I am open to both contract and third-party payroll options, depending on the project's needs and my career goals.
Contract work often provides flexibility and higher pay rates, suitable for short-term projects.
Third-party payroll can offer stability and benefits, which may be advantageous for long-term employment.
For example, if a project requires specialized skills for a limited time, a contract role may be ideal.
...
Hazardous area classification is the process of identifying and categorizing areas where explosive atmospheres may occur.
Hazardous areas are classified based on the likelihood of an explosive atmosphere occurring and the duration of its presence.
There are three main factors that contribute to the formation of an explosive atmosphere: the presence of a flammable substance, oxygen, and an ignition source.
The classif...
Project control requirement documents include plans, procedures, and guidelines for managing and monitoring project activities.
Project management plan
Quality management plan
Risk management plan
Change management plan
Configuration management plan
Project procedures and guidelines
The question asks about the code for mode of measurement, types of joints in flooring, and previous projects and estimation preparation.
The code for mode of measurement refers to the standard method used to measure quantities in construction projects.
Types of joints in flooring include butt joints, tongue and groove joints, and expansion joints.
Previous projects can include residential buildings, commercial comple...
Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.
Identify needs and requirements
Research and select potential suppliers
Negotiate terms and conditions
Create and sign contracts
Manage supplier relationships and performance
Monitor and evaluate procurement process effectiveness
Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.
Communicate openly and honestly with colleagues and superiors
Respect confidentiality and avoid gossip or spreading rumors
Follow through on commitments and hold yourself accountable
Act with fairness and impartiality in decision-making
Admit mistakes and take responsibility for correcting them
Lead by example...
Pipe support spans are crucial for the safe and efficient operation of piping systems.
Pipe support spans must be designed to prevent excessive deflection and stress on the piping system.
Compressor supports must be designed to handle the weight and vibration of the compressor.
Loops on the pipe rack are used to accommodate thermal expansion and contraction of the piping system.
Proper pipe support design can prevent ...
Safety valve selection criteria
The type of fluid or gas being handled
The pressure and temperature of the system
The flow rate and capacity of the valve
The set pressure and blowdown requirements
The material compatibility with the process fluid
The valve's reliability and maintenance requirements
Line sizing criteria is the process of selecting the appropriate diameter for a pipeline based on various factors.
Line sizing criteria is based on factors such as flow rate, pressure drop, fluid properties, and velocity limitations.
The selected diameter should ensure that the pressure drop is within acceptable limits and the fluid velocity is not too high or too low.
The type of fluid being transported also plays a...
Project workflow involves planning, execution, monitoring, and control of project activities.
Project initiation and planning
Project execution and monitoring
Project control and closure
Regular communication and collaboration with team members
Risk management and mitigation
Quality assurance and control
Resource allocation and management
I appeared for an interview in Nov 2024.
I have 5 years of experience in the army.
Served in the army for 5 years
Received training in various military operations
Developed leadership and organizational skills
Worked in a team-oriented environment
I have a good understanding of politics and stay updated on current events and policies.
I have a degree in Political Science which has provided me with a strong foundation in political theory and governance.
I actively follow political news and developments, both domestically and internationally.
I have experience working in government offices where I had to navigate political processes and policies.
I have participated i...
I appeared for an interview in Aug 2024.
Line sizing criteria include flow rate, pressure drop, velocity, material compatibility, and safety factors.
Flow rate: Determine the maximum flow rate the line needs to handle.
Pressure drop: Calculate the pressure drop along the line to ensure proper operation.
Velocity: Select a velocity range to prevent erosion or excessive noise.
Material compatibility: Choose materials that are compatible with the process fluid.
Safet...
Pump sizing calculations involve determining the required pump flow rate, head, and power consumption based on system requirements.
Determine the required flow rate for the system
Calculate the total head required to overcome system resistance
Select a pump that can deliver the required flow rate at the calculated head
Calculate the power consumption of the selected pump
Consider factors such as efficiency, NPSH, and safety...
NPSH is the measure of the pressure available to prevent cavitation in a pump.
NPSH is the difference between the pressure at the pump suction and the vapor pressure of the liquid being pumped.
It is important to ensure that NPSH is greater than the NPSH required by the pump to avoid cavitation.
Factors affecting NPSH include pump design, fluid properties, and operating conditions.
NPSH can be calculated using specific for...
I want to join Toyo because of its reputation for innovation and commitment to excellence in the field of engineering.
Toyo has a strong reputation for innovation and cutting-edge technology
I am impressed by Toyo's commitment to excellence and continuous improvement
I believe that working at Toyo will provide me with valuable opportunities for professional growth and development
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
Work experience
Reason of leaving job
How do you came to know about this recruitment and any reference from this company
Any third languaged known
Explained about the company policy and requirements they are looking for candidates
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
1) It is a home based online Aptitude Test.
2) The entire duration of the Aptitude Test is one hour forty minutes.
3) Out of one hour forty minutes, first fifty minutes are allocated to the General Aptitude Test which consists of very basic but time consuming mathematical sums, logical reasoning and grammar/vocabulary questions.
4) Once fifty minutes pass, the General Aptitude Test automatically closes and the Technical Aptitude Test begins.
5) The Technical Aptitude Test consists of topics primarily related to Mechanical Engineering concepts such as Strength of Materials, Thermodynamics, Fluid Mechanics, Engineering Mechanics, Thermal Engineering.
6) Most of the questions asked in the Technical Aptitude were straight forward theoretical questions.
7) Both the General and Technical Aptitude tests have multiple choice questions and no negative marking.
Boring enlarges existing holes while reaming improves the surface finish and accuracy of holes.
Boring is used to enlarge existing holes to a specific diameter, while reaming is used to improve the surface finish and accuracy of holes.
Boring is typically done before reaming in the machining process.
Boring is usually done using a single-point cutting tool, while reaming is done using a multi-edge cutting tool.
Examples: B...
Yes, I have experience using E3D software for designing and modeling mechanical components.
I have used E3D software extensively during my internship at XYZ Engineering firm
I have created 3D models of various mechanical components using E3D software
I am familiar with the features and tools of E3D software for efficient design and analysis
Basic scenario based questions
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
The duration of Toyo Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 57 interview experiences
Difficulty level
Duration
based on 681 reviews
Rating in categories
Piping Engineer
113
salaries
| ₹6 L/yr - ₹14.1 L/yr |
Project Engineer
95
salaries
| ₹6.3 L/yr - ₹16.4 L/yr |
Senior Engineer
92
salaries
| ₹17.7 L/yr - ₹32 L/yr |
Senior Assistant Engineer
86
salaries
| ₹7.6 L/yr - ₹13.5 L/yr |
Assistant Engineer
82
salaries
| ₹6 L/yr - ₹13 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech