7 Interview questions

A MEP Engineer was asked
Q. What is the difference between earthing and grounding?
Ans. 

Earthing and grounding are terms used interchangeably, but they have different meanings and applications.

  • Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.

  • Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.

  • Earthing is prim...

View all MEP Engineer interview questions
A MEP Engineer was asked
Q. Building SLD FROM HT PANEL TO METER ROOM
Ans. 

The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.

  • The SLD should include all the electrical components and their interconnections.

  • It should show the main HT panel, distribution boards, transformers, cables, and meters.

  • The SLD should indicate the ratings, sizes, and types of equipment used.

  • It should follow the electrical code and standards applicable to the project.

  • T...

View all MEP Engineer interview questions
A Site Engineer was asked
Q. What is the density of steel and cement?
Ans. 

The density of steel and cement varies depending on the type and composition.

  • The density of steel ranges from 7,750 to 8,050 kg/m³.

  • The density of cement ranges from 1,100 to 1,500 kg/m³.

  • Different types of steel and cement may have slightly different densities.

  • Density is an important property to consider in construction and engineering calculations.

View all Site Engineer interview questions
A Senior Engineer was asked
Q. Why curing done, how much carpentor can do work
Ans. 

Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.

  • Curing is done to remove moisture from the wood, preventing warping and cracking.

  • Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.

  • The amount of work a carpenter can do also depends on the complexity of the project and th...

View all Senior Engineer interview questions
A Planning Engineer was asked
Q. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP?...
Ans. 

Answering questions related to Planning Engineer role

  • Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper

  • Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration

  • To identify critical path on paper, draw a network diagram and calculate the earliest start and finish ...

View all Planning Engineer interview questions
A MEP Engineer was asked
Q. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
Ans. 

A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.

  • Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.

  • Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.

  • Fire fighting pipe install...

View all MEP Engineer interview questions
A Site Engineer was asked
Q. Cutting length of beam ring
Ans. 

Cutting length of beam ring is the length of steel required to form a complete ring around the beam.

  • The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.

  • The development length of the steel is the length required for the steel to fully bond with the concrete.

  • The cutting length of beam ring is important for determining the amount of steel ...

View all Site Engineer interview questions
Are these interview questions helpful?

SCON Projects Interview Experiences

6 interviews found

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 30 Aug 2021

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1.  Building SLD FROM HT PANEL TO METER ROOM
  • Ans. 

    The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.

    • The SLD should include all the electrical components and their interconnections.

    • It should show the main HT panel, distribution boards, transformers, cables, and meters.

    • The SLD should indicate the ratings, sizes, and types of equipment used.

    • It should follow the electrical code and standards applicable to the project.

    • The SL...

  • Answered by AI
  • Q2. Transformer testing and commissioning
  • Q3. Difference between earthing and grounding
  • Ans. 

    Earthing and grounding are terms used interchangeably, but they have different meanings and applications.

    • Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.

    • Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.

    • Earthing is primarily...

  • Answered by AI
  • Q4. 1bhk flat Load calculation
  • Q5. 1bhk ,2bhk 3bhk flat SLD
  • Q6. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
  • Ans. 

    A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.

    • Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.

    • Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.

    • Fire fighting pipe installation...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay clam and be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Nov 2024, where I was asked the following questions.

  • Q1. What is your qualification?
  • Ans. 

    I hold a Bachelor's degree in Civil Engineering, with a focus on structural design and project management.

    • Bachelor's degree in Civil Engineering from XYZ University.

    • Completed internships with ABC Construction Company, focusing on site management.

    • Participated in a capstone project designing a sustainable bridge.

    • Certified in AutoCAD and project management software.

  • Answered by AI
  • Q2. What are you doing during your practical sessions?
  • Ans. 

    During practical sessions, I engage in hands-on activities to apply theoretical knowledge in real-world civil engineering scenarios.

    • Conducting site surveys to understand topography and land features.

    • Using surveying equipment like theodolites and total stations for accurate measurements.

    • Participating in concrete mix design experiments to learn about material properties.

    • Assisting in the construction of small-scale models...

  • Answered by AI
  • Q3. What is the duration of the internship?
  • Ans. 

    The duration of an internship can vary, typically lasting from a few weeks to several months, depending on the program and organization.

    • Internships can range from 6 weeks to 6 months, depending on the company's requirements.

    • Some academic programs may require a 3-month internship as part of the curriculum.

    • Summer internships often last about 10-12 weeks, aligning with academic breaks.

    • Certain engineering firms offer year-...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Oct 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic information about yourself
Round 3 - Technical 

(1 Question)

  • Q1. Asked questions regy MEP services and installation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Basic technical questions Unit conversion Grade of Steel, Cement, concrete their proportion Types of Bricks, brickwork bonds, types of plaster Activity with sequences Quantification for simple example
  • Q2. Your Background, Location preference, Salary expectation
Round 3 - One-on-one 

(2 Questions)

  • Q1. More in depth technical questions regarding your job profile, with salary negotiation
  • Q2. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP...
  • Ans. 

    Answering questions related to Planning Engineer role

    • Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper

    • Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration

    • To identify critical path on paper, draw a network diagram and calculate the earliest start and finish times...

  • Answered by AI
Round 4 - One-on-one 

(1 Question)

  • Q1. Final round with management in which discuss about your Goals, your expectation out of this job, location preference and final salary negotiation.

Interview Preparation Tips

Topics to prepare for SCON Projects Planning Engineer interview:
  • Advanced Excel
  • AutoCAD
  • Project Management
  • Project Planning
  • Project Coordination
  • MS Project
  • Rate Analysis
  • Reconciliation
  • Billing
  • Cost monitoring
Interview preparation tips for other job seekers - Show your hunger and enthusiasm towards your job/work and then negotiate for salary and other facilities
Be flexible about your job location preference, and slightly rigid in terms of salary expectation.

Be sure to explain your extra skills and your proficiency and feel free to express your interest in terms of which department you want to work (management is very supportive).

After joining focus on your skill development rather than salary and after you prove yourself then discuss about your salary with PM or directly with management.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Salary in previous company
  • Q2. Why u leave a company
Round 2 - Technical 

(2 Questions)

  • Q1. Construction related quality questions
  • Q2. Why curing done, how much carpentor can do work
  • Ans. 

    Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.

    • Curing is done to remove moisture from the wood, preventing warping and cracking.

    • Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.

    • The amount of work a carpenter can do also depends on the complexity of the project and the ava...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give answer confidently

Site Engineer Interview Questions & Answers

user image Ganesh Ahirrao

posted on 26 Jul 2021

I applied via Walk-in and was interviewed before Jul 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is density of steel, cement?
  • Ans. 

    The density of steel and cement varies depending on the type and composition.

    • The density of steel ranges from 7,750 to 8,050 kg/m³.

    • The density of cement ranges from 1,100 to 1,500 kg/m³.

    • Different types of steel and cement may have slightly different densities.

    • Density is an important property to consider in construction and engineering calculations.

  • Answered by AI
  • Q2. Cutting length of beam ring
  • Ans. 

    Cutting length of beam ring is the length of steel required to form a complete ring around the beam.

    • The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.

    • The development length of the steel is the length required for the steel to fully bond with the concrete.

    • The cutting length of beam ring is important for determining the amount of steel requi...

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about SCON Projects?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed in Sep 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1.  Introduction ,Expectation ,Able to relocate, Past experience ,Flexibility ,Determined,Long lasting

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence
Are these interview questions helpful?

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How we define daviation of line and spotting of towers, major statuary clerance and their proposal and clearance proposals
  • Ans. 

    Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.

    • Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.

    • Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.

    • Major statutory clearance refers to the minimum distance required between power lines an...

  • Answered by AI
  • Q2. Where is your strengths of transmission line construction activity and why?
  • Ans. 

    My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.

    • Experience in managing large-scale transmission line construction projects

    • Expertise in ensuring adherence to safety standards and regulations

    • Ability to coordinate with cross-functional teams and stakeholders

    • Strong problem-solving and decision-making skills

    • Familiarity w...

  • Answered by AI
  • Q3. Why are you left your current employer

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask what you, dont give incomplete answer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Positives about you.
  • Ans. 

    I am a proactive problem-solver with strong technical skills and a collaborative mindset, dedicated to delivering high-quality results.

    • Strong technical expertise: I have over 10 years of experience in software development, specializing in scalable web applications.

    • Proactive problem-solving: In my last project, I identified a critical performance bottleneck and implemented a solution that improved load times by 30%.

    • Team...

  • Answered by AI
  • Q2. Why we need to hire you?
  • Ans. 

    I bring a unique blend of technical expertise, leadership skills, and a proven track record of delivering innovative solutions.

    • Extensive experience in software development, having led multiple successful projects that improved efficiency by over 30%.

    • Strong problem-solving skills demonstrated by resolving critical system issues under tight deadlines, ensuring minimal downtime.

    • Proven ability to mentor junior engineers, f...

  • Answered by AI

SCON Projects Interview FAQs

How many rounds are there in SCON Projects interview?
SCON Projects interview process usually has 3-4 rounds. The most common rounds in the SCON Projects interview process are Resume Shortlist, One-on-one Round and HR.
What are the top questions asked in SCON Projects interview?

Some of the top questions asked at the SCON Projects interview -

  1. Prepare a small given example site schedule with sequencing and duration determ...read more
  2. Work method statement of slab conduiting, Plumbing pipe installation, Fire Figh...read more
  3. Difference between earthing and groundi...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.8/5

based on 11 interview experiences

Difficulty level

Easy 20%
Moderate 80%

Duration

Less than 2 weeks 100%
View more

SCON Projects Reviews and Ratings

based on 155 reviews

4.5/5

Rating in categories

4.2

Skill development

3.9

Work-life balance

4.4

Salary

4.5

Job security

4.4

Company culture

4.2

Promotions

4.0

Work satisfaction

Explore 155 Reviews and Ratings
Planning Engineer
35 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Safety Officer
34 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Senior Engineer
22 salaries
unlock blur

₹4 L/yr - ₹7 L/yr

Junior Engineer
19 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Junior Engineer Civil
18 salaries
unlock blur

₹1.2 L/yr - ₹3.6 L/yr

Explore more salaries
Compare SCON Projects with

Lea Associates South Asia

4.3
Compare

ABCI Infrastructures

3.4
Compare

VIKRAN Engineering & Exim

4.0
Compare

The Louis Berger Group

4.3
Compare
write
Share an Interview