Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Larsen & Toubro Limited NDT Technician Interview Questions and Answers

Updated 4 Aug 2025

Larsen & Toubro Limited NDT Technician Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Aug 2024, where I was asked the following questions.

  • Q1. ASME SEC8 DIV 1 APPENDIX 8
  • Q2. What is mpt
  • Ans. 

    MPT stands for Magnetic Particle Testing, a non-destructive testing method for detecting surface and near-surface defects in materials.

    • MPT uses magnetic fields to detect flaws in ferromagnetic materials.

    • Commonly used in industries like aerospace, automotive, and manufacturing.

    • The process involves applying magnetic particles to the surface of the material.

    • Defects are indicated by the accumulation of particles at the fla...

  • Answered by AI
  • Q3. What is prob
  • Ans. 

    A probe is a device used to measure, inspect, or explore materials or structures in various fields, including NDT.

    • Probes can be used in ultrasonic testing to detect flaws in materials.

    • In eddy current testing, probes measure electrical conductivity and surface defects.

    • Thermal probes can assess temperature variations in materials, indicating potential issues.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - NDT technician qa qc

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Larsen & Toubro Limited?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tower cranes erection,batching plant maintenance and electrical safety
  • Q2. Ok normal

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal not tough

NDT Technician Interview Questions Asked at Other Companies

Q1. What is the gap between the legs of a yoke machine?
asked in Wheels
Q2. How to weld fusion throw in joint? What is the initial pulse of e ... read more
Q3. How many types of RT rays are there?
Q4. What are fatigue cracks?
Q5. 1. What is the producer of DPI, MPI, RT,UT

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 25 Feb 2015

Interview Questionnaire 

1 Question

  • Q1. Questions were from bending moment and shear force diagrams;

Interview Preparation Tips

Round: Test
Experience: Technical (Structural engineering questions only) and aptitude test

Round: Technical Interview
Tips: Questions on Earthquake engineering, structural dynamics,Design of RC and steel structures can also be asked.

Round: HR Interview
Experience: HR interview is trivial if you are selected through technical interview.

General Tips: Technical/aptitude test and technical interview had maximum weightage. If you crack it the best way, you are in!
Skill Tips: CGPA does not help much. Internship, project etc. questions were not asked.
Skills: Aptitude skills, Technical skills, Designing skills
College Name: IIT MADRAS

I appeared for an interview before Jul 2016.

Interview Questionnaire 

2 Questions

  • Q1. Non technical as a math Gk and about me
  • Q2. Introduction

Interview Preparation Tips

Round: Test
Experience: My test scores is totall 57 number
Total Questions: 70

Round: HR Interview
Experience: My test scores is totall 57 number
Tips: At this must required your Confident

I applied via Walk-in and was interviewed before Aug 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell daily maintenance schedules of machineries
  • Q2. Tell how many types of oils uses in construction machinery
  • Q3. How to repair hydraulic pump?
  • Ans. 

    To repair a hydraulic pump, first identify the problem and then disassemble the pump to replace or repair the faulty parts.

    • Identify the problem by checking for leaks, unusual noises, or loss of pressure.

    • Disassemble the pump carefully, taking note of the order of parts and any seals or gaskets.

    • Inspect the parts for damage or wear, and replace any faulty components.

    • Reassemble the pump, making sure all parts are properly ...

  • Answered by AI
  • Q4. What is the reason of engine failure ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Tough

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 12 Jun 2021

I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How is lapping of beam done.
  • Ans. 

    Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.

    • The beam is placed on a lapping machine with an abrasive surface.

    • The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.

    • The process is repeated with finer and finer abrasives until the desired finish is achieved.

    • Lapping can improve the strength and durability of the beam.

    • It is comm...

  • Answered by AI
  • Q2. How much cube samples are taken for 60 cum of concrete.
  • Ans. 

    The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.

    • The number of cube samples may vary depending on the project specifications and requirements.

    • Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.

    • The cube samples are taken to test the compressive strength of the concrete.

    • The number of cube samples may also depend on the locat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm , listen carefully try your answe to the point and short.. Main a good english communication..

Larsen & Toubro Limited HR Interview Questions

268 questions and answers

Q. Can you explain your previous work experience?
Q. What actions do you take during an emergency?
Q. Tell me about your last work experience.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Based on my past experience
  • Q2. Asking about is code of pipes, process flow diagram,types of welding,pumps.
Round 3 - HR 

(2 Questions)

  • Q1. Asking about my family, past experience.
  • Q2. Why should we hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, focus on the employee's need, showcase your Abilities,
Are these interview questions helpful?

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What are the common welding process?
  • Q2. What are the tests conducted on welding joints?
  • Q3. What is submerged arc welding process?
  • Ans. 

    Submerged arc welding is a process where an arc is maintained between a consumable electrode and the workpiece under a blanket of granular flux.

    • The process is used for welding thick sections of steel.

    • The granular flux shields the weld from atmospheric contamination.

    • The consumable electrode is continuously fed into the weld pool.

    • The process is commonly used in shipbuilding, pipeline construction, and pressure vessel fab...

  • Answered by AI
  • Q4. Procedure of rectification for defected welding joints?
  • Ans. 

    Defected welding joints can be rectified through a process of cutting, grinding, and rewelding.

    • Identify the type and extent of the defect

    • Cut out the defected portion of the joint

    • Grind the edges of the remaining joint to prepare for rewelding

    • Reweld the joint using appropriate welding techniques and materials

    • Perform non-destructive testing to ensure the quality of the repaired joint

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go for meil you can experience a great environment and learning platform

Interview Questionnaire 

9 Questions

  • Q1. Introduction.Techinical questions related to studies.
  • Q2. General Awareness questions.
  • Q3. About previous job.
  • Q4. Questions related to my qualifications.
  • Q5. Practical knowledge
  • Q6. Theoretical knowledge
  • Q7. Hobbies?
  • Q8. Health related?
  • Q9. Phy
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the procedure for pilecap excavation?
  • Ans. 

    The procedure for pilecap excavation involves several steps to ensure proper excavation and preparation for the construction of pilecaps.

    • Clear the site and mark the boundaries of the pilecap area.

    • Excavate the soil within the marked boundaries to the required depth and dimensions.

    • Ensure proper shoring and support systems are in place to prevent collapse.

    • Remove any obstructions or debris from the excavation area.

    • Inspect ...

  • Answered by AI

Larsen & Toubro Limited Interview FAQs

What are the top questions asked in Larsen & Toubro Limited NDT Technician interview?

Some of the top questions asked at the Larsen & Toubro Limited NDT Technician interview -

  1. What is ...read more
  2. What is p...read more
  3. ASME SEC8 DIV 1 APPENDI...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 1 interview experience

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more
Larsen & Toubro Limited NDT Technician Salary
based on 20 salaries
₹1.4 L/yr - ₹4.3 L/yr
22% less than the average NDT Technician Salary in India
View more details

Larsen & Toubro Limited NDT Technician Reviews and Ratings

based on 9 reviews

4.2/5

Rating in categories

3.2

Skill development

3.9

Work-life balance

2.8

Salary

2.6

Job security

3.4

Company culture

2.1

Promotions

3.4

Work satisfaction

Explore 9 Reviews and Ratings
Assistant Manager
3.9k salaries
unlock blur

₹9.5 L/yr - ₹17 L/yr

Senior Engineer
3.6k salaries
unlock blur

₹5.9 L/yr - ₹12 L/yr

Engineer
1.5k salaries
unlock blur

₹3.9 L/yr - ₹9.2 L/yr

Manager
1.3k salaries
unlock blur

₹14.7 L/yr - ₹25 L/yr

Assistant Construction Manager
1.2k salaries
unlock blur

₹9.1 L/yr - ₹16 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

AECOM

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare

Alstom Transportation

3.7
Compare

Burns & McDonnell

4.2
Compare
write
Share an Interview