'm looking for a role that challenges me, allows for growth, and lets me lead a team towards achieving our goals effectively.
I seek a position where I can leverage my leadership skills to inspire and motivate my team.
I want to work in an environment that encourages innovation and collaboration, like my previous role where we implemented a new project management tool.
I'm eager to take on more responsibilities, suc...
I have experience in general assembly work.
I have worked in a factory assembling electronic components.
I am familiar with using hand tools and power tools.
I have experience working in a team to meet production goals.
Resultant stiffness of two equal parts of a cut spring attached in parallel is 4K.
When two springs are attached in parallel, the resultant stiffness is the sum of their individual stiffness.
The stiffness of a spring is directly proportional to its length and inversely proportional to its cross-sectional area.
Therefore, when a spring of length L and stiffness K is cut into two equal parts, each part will have a len...
The natural frequency of a simple mass system with the mass of the spring considered.
Natural frequency is the frequency at which a system oscillates without any external force.
The formula for natural frequency is sqrt(k/m)
Where k is the spring constant and m is the mass of the system.
The mass of the spring is added to the total mass of the system.
Example: A mass of 2 kg is attached to a spring with a spring consta...
The first natural frequency of a semi-definite system is zero, which represents rigid body motion.
The first natural frequency of a system is the frequency at which it oscillates without any external force applied.
A semi-definite system has one or more degrees of freedom that are constrained, resulting in rigid body motion.
The first natural frequency of a semi-definite system is always zero, regardless of the numbe...
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
I interned at a logistics firm, focusing on optimizing supply chain processes and enhancing inventory management strategies.
Assisted in analyzing supply chain data to identify inefficiencies, leading to a 15% reduction in delivery times.
Collaborated with the procurement team to streamline vendor selection, resulting in cost savings of 10% on materials.
Participated in weekly meetings to discuss inventory levels, contrib...
One lean methodology is 5S, which focuses on organizing the workplace for efficiency and effectiveness.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
It involves organizing the workplace by removing unnecessary items, arranging necessary items for easy access, cleaning and maintaining the workspace, setting standards for organization, and sustaining the improvements.
Example: Implementing 5S in a ware...
ABC analysis is a material management technique that categorizes inventory items into three categories based on their importance.
ABC analysis categorizes inventory items into A, B, and C categories based on their value and importance
Category A items are high value items that require tight control and frequent monitoring
Category C items are low value items that require less attention and can be ordered less frequently
Ex...
Collaboration in a supply chain project led to improved efficiency and cost savings through effective teamwork and communication.
Worked on a cross-functional team to streamline inventory management processes.
Regular meetings facilitated open communication, allowing us to identify bottlenecks quickly.
Implemented a shared digital platform for real-time data sharing, enhancing decision-making.
Achieved a 15% reduction in l...
P2P cycle stands for Procure to Pay cycle, which is the process of obtaining goods or services from a supplier to making payment for them.
P2P cycle starts with the need for a product or service, followed by requisition, approval, purchase order creation, goods receipt, invoice receipt, and ends with payment to the supplier.
It involves multiple steps such as supplier selection, negotiation, contract management, and invo...
I am proficient in various Excel skills, including data analysis, pivot tables, and advanced formulas for effective supply chain management.
Data Analysis: I can use functions like VLOOKUP and HLOOKUP to extract and analyze data efficiently.
Pivot Tables: I create pivot tables to summarize large datasets, allowing for quick insights into supply chain performance.
Conditional Formatting: I apply conditional formatting to h...
I worked on a project to develop a mobile app for tracking fitness goals and progress.
Collaborated with a cross-functional team to define requirements and prioritize features
Conducted user research and testing to gather feedback and make improvements
Implemented gamification elements to increase user engagement
Integrated with wearable devices to track activity levels and sync data
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Hacker ranck coding link was shared
Online coding test, 2 questions
I applied via LinkedIn
They asked question from resume such as courses i did,project,postion and responsibilty,training and internship this were question . How will you support this job role
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
I applied via Approached by Company
I applied via Campus Placement
Top trending discussions
Some of the top questions asked at the General Motors interview -
The duration of General Motors interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 22 interview experiences
Difficulty level
Duration
based on 521 reviews
Rating in categories
Bangalore / Bengaluru
5-10 Yrs
Not Disclosed
Team Member
97
salaries
| ₹3.5 L/yr - ₹7.5 L/yr |
Team Lead
96
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Senior Engineer
68
salaries
| ₹10.9 L/yr - ₹17 L/yr |
Design Engineer
42
salaries
| ₹3.5 L/yr - ₹6 L/yr |
Assistant Manager
37
salaries
| ₹4.8 L/yr - ₹12.1 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland