Reinforcement quantity for beam, slab, column, and tiles wastage calculations involve determining the amount of materials needed and accounting for potential wastage.
Calculate the required quantity of reinforcement for beams, slabs, columns, and tiles based on structural drawings and specifications.
Consider the standard lengths and sizes of reinforcement bars available in the market to minimize wastage.
Factor in the cu...
I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.
BBS preparation is essential for ensuring the strength and stability of footings and slabs.
BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.
The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.
The BBS also helps to estimate the quantity of steel required ...
The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.
The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.
The ratio of cement to sand also affects the quantity.
For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.
For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa...
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
I am a dedicated Quantity Surveyor with a strong background in cost management and project delivery in the construction industry.
Over 5 years of experience in quantity surveying, specializing in residential and commercial projects.
Proficient in cost estimation and budgeting, having successfully managed budgets exceeding $10 million.
Skilled in contract administration, ensuring compliance with legal and regulatory requir...
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
Risk assessment and SWMS are safety measures used in construction. Scaffolding is a temporary structure used to support workers and materials.
Risk assessment involves identifying potential hazards and evaluating the likelihood and severity of harm that could result from those hazards.
SWMS (Safe Work Method Statement) is a document that outlines the steps to be taken to complete a task safely.
Scaffolding is a temporary ...
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
based on 2 interview experiences
Difficulty level
Duration
based on 4 reviews
Rating in categories
Assistant Manager
118
salaries
| ₹5.5 L/yr - ₹12.7 L/yr |
Deputy Manager
84
salaries
| ₹8.2 L/yr - ₹15 L/yr |
Manager
46
salaries
| ₹12 L/yr - ₹18.8 L/yr |
Executive Accountant
37
salaries
| ₹2.3 L/yr - ₹6.6 L/yr |
Senior Executive
36
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Sobha
Lodha Group
Godrej Properties
Cushman & Wakefield