Rohan Builders Civil Engineer Interview Questions and Answers

Updated 30 Apr 2025

Rohan Builders Civil Engineer Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Civil power project
  • Q2. Road work farnace CCM
  • Q3. Industrial all project

Interview Preparation Tips

Interview preparation tips for other job seekers - Site layout work as per drawing and centre line marking. Bar bending schedule. Bar chart making. Materials consumption records Estimation and casting. Quality and quantity control. Levelling through auto level.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(11 Questions)

  • Q1. What is the Least Count of dumpy level Staff Reading ?
  • Ans. 

    The least count of a dumpy level staff reading is typically 0.01 ft or 1 mm.

    • The least count is the smallest measurement that can be read on the scale of the dumpy level staff.

    • For most dumpy levels, the least count is 0.01 ft or 1 mm.

    • This means that the dumpy level can measure differences in elevation as small as 0.01 ft or 1 mm.

  • Answered by AI
  • Q2. Why Concrete Cover is provided for reinforcement ?
  • Ans. 

    Concrete cover is provided for reinforcement to protect it from corrosion, fire, and other environmental factors.

    • Concrete cover protects reinforcement from corrosion by preventing exposure to moisture and aggressive chemicals.

    • It provides fire resistance by acting as a barrier between the reinforcement and the fire.

    • Concrete cover helps in maintaining the bond between reinforcement and concrete, ensuring structural integ...

  • Answered by AI
  • Q3. What is tha volume of 50 kg bag of cement ?
  • Q4. What is Dessity of steel ?
  • Q5. What is tha size of concrete Cube ?
  • Q6. What is tha Role of a Civil Engineer at Site ?
  • Ans. 

    Civil engineers at site are responsible for overseeing construction projects, ensuring they are completed safely, on time, and within budget.

    • Supervising construction activities to ensure compliance with design specifications and safety standards

    • Managing resources and materials efficiently to meet project deadlines

    • Collaborating with architects, contractors, and other stakeholders to resolve any issues that may arise

    • Cond...

  • Answered by AI
  • Q7. What is tha minimum concrete grade for RCC work ?
  • Ans. 

    Minimum concrete grade for RCC work is M20.

    • Minimum concrete grade for RCC work is M20 as per IS 456:2000.

    • Higher grades like M25, M30, M35, etc. can also be used depending on structural requirements.

    • Concrete grades indicate the compressive strength of concrete after 28 days of curing.

    • Higher grades are used for structures requiring higher strength like bridges, high-rise buildings, etc.

  • Answered by AI
  • Q8. What is rha dsssity of Unit wait of cement ?
  • Ans. 

    The density of unit weight of cement is typically around 1440 kg/m^3.

    • The density of unit weight of cement is commonly around 1440 kg/m^3.

    • This value can vary slightly depending on the type and brand of cement.

    • Density is a measure of mass per unit volume, in this case, kilograms per cubic meter.

  • Answered by AI
  • Q9. What is tha Grade of Cement ?
  • Q10. What is the Slump value of concrete for Normal RCC work
  • Ans. 

    The slump value of concrete for Normal RCC work is typically between 25-75 mm.

    • The slump value of concrete for Normal RCC work is usually around 50 mm.

    • The slump value can vary based on the specific requirements of the project and the mix design.

    • A higher slump value indicates a more workable concrete mix, while a lower slump value may be used for specialized applications.

    • It is important to test the slump value of concret...

  • Answered by AI
  • Q11. How many cube filled for 1 cubic meter concrete ?

Interview Preparation Tips

Topics to prepare for Rohan Builders Civil Engineer interview:
  • Building Structure
  • Building Construction
  • Site work
  • Billing
Interview preparation tips for other job seekers - This is a good company bit don't trust any one , one day this company will remove you like me

Civil Engineer Interview Questions Asked at Other Companies

Q1. What are the curing procedures for our precast segment?
Q2. What is the lap length of steel in the tension zone and compressi ... read more
asked in BHEL
Q3. 1)What is the difference of contraction joint & expansion joi ... read more
asked in Lodha Group
Q4. Describe the various stages in the construction of residential bu ... read more
Q5. What is the workability of concrete?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Campus Placement and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Concrete Proportion, density
Round 2 - Group Discussion 

Pre and post pendamic

Round 3 - HR 

(1 Question)

  • Q1. Ready to locate ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't take tension during interview, be confident always

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Rohan Builders?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview

Interview Questionnaire 

3 Questions

  • Q1. Finishing related
  • Q2. Gypsum plaster related
  • Q3. Tile fixing related

Senior Engineer Interview Questions & Answers

Sobha user image kailas kashiram sakpal

posted on 29 Nov 2021

I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. There are some 5-6 technical questions with safety & quality related 3-4 question

Interview Preparation Tips

Interview preparation tips for other job seekers - First was on site interview conducted by GM & PM
Second HR round with skill test of 25 marks - analytical questions
Third Vice VP Hr -regarding personal information
Fourth was VP - regarding personal infomational like family background & past experience about general work system

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. What is the process for testing pressure in plumbing systems?
  • Ans. 

    Testing pressure in plumbing systems ensures safety and functionality by identifying leaks and verifying system integrity.

    • 1. Visual Inspection: Check for visible leaks or damage in pipes and fittings.

    • 2. Pressure Testing: Use a pressure gauge to measure the system's pressure, ensuring it meets specified standards.

    • 3. Hydrostatic Testing: Fill the system with water and pressurize it to check for leaks over a specified dur...

  • Answered by AI
  • Q2. How many snag points are typically found in a single flat?
  • Ans. 

    A single flat typically has several snag points that need to be addressed for safety and functionality before occupancy.

    • Structural Issues: Cracks in walls or ceilings can indicate underlying structural problems that need to be fixed.

    • Plumbing Leaks: Check for leaks under sinks or around toilets, which can lead to water damage if not addressed.

    • Electrical Faults: Ensure all outlets and switches are functioning properly to...

  • Answered by AI
  • Q3. What is the number of bends typically present in vertical column stirrups?
  • Ans. 

    Vertical column stirrups typically have two bends to provide adequate support and confinement for the concrete.

    • Stirrups are usually made of steel bars bent into a U-shape.

    • Each stirrup typically has two bends at the ends to secure it to the main reinforcement.

    • The number of bends can vary based on design requirements, but two is standard for vertical columns.

    • For example, in a rectangular column, stirrups are placed at re...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Ans. 

    In my previous role, I led engineering projects, focusing on system optimization and team collaboration, leaving for career advancement.

    • Led a team of engineers to develop a new software application that improved processing speed by 30%.

    • Managed cross-functional projects, ensuring timely delivery and adherence to quality standards.

    • Implemented Agile methodologies, which increased team productivity and reduced project turn...

  • Answered by AI
  • Q2. What are the activities, you have handled
  • Ans. 

    I have managed diverse engineering projects, focusing on design, development, and team collaboration to deliver high-quality solutions.

    • Led a team of engineers in developing a scalable web application, improving performance by 30%.

    • Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.

    • Conducted code reviews and mentoring sessions, enhancing team skills and code quality.

    • Collaborated with c...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .

Rohan Builders Interview FAQs

How many rounds are there in Rohan Builders Civil Engineer interview?
Rohan Builders interview process usually has 2 rounds. The most common rounds in the Rohan Builders interview process are Technical, Group Discussion and HR.
How to prepare for Rohan Builders Civil Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rohan Builders. The most common topics and skills that interviewers at Rohan Builders expect are Civil Engineering, Site Execution, Civil Construction, Site Engineering and Construction.
What are the top questions asked in Rohan Builders Civil Engineer interview?

Some of the top questions asked at the Rohan Builders Civil Engineer interview -

  1. What is the Least Count of dumpy level Staff Readin...read more
  2. What is tha volume of 50 kg bag of cemen...read more
  3. What is the Slump value of concrete for Normal RCC w...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 4 interview experiences

Difficulty level

Easy 50%
Moderate 50%

Duration

Less than 2 weeks 100%
View more
Join Rohan Builders Great Living Engineered
Rohan Builders Civil Engineer Salary
based on 30 salaries
₹2.6 L/yr - ₹8 L/yr
16% less than the average Civil Engineer Salary in India
View more details

Rohan Builders Civil Engineer Reviews and Ratings

based on 13 reviews

4.3/5

Rating in categories

4.3

Skill development

4.0

Work-life balance

4.0

Salary

4.6

Job security

4.2

Company culture

4.1

Promotions

4.0

Work satisfaction

Explore 13 Reviews and Ratings
Senior Engineer
94 salaries
unlock blur

₹3.5 L/yr - ₹9.5 L/yr

Safety Officer
77 salaries
unlock blur

₹2.4 L/yr - ₹6.1 L/yr

Assistant Engineer
54 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

Junior Engineer
45 salaries
unlock blur

₹2.4 L/yr - ₹4.3 L/yr

Senior Civil Engineer
43 salaries
unlock blur

₹4.5 L/yr - ₹10.1 L/yr

Explore more salaries
Compare Rohan Builders with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.2
Compare

Godrej Properties

3.6
Compare
write
Share an Interview