i
Afcons
Infrastructure
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
Mapping in CHI involves creating spatial representations of geotechnical data for analysis and decision-making.
Utilizes Geographic Information Systems (GIS) to visualize subsurface conditions.
Helps in identifying soil types, rock formations, and groundwater levels.
Facilitates risk assessment for construction projects by mapping potential hazards.
Example: Mapping landslide-prone areas to inform infrastructure plann...
I oversaw construction, ensured safety compliance, and coordinated teams for the tunnel project, enhancing efficiency and quality.
Managed daily operations, ensuring project milestones were met on time.
Implemented safety protocols, reducing incidents by 30%.
Coordinated with engineers and contractors to resolve design issues promptly.
Conducted regular site inspections to maintain quality standards.
Facilitated commun...
NATM stands for New Austrian Tunneling Method, a technique used in underground construction and tunneling projects.
NATM emphasizes the use of the surrounding rock mass for support.
It involves continuous monitoring of ground conditions during excavation.
Commonly used in soft ground conditions, such as clay or silt.
Example: The Gotthard Base Tunnel in Switzerland utilized NATM techniques.
Hydraulic pump design involves calculations for flow rate, pressure, efficiency, and power requirements.
Flow Rate Calculation: Q = A × v, where Q is flow rate, A is cross-sectional area, and v is velocity.
Pressure Calculation: P = F/A, where P is pressure, F is force, and A is area. Example: Calculate pressure needed to lift a load.
Power Requirement: P = Q × ΔP, where P is power, Q is flow rate, and ΔP is pressure...
HAZOP is a structured technique to identify hazards and operability issues in process systems through team brainstorming.
Assemble a multidisciplinary team with expertise in the process.
Define the scope of the study, including the system boundaries and objectives.
Identify key nodes or sections of the process to analyze.
Use guide words (e.g., 'No', 'More', 'Less') to prompt discussions on potential deviations.
Evalua...
Sizing PSVs involves calculating the required flow rate and selecting the appropriate valve based on system parameters.
Determine the set pressure and the maximum allowable working pressure (MAWP) of the system.
Calculate the required flow rate using the formula: Q = A * V, where Q is flow rate, A is valve area, and V is velocity.
Consider the type of fluid (gas, liquid, or vapor) and its properties (density, viscosi...
AC motor starters control the starting current and torque, protecting the motor from damage during startup.
Direct-On-Line (DOL) Starter: Simple and cost-effective, used for small motors.
Star-Delta Starter: Reduces starting current, suitable for larger motors.
Auto Transformer Starter: Provides variable voltage for smooth starting.
Soft Starter: Gradually increases voltage, reducing mechanical stress.
Variable Frequen...
Power supplies are classified based on voltage levels: low, medium, high, and extra-high voltage for various applications.
Low Voltage: Typically up to 1 kV, used in residential and commercial applications (e.g., 230V AC supply).
Medium Voltage: Ranges from 1 kV to 35 kV, used in industrial settings and for distribution networks.
High Voltage: Ranges from 35 kV to 230 kV, used for long-distance transmission of electr...
In challenging situations, I prioritize communication, collaboration, and problem-solving to ensure smooth progress.
Assess the situation: Identify the root cause of the issue, such as resource shortages or team conflicts.
Communicate openly: Hold a team meeting to discuss the challenges and gather input from all members.
Develop a plan: Create a step-by-step action plan to address the issues, assigning specific task...
An erection schedule outlines the sequence and timing of lifting operations to ensure safety and efficiency during construction.
Assess site conditions: Evaluate ground stability and weather forecasts to determine lifting feasibility.
Sequence of lifts: Plan the order of lifting operations to avoid conflicts and ensure structural integrity.
Equipment availability: Ensure cranes and other lifting equipment are schedul...
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
Fire is a chemical reaction that releases heat, light, and various gases.
Fire is a rapid oxidation process that occurs when fuel (such as wood, paper, or gasoline) combines with oxygen and heat.
It produces flames, smoke, and heat that can be dangerous to people and property.
Fire can be caused by various sources, including electrical faults, cooking accidents, and arson.
Preventing fires and knowing how to respond to the...
Safety refers to the condition of being protected from harm, injury, or danger.
Safety involves identifying and assessing potential hazards
Implementing measures to control or eliminate those hazards
Training employees on safe work practices
Regularly reviewing and updating safety policies and procedures
Examples of safety measures include wearing personal protective equipment, using safety equipment, and following establis...
A hazard is anything that has the potential to cause harm or injury to people, property, or the environment.
Hazard can be physical, chemical, biological, or environmental
Examples of hazards include fire, toxic chemicals, infectious diseases, and natural disasters
Hazards can be identified through risk assessments and safety inspections
Preventative measures can be taken to mitigate or eliminate hazards
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance of buildings or other structures.
Scaffolding is typically made of metal or wood and consists of platforms, braces, and supports.
It is used to provide a safe working platform for workers at heights.
Scaffolding must be erected and dismantled by trained professionals to ensure safety.
Examples of scaffolding includ...
I appeared for an interview in May 2025, where I was asked the following questions.
Overview of Tunnel Boring Machines, their maintenance, and safety measures in engineering projects.
TBMs use a rotating cutter head to excavate soil and rock, transporting material via a conveyor system.
Common hydraulic failures include leaks in hoses, pump malfunctions, and pressure loss due to blockages.
Preventive maintenance involves regular inspections, lubrication, and replacing worn parts to avoid breakdowns.
Thrus...
Aspiring Junior Mechanical Engineer eager to contribute to Afcons Infrastructure Ltd with strong problem-solving skills and a passion for innovation.
I graduated with a degree in Mechanical Engineering from XYZ University, where I developed a solid foundation in thermodynamics and fluid mechanics.
I am particularly drawn to Afcons Infrastructure Ltd because of its reputation for innovative infrastructure projects and com...
I appeared for an interview in Jan 2025.
SPI, CPI, cost variance, and schedule variance are key performance indicators used in project management to measure project performance.
SPI (Schedule Performance Index) measures the efficiency of schedule performance. SPI = EV / PV. A value greater than 1 indicates ahead of schedule, less than 1 behind schedule.
CPI (Cost Performance Index) measures the efficiency of cost performance. CPI = EV / AC. A value greater than...
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
Currently working on implementing a new data analytics platform to improve reporting efficiency.
Identifying key requirements for the new platform
Developing a project plan with timelines and milestones
Collaborating with IT team to ensure smooth implementation
Testing and refining the platform before full deployment
Experienced MIS Manager with a background in data analysis and system optimization.
Over 5 years of experience in managing MIS systems
Skilled in data analysis and reporting tools such as SQL, Excel, and Tableau
Implemented process improvements resulting in 20% increase in efficiency
Led a team of analysts to successfully implement a new CRM system
I changed organizations quickly to pursue new opportunities for growth and development.
Opportunity for career advancement
Desire for new challenges
Better work-life balance
Company restructuring or downsizing
Relocation to a new city
Yes, I am willing to work in a remote location as long as the necessary resources are provided.
I am comfortable with remote work and have experience managing teams remotely.
I have a dedicated home office setup with reliable internet connection.
I am open to occasional travel for meetings or training sessions.
I am familiar with using collaboration tools like Slack, Zoom, and Trello for remote work.
I understand the import...
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I bring extensive experience, technical expertise, and a collaborative approach to enhance project outcomes in engineering geology.
Proven track record in geotechnical investigations, leading to successful project completions, such as the XYZ Bridge project.
Strong analytical skills, demonstrated by my ability to assess complex geological data and provide actionable insights.
Effective communication and teamwork, as evide...
posted on 1 Aug 2025
Mapping in CHI involves creating spatial representations of geotechnical data for analysis and decision-making.
Utilizes Geographic Information Systems (GIS) to visualize subsurface conditions.
Helps in identifying soil types, rock formations, and groundwater levels.
Facilitates risk assessment for construction projects by mapping potential hazards.
Example: Mapping landslide-prone areas to inform infrastructure planning.
I appeared for an interview in May 2025, where I was asked the following questions.
I prioritize tasks, utilize project management tools, and collaborate with team members to ensure timely and efficient completion of work.
Set clear goals and deadlines for each project phase, such as completing initial designs within two weeks.
Use project management software like MS Project or Trello to track progress and manage resources effectively.
Conduct regular team meetings to discuss challenges and share updates...
I plan to complete my work through structured planning, effective communication, and continuous monitoring of project progress.
Develop a detailed project plan outlining tasks, timelines, and resources needed.
Utilize project management software to track progress and adjust schedules as necessary.
Conduct regular team meetings to ensure everyone is aligned and address any challenges.
Implement quality control measures at e...
As a Civil Structural Engineer, I oversee design, analysis, and project management to ensure safe and efficient structures.
Conduct structural analysis to determine load-bearing capacities and material strengths.
Design structures such as bridges and buildings, ensuring compliance with safety codes.
Collaborate with architects and other engineers to integrate structural elements into overall designs.
Prepare detailed const...
I appeared for an interview in May 2025, where I was asked the following questions.
Planning is the process of setting goals, determining actions to achieve those goals, and allocating resources to accomplish the goals.
Setting goals and objectives
Identifying actions and tasks needed to achieve the goals
Allocating resources such as time, money, and manpower
Creating schedules and timelines
Monitoring progress and making adjustments as needed
During my internship, I assisted in creating project schedules, tracking progress, and analyzing delays.
Assisted in creating project schedules using software like Primavera P6
Tracked progress by updating Gantt charts and critical path analysis
Analyzed delays by identifying causes and proposing mitigation strategies
Top trending discussions
The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 238 interview experiences
Difficulty level
Duration
based on 2.7k reviews
Rating in categories
Senior Engineer
417
salaries
| ₹7.6 L/yr - ₹13.2 L/yr |
Assistant Manager
209
salaries
| ₹9 L/yr - ₹14.2 L/yr |
Planning Engineer
203
salaries
| ₹4.8 L/yr - ₹10 L/yr |
Civil Engineer
192
salaries
| ₹3.5 L/yr - ₹8.4 L/yr |
Executive Engineer
179
salaries
| ₹4.7 L/yr - ₹10 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company