i
JLL
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
I appeared for an interview in Apr 2025, where I was asked the following questions.
Aptitude test like mathematics question ,reasoning & our department like mechanical engineer
Top trending discussions
I applied via Company Website and was interviewed in Nov 2022. There were 3 interview rounds.
Half an hour duration.Site related questions.
Workability of concrete refers to its ease of mixing, placing, and compacting.
Workability is affected by water content, aggregate size and shape, and admixtures.
A concrete mix with good workability will be easy to place and compact, resulting in a smooth finish.
However, if the mix is too workable, it may be prone to segregation and bleeding.
Longitudinal cracks on concrete pavements can be caused by a variety of factors...
Hollow blocks are commonly used in construction as they are lightweight, durable and provide good insulation.
Hollow blocks are made of concrete with hollow cores.
They are used for walls, partitions, and fences.
They are lightweight and easy to handle, reducing construction time and labor costs.
Hollow blocks provide good insulation, reducing energy costs for heating and cooling.
They are durable and resistant to fire, pes...
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I have over five years of experience as a Site Engineer, managing construction projects and ensuring quality and safety standards.
Managed a team of 10 workers on a residential project, completing it 2 weeks ahead of schedule.
Implemented safety protocols that reduced on-site accidents by 30%.
Coordinated with architects and contractors to ensure project specifications were met.
Conducted regular site inspections to monito...
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Mar 2021. There were 2 interview rounds.
based on 1 interview experience
Difficulty level
Duration
based on 3 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹5.5 L/yr - ₹12.5 L/yr |
Facility Executive
1k
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
Assistant Project Leader
633
salaries
| ₹5.3 L/yr - ₹12 L/yr |
Senior Analyst
599
salaries
| ₹4.6 L/yr - ₹9.1 L/yr |
Assistant Facility Manager
504
salaries
| ₹4.8 L/yr - ₹11 L/yr |
CBRE
NoBroker
Cushman & Wakefield
Colliers India