Earthing and grounding are terms used interchangeably, but they have different meanings and applications.
Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.
Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.
Earthing is prim...
The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.
The SLD should include all the electrical components and their interconnections.
It should show the main HT panel, distribution boards, transformers, cables, and meters.
The SLD should indicate the ratings, sizes, and types of equipment used.
It should follow the electrical code and standards applicable to the project.
T...
The density of steel and cement varies depending on the type and composition.
The density of steel ranges from 7,750 to 8,050 kg/m³.
The density of cement ranges from 1,100 to 1,500 kg/m³.
Different types of steel and cement may have slightly different densities.
Density is an important property to consider in construction and engineering calculations.
Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.
Curing is done to remove moisture from the wood, preventing warping and cracking.
Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.
The amount of work a carpenter can do also depends on the complexity of the project and th...
Answering questions related to Planning Engineer role
Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper
Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration
To identify critical path on paper, draw a network diagram and calculate the earliest start and finish ...
A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.
Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.
Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.
Fire fighting pipe install...
Cutting length of beam ring is the length of steel required to form a complete ring around the beam.
The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.
The development length of the steel is the length required for the steel to fully bond with the concrete.
The cutting length of beam ring is important for determining the amount of steel ...
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.
The SLD should include all the electrical components and their interconnections.
It should show the main HT panel, distribution boards, transformers, cables, and meters.
The SLD should indicate the ratings, sizes, and types of equipment used.
It should follow the electrical code and standards applicable to the project.
The SL...
Earthing and grounding are terms used interchangeably, but they have different meanings and applications.
Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.
Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.
Earthing is primarily...
A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.
Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.
Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.
Fire fighting pipe installation...
I appeared for an interview in Nov 2024, where I was asked the following questions.
I hold a Bachelor's degree in Civil Engineering, with a focus on structural design and project management.
Bachelor's degree in Civil Engineering from XYZ University.
Completed internships with ABC Construction Company, focusing on site management.
Participated in a capstone project designing a sustainable bridge.
Certified in AutoCAD and project management software.
During practical sessions, I engage in hands-on activities to apply theoretical knowledge in real-world civil engineering scenarios.
Conducting site surveys to understand topography and land features.
Using surveying equipment like theodolites and total stations for accurate measurements.
Participating in concrete mix design experiments to learn about material properties.
Assisting in the construction of small-scale models...
The duration of an internship can vary, typically lasting from a few weeks to several months, depending on the program and organization.
Internships can range from 6 weeks to 6 months, depending on the company's requirements.
Some academic programs may require a 3-month internship as part of the curriculum.
Summer internships often last about 10-12 weeks, aligning with academic breaks.
Certain engineering firms offer year-...
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.
Answering questions related to Planning Engineer role
Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper
Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration
To identify critical path on paper, draw a network diagram and calculate the earliest start and finish times...
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.
Curing is done to remove moisture from the wood, preventing warping and cracking.
Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.
The amount of work a carpenter can do also depends on the complexity of the project and the ava...
I applied via Walk-in and was interviewed before Jul 2020. There was 1 interview round.
The density of steel and cement varies depending on the type and composition.
The density of steel ranges from 7,750 to 8,050 kg/m³.
The density of cement ranges from 1,100 to 1,500 kg/m³.
Different types of steel and cement may have slightly different densities.
Density is an important property to consider in construction and engineering calculations.
Cutting length of beam ring is the length of steel required to form a complete ring around the beam.
The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.
The development length of the steel is the length required for the steel to fully bond with the concrete.
The cutting length of beam ring is important for determining the amount of steel requi...
Top trending discussions
posted on 21 Mar 2021
I applied via Referral and was interviewed in Sep 2020. There were 5 interview rounds.
posted on 12 Oct 2021
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 30 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
I am a proactive problem-solver with strong technical skills and a collaborative mindset, dedicated to delivering high-quality results.
Strong technical expertise: I have over 10 years of experience in software development, specializing in scalable web applications.
Proactive problem-solving: In my last project, I identified a critical performance bottleneck and implemented a solution that improved load times by 30%.
Team...
I bring a unique blend of technical expertise, leadership skills, and a proven track record of delivering innovative solutions.
Extensive experience in software development, having led multiple successful projects that improved efficiency by over 30%.
Strong problem-solving skills demonstrated by resolving critical system issues under tight deadlines, ensuring minimal downtime.
Proven ability to mentor junior engineers, f...
based on 11 interview experiences
Difficulty level
Duration
based on 155 reviews
Rating in categories
Planning Engineer
35
salaries
| ₹3 L/yr - ₹9 L/yr |
Safety Officer
34
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Senior Engineer
22
salaries
| ₹4 L/yr - ₹7 L/yr |
Junior Engineer
19
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Junior Engineer Civil
18
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
Lea Associates South Asia
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group