Managing a team involves effective communication, delegation, motivation, and conflict resolution.
Establish clear goals and expectations for the team
Communicate regularly and openly with team members
Delegate tasks based on team members' strengths and skills
Provide feedback and recognition for good work
Address conflicts and issues promptly and fairly
Lead by example and demonstrate a positive attitude
Encourage colla...
Grab is a Southeast Asian ride-hailing, food delivery, and financial services company. The Pipeline is a program to develop tech talent.
Grab is headquartered in Singapore and operates in 8 countries.
It offers various services like ride-hailing, food delivery, and financial services.
The Pipeline is a program to develop tech talent in Southeast Asia.
It provides training and mentorship to aspiring tech professionals.
...
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment da...
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may v...
Mortar is a mixture of cement, sand, and water used in construction. A circuit is a closed loop of electrical components.
Mortar is a binding material used in construction to hold bricks or stones together.
It is made by mixing cement, sand, and water in specific proportions.
Mortar hardens over time and provides strength and stability to the structure.
Circuits are pathways through which electricity flows.
They consis...
Questions related to site engineering including slump test, TBM, steel weight calculation, site supervision, BBS, concrete quantity calculation, and pipeline.
Slump test measures the consistency of concrete. Procedure involves filling a slump cone with concrete and measuring the slump after removing the cone.
TBM stands for Tunnel Boring Machine, used for excavating tunnels in soil or rock.
Weight of steel can be cal...
Foundations are crucial structural elements that support buildings, categorized into shallow and deep types based on their depth and load-bearing capacity.
Shallow Foundations: Used for lighter structures, placed close to the ground surface. Example: Spread Footing.
Deep Foundations: Required for heavier structures or poor soil conditions, extending deeper into the ground. Example: Pile Foundation.
Strip Foundations:...
Hydro testing work involves testing pipelines, vessels, or other equipment using water or other liquids to ensure they can withstand pressure.
Hydro testing is a process used to check the integrity of pipelines, vessels, or other equipment by filling them with water or another liquid and pressurizing them to a specified level.
The test is conducted to ensure that the equipment can safely operate under normal operati...
A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.
Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.
The prop helps to reduce the bending moment and deflection at the free end of the beam.
These beams are commonly used in construction to support overhanging structures or balconies.
Ex...
I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.
A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.
Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.
The prop helps to reduce the bending moment and deflection at the free end of the beam.
These beams are commonly used in construction to support overhanging structures or balconies.
Example...
The beam with the highest thickness will depend on the specific design and requirements of the structure.
The beam with the highest thickness will typically be a main load-bearing beam in the structure.
Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.
For example, a bridge beam supporting heavy traffic will likely have a higher thickness than ...
Different types of slabs include one-way slab, two-way slab, flat slab, ribbed slab, waffle slab, and hollow core slab.
One-way slab: supported on two opposite sides and bends in only one direction
Two-way slab: supported on all four sides and bends in two directions
Flat slab: without beams and supported directly on columns
Ribbed slab: with ribs on the underside for added strength and reduced weight
Waffle slab: with grid...
I appeared for an interview in Jan 2025, where I was asked the following questions.
Yes, I can work 12 hours, as I am committed to meeting project deadlines and ensuring quality work.
I have experience working long shifts during peak project phases.
In my previous role, I often worked extended hours to meet tight deadlines.
I prioritize tasks effectively to maintain productivity during long hours.
I ensure to take necessary breaks to stay focused and efficient.
I appeared for an interview in Jul 2024.
Hydro testing work involves testing pipelines, vessels, or other equipment using water or other liquids to ensure they can withstand pressure.
Hydro testing is a process used to check the integrity of pipelines, vessels, or other equipment by filling them with water or another liquid and pressurizing them to a specified level.
The test is conducted to ensure that the equipment can safely operate under normal operating co...
I appeared for an interview before May 2024, where I was asked the following questions.
Top trending discussions
The duration of L&T Construction Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 26 interview experiences
Difficulty level
Duration
based on 176 reviews
Rating in categories
Assistant Manager
1.2k
salaries
| ₹8.9 L/yr - ₹15.6 L/yr |
Senior Engineer
735
salaries
| ₹5 L/yr - ₹10.7 L/yr |
Assistant Construction Manager
495
salaries
| ₹9.3 L/yr - ₹17 L/yr |
Civil Engineer
328
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Construction Management
315
salaries
| ₹15.2 L/yr - ₹27 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Power Mech Projects
AtkinsRealis