  • Q1. How to do stringing
  • Ans. 

    Stringing involves setting up and aligning cables or wires for construction projects, ensuring proper tension and placement.

    • Identify the route for the string line, ensuring it is clear of obstacles.

    • Use stakes or markers to define the start and end points of the string.

    • Attach the string to the stakes, ensuring it is taut and level.

    • Check the alignment with a level or measuring tape to ensure accuracy.

    • Adjust as necessary ...

  • Answered by AI
  • Q2. How can do tower erection
  • Ans. 

    Tower erection involves careful planning, safety measures, and precise execution to ensure structural integrity and safety.

    • Conduct a site survey to assess ground conditions and accessibility.

    • Prepare the foundation according to engineering specifications, ensuring it can support the tower's weight.

    • Use cranes or other lifting equipment to raise tower sections, ensuring proper rigging and safety protocols.

    • Install guy wire...

  • Answered by AI

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Cement density and aggregate
  • Q2. Cement set time

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company NCC LIMITED

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What is the definition of rolling margin in the context of steel?
Q3. Which type of pipeline and standards do you follow?
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

Site Engineer Interview Questions & Answers

user image 1DS19CV116 TARIF

posted on 21 Apr 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self.

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 31 Dec 2022

Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the ratio of M 25 you have used in your project?
Round 3 - HR 

(3 Questions)

  • Q1. What is salary expectation?
  • Ans. Tell him your expected gross salary monthly/annual.
  • Answered Anonymously
  • Q2. What is your current salary?
  • Q3. Tell him truthly your salary per month/annual

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Site Engineer interview:
  • RCC
  • Reinforcement
  • Brick Work
  • Plastering
  • Form work
  • Layout
  • Drawing
Interview preparation tips for other job seekers - Prepare your past and current role and responsibilities what ever you doing.

What people are saying about Nagarjuna Construction Company

View All
a deputy project manager
1w
Stuck at Cross roads : Loyalty vs Financial relief
Hi All, Right now I was working in a Good construction company with Medium range salary with good working culture and supporting seniors and colleagues who supported me in tough situations, but my financial situation is too worse I am in a position that I am unable manage my monthly expenses and Loans, literally lost all my respect among family members. Now I got an offer from India's top construction company with approx salary hike of 35%. Someone already informed to management that I am planning to leave even before I got my offer.Now they keep on asking me to stay back and whatever be the financial situation they will sort out. I am unable to take decision that I have to accept the offer and move or stay with my current organisation. Please suggest
Got a question about Nagarjuna Construction Company?
Ask anonymously on communities.

Site Engineer Interview Questions & Answers

user image Trupti Ranjan Swain

posted on 2 Jul 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
-

I applied via Newspaper Ad and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. How do you handle unexpected technical challenges on-site?
  • Ans. 

    I approach unexpected technical challenges on-site by analyzing the problem, consulting with team members, researching possible solutions, and implementing the most effective course of action.

    • Analyze the problem thoroughly to understand the root cause

    • Consult with team members to gather different perspectives and expertise

    • Research possible solutions by utilizing resources such as technical manuals, online forums, and in...

  • Answered by AI
  • Q2. What steps would you take to ensure environmental compliance on a construction site?
  • Ans. 

    To ensure environmental compliance on a construction site, I would take several steps including conducting regular inspections, implementing erosion control measures, and properly disposing of hazardous materials.

    • Conduct regular inspections to ensure compliance with environmental regulations

    • Implement erosion control measures such as silt fences and sediment basins

    • Properly dispose of hazardous materials to prevent conta...

  • Answered by AI

Site Engineer Interview Questions & Answers

user image chandrasekhar minchala

posted on 6 Dec 2017

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting ...

  • Answered by AI

Nagarjuna Construction Company HR Interview Questions

62 questions and answers

Q. How do you manage pressure and adapt to last-minute changes?
Q. Where do you envision yourself in the next 3 to 5 years?
Q. What qualifications and experiences make you a suitable candidate for the p ... read more

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Are these interview questions helpful?

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What do you know about Grab & the Pipeline?
  • Ans. 

    Grab is a Southeast Asian ride-hailing, food delivery, and financial services company. The Pipeline is a program to develop tech talent.

    • Grab is headquartered in Singapore and operates in 8 countries.

    • It offers various services like ride-hailing, food delivery, and financial services.

    • The Pipeline is a program to develop tech talent in Southeast Asia.

    • It provides training and mentorship to aspiring tech professionals.

    • The p...

  • Answered by AI
  • Q2. What are you doing about wtp
  • Ans. 

    I am currently overseeing the construction and installation of the WTP equipment.

    • Coordinating with the project team to ensure timely completion of the WTP

    • Ensuring compliance with safety regulations and quality standards

    • Conducting regular inspections and tests to ensure proper functioning of the equipment

    • Addressing any issues or concerns that arise during the construction process

    • Collaborating with suppliers and contract...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have 2 years experience in Di & Harpe Pipeline

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Site Engineer interview?
Nagarjuna Construction Company interview process usually has 1-2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Nagarjuna Construction Company Site Engineer interview?

Some of the top questions asked at the Nagarjuna Construction Company Site Engineer interview -

  1. What is the ratio of M 25 you have used in your proje...read more
  2. What steps would you take to ensure environmental compliance on a construction ...read more
  3. How can do tower erect...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.8/5

based on 13 interview experiences

Difficulty level

Easy 67%
Hard 33%

Duration

Less than 2 weeks 50%
6-8 weeks 50%
View more
Nagarjuna Construction Company Site Engineer Salary
based on 230 salaries
₹2.1 L/yr - ₹6.6 L/yr
At par with the average Site Engineer Salary in India
View more details

Nagarjuna Construction Company Site Engineer Reviews and Ratings

based on 76 reviews

4.0/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

3.5

Salary

3.7

Job security

3.6

Company culture

3.2

Promotions

3.8

Work satisfaction

Explore 76 Reviews and Ratings
Junior Engineer
984 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Assistant Engineer
841 salaries
unlock blur

₹3.9 L/yr - ₹8.4 L/yr

Junior Engineer Civil
428 salaries
unlock blur

₹2.2 L/yr - ₹7.5 L/yr

Senior Engineer
410 salaries
unlock blur

₹4.8 L/yr - ₹11.1 L/yr

Assistant Engineer - Civil
296 salaries
unlock blur

₹3.7 L/yr - ₹7.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.2
Compare
write
Share an Interview