Premium Employer

i

This company page is being actively managed by Rohan Builders Team. If you also belong to the team, you can get access from here

Rohan Builders Verified Tick Work with us arrow

Compare button icon Compare button icon Compare

Filter interviews by

Rohan Builders Assistant Engineer Interview Questions and Answers

Updated 4 Aug 2023

Rohan Builders Assistant Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical and they were searching the leader in me.
  • Ans. Be confident and honestly show whatever you know.
  • Answered Anonymously
  • Q2. Where do you see you after 5 years.?
  • Ans. This answer should be yours from your combined mind and heart
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to do job in contractor construction company,you will difficulty find better than this

Interview Questionnaire 

2 Questions

  • Q1. Tecnical and pracital question ask in interview
  • Q2. Bbs and Productvity and quality and safty

Assistant Engineer Interview Questions Asked at Other Companies

Q1. How do we measure the slump of concrete during casting? Is there ... read more
Q2. Why do we take only 1 set of cube samples when casting concrete o ... read more
asked in Randstad
Q3. 1.Define the term capacitance & inductance 2.what is Rectifie ... read more
Q4. What is the 5S methodology, and why is it important in an industr ... read more
asked in TCE
Q5. What provisions do you check when designing a beam/column accordi ... read more

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Rohan Builders?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions about current working field, roles and responsibilities of current position
Round 3 - HR 

(1 Question)

  • Q1. Questions about personality,habbits and reason for change

Interview Preparation Tips

Interview preparation tips for other job seekers - Pls be be confident while answering the questions

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview

Senior Engineer Interview Questions & Answers

Sobha user image kailas kashiram sakpal

posted on 29 Nov 2021

I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. There are some 5-6 technical questions with safety & quality related 3-4 question

Interview Preparation Tips

Interview preparation tips for other job seekers - First was on site interview conducted by GM & PM
Second HR round with skill test of 25 marks - analytical questions
Third Vice VP Hr -regarding personal information
Fourth was VP - regarding personal infomational like family background & past experience about general work system

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Ans. 

    In my previous role, I led engineering projects, focusing on system optimization and team collaboration, leaving for career advancement.

    • Led a team of engineers to develop a new software application that improved processing speed by 30%.

    • Managed cross-functional projects, ensuring timely delivery and adherence to quality standards.

    • Implemented Agile methodologies, which increased team productivity and reduced project turn...

  • Answered by AI
  • Q2. What are the activities, you have handled
  • Ans. 

    I have managed diverse engineering projects, focusing on design, development, and team collaboration to deliver high-quality solutions.

    • Led a team of engineers in developing a scalable web application, improving performance by 30%.

    • Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.

    • Conducted code reviews and mentoring sessions, enhancing team skills and code quality.

    • Collaborated with c...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Asking mivan related,raft releted, sequence.
  • Q2. Previous company rols,etc

Rohan Builders Interview FAQs

How many rounds are there in Rohan Builders Assistant Engineer interview?
Rohan Builders interview process usually has 2 rounds. The most common rounds in the Rohan Builders interview process are Resume Shortlist and Technical.
How to prepare for Rohan Builders Assistant Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rohan Builders. The most common topics and skills that interviewers at Rohan Builders expect are Civil Engineering, Construction, Industrial Construction, Site Engineering and Billing Engineering.
What are the top questions asked in Rohan Builders Assistant Engineer interview?

Some of the top questions asked at the Rohan Builders Assistant Engineer interview -

  1. Technical and they were searching the leader in ...read more
  2. Tecnical and pracital question ask in intervi...read more
  3. Bbs and Productvity and quality and sa...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
Join Rohan Builders Great Living Engineered

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 147 Interviews
Kalpataru Limited Interview Questions
4.1
 • 141 Interviews
Lodha Group Interview Questions
4.0
 • 140 Interviews
Godrej Properties Interview Questions
3.6
 • 105 Interviews
DLF Interview Questions
3.9
 • 85 Interviews
Colliers India Interview Questions
3.9
 • 76 Interviews
Casagrand Interview Questions
3.8
 • 61 Interviews
View all
Rohan Builders Assistant Engineer Salary
based on 54 salaries
₹3.5 L/yr - ₹6.5 L/yr
24% more than the average Assistant Engineer Salary in India
View more details

Rohan Builders Assistant Engineer Reviews and Ratings

based on 19 reviews

4.0/5

Rating in categories

4.2

Skill development

3.2

Work-life balance

4.0

Salary

4.2

Job security

4.0

Company culture

3.7

Promotions

4.1

Work satisfaction

Explore 19 Reviews and Ratings
Assistant Engineer - Estimations

Nagaur,

Pune

5-7 Yrs

₹ 3.85-6.4 LPA

Explore more jobs
Senior Engineer
94 salaries
unlock blur

₹3.5 L/yr - ₹9.5 L/yr

Safety Officer
77 salaries
unlock blur

₹2.4 L/yr - ₹6.1 L/yr

Assistant Engineer
54 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

Junior Engineer
45 salaries
unlock blur

₹2.4 L/yr - ₹4.3 L/yr

Senior Civil Engineer
43 salaries
unlock blur

₹4.5 L/yr - ₹10.1 L/yr

Explore more salaries
Compare Rohan Builders with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.2
Compare

Godrej Properties

3.6
Compare
write
Share an Interview