I appeared for an interview in Aug 2024, where I was asked the following questions.
MPT stands for Magnetic Particle Testing, a non-destructive testing method for detecting surface and near-surface defects in materials.
MPT uses magnetic fields to detect flaws in ferromagnetic materials.
Commonly used in industries like aerospace, automotive, and manufacturing.
The process involves applying magnetic particles to the surface of the material.
Defects are indicated by the accumulation of particles at the fla...
A probe is a device used to measure, inspect, or explore materials or structures in various fields, including NDT.
Probes can be used in ultrasonic testing to detect flaws in materials.
In eddy current testing, probes measure electrical conductivity and surface defects.
Thermal probes can assess temperature variations in materials, indicating potential issues.
Top trending discussions
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
posted on 8 Jul 2017
I appeared for an interview before Jul 2016.
posted on 16 Aug 2020
I applied via Walk-in and was interviewed before Aug 2019. There were 3 interview rounds.
To repair a hydraulic pump, first identify the problem and then disassemble the pump to replace or repair the faulty parts.
Identify the problem by checking for leaks, unusual noises, or loss of pressure.
Disassemble the pump carefully, taking note of the order of parts and any seals or gaskets.
Inspect the parts for damage or wear, and replace any faulty components.
Reassemble the pump, making sure all parts are properly ...
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.
The beam is placed on a lapping machine with an abrasive surface.
The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.
The process is repeated with finer and finer abrasives until the desired finish is achieved.
Lapping can improve the strength and durability of the beam.
It is comm...
The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.
The number of cube samples may vary depending on the project specifications and requirements.
Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.
The cube samples are taken to test the compressive strength of the concrete.
The number of cube samples may also depend on the locat...
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
posted on 3 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
Submerged arc welding is a process where an arc is maintained between a consumable electrode and the workpiece under a blanket of granular flux.
The process is used for welding thick sections of steel.
The granular flux shields the weld from atmospheric contamination.
The consumable electrode is continuously fed into the weld pool.
The process is commonly used in shipbuilding, pipeline construction, and pressure vessel fab...
Defected welding joints can be rectified through a process of cutting, grinding, and rewelding.
Identify the type and extent of the defect
Cut out the defected portion of the joint
Grind the edges of the remaining joint to prepare for rewelding
Reweld the joint using appropriate welding techniques and materials
Perform non-destructive testing to ensure the quality of the repaired joint
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
The procedure for pilecap excavation involves several steps to ensure proper excavation and preparation for the construction of pilecaps.
Clear the site and mark the boundaries of the pilecap area.
Excavate the soil within the marked boundaries to the required depth and dimensions.
Ensure proper shoring and support systems are in place to prevent collapse.
Remove any obstructions or debris from the excavation area.
Inspect ...
based on 1 interview experience
Difficulty level
Duration
based on 9 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹9.5 L/yr - ₹17 L/yr |
Senior Engineer
3.6k
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Engineer
1.5k
salaries
| ₹3.9 L/yr - ₹9.2 L/yr |
Manager
1.3k
salaries
| ₹14.7 L/yr - ₹25 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹9.1 L/yr - ₹16 L/yr |
AECOM
Megha Engineering & Infrastructures
Alstom Transportation
Burns & McDonnell