i
G R
Infraprojects
Filter interviews by
Code for stressing
Use stress testing techniques to identify the maximum load a system can handle
Implement code that generates high levels of concurrent requests
Measure response times and resource utilization under stress conditions
Analyze the system's behavior and identify bottlenecks or performance issues
The IS code for bearing is IS 11592:1985.
IS 11592:1985 is the Indian Standard code for selection and design of belt conveyors.
It provides guidelines for the selection and design of belt conveyors used in mines and other industries.
The code covers various aspects such as belt width, speed, power requirements, material characteristics, etc.
It ensures the safe and efficient operation of belt conveyors.
Compliance with...
Balancing cost control and fulfilling requirements is crucial in purchasing to ensure quality and efficiency.
Prioritize quality: Ensuring materials meet specifications can prevent costly rework or failures. For example, sourcing high-grade steel for construction.
Evaluate total cost of ownership: Consider long-term costs, not just purchase price. For instance, a cheaper supplier may have higher shipping costs.
Suppl...
Physical verification ensures inventory accuracy, while SAP provides real-time data management and reporting.
Physical verification involves counting and inspecting stock on hand to ensure it matches records.
SAP allows for real-time tracking of inventory levels, reducing discrepancies.
Example: A physical count may reveal 100 units of an item, while SAP shows 90 due to data entry errors.
Physical verification is typi...
The number of beam lapping zones depends on the specific design and requirements of the project.
Beam lapping zones are typically determined based on structural requirements and load distribution.
The number of beam zones can vary based on factors such as beam size, material, and span length.
Consulting structural engineers and design specifications can help determine the appropriate number of beam lapping zones.
Overlap is the area where two VDF flooring sections meet, while confined zone is the area where the VDF flooring is contained during casting process.
Overlap is the junction between two VDF flooring sections, ensuring seamless connection.
Confined zone is the area where VDF flooring is poured and contained during casting process.
Properly managing overlap and confined zone is crucial for a successful VDF flooring ins...
To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.
Calculate daily production target by dividing total volume by number of working days in a year
Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed
Consider factors like downtime, maintenance, and transportation in your planning
Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.
Types of piles include driven piles, bored piles, and screw piles.
Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.
The diameter of a pile is determined based on the load it needs to support and the soil conditions.
LVUP (...
Project cost, bbs, agreement clause, critical activities, total float are key aspects of project planning and management.
Project cost refers to the total expenses incurred in completing a project.
BBS (Bill of Quantities) is a document used in construction projects to itemize the materials, parts, and labor required.
Agreement clause outlines the terms and conditions agreed upon by all parties involved in the projec...
I have extensive experience implementing and enforcing safety protocols on construction sites.
Implemented daily safety briefings for all workers
Enforced proper use of personal protective equipment (PPE)
Conducted regular safety inspections and audits
Developed emergency response plans and conducted drills
Trained workers on safe work practices and procedures
Electrical maintenance involves regular inspections, repairs, and upgrades to ensure safe and efficient electrical systems.
Routine inspections to identify wear and tear, such as checking circuit breakers and wiring.
Testing and replacing faulty components, like light fixtures or outlets.
Upgrading systems to meet current codes, for example, installing GFCI outlets in wet areas.
Performing preventive maintenance to avoid f...
Work related questions
I have a strong background in railway OHE engineering with experience in design, installation, and maintenance.
Experience in designing overhead electrification systems for railways
Knowledge of installation procedures and safety regulations
Experience in maintenance and troubleshooting of OHE systems
Familiarity with relevant software and tools such as AutoCAD and PLS-CADD
Strong understanding of electrical engineering pri...
I appeared for an interview in Jan 2025.
The number of beam lapping zones depends on the specific design and requirements of the project.
Beam lapping zones are typically determined based on structural requirements and load distribution.
The number of beam zones can vary based on factors such as beam size, material, and span length.
Consulting structural engineers and design specifications can help determine the appropriate number of beam lapping zones.
Overlap is the area where two VDF flooring sections meet, while confined zone is the area where the VDF flooring is contained during casting process.
Overlap is the junction between two VDF flooring sections, ensuring seamless connection.
Confined zone is the area where VDF flooring is poured and contained during casting process.
Properly managing overlap and confined zone is crucial for a successful VDF flooring installa...
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I appeared for an interview in May 2025, where I was asked the following questions.
AI tools include frameworks, libraries, and platforms that facilitate machine learning, data analysis, and natural language processing.
TensorFlow: An open-source library for machine learning and deep learning applications.
PyTorch: A flexible deep learning framework popular for research and production.
Scikit-learn: A library for classical machine learning algorithms in Python.
Keras: A high-level neural networks API that...
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
EOT proposal is a request for an extension of time in a construction project due to delays beyond the contractor's control.
EOT stands for Extension of Time.
It is a formal request made by the contractor to the client or project owner.
The request is usually accompanied by supporting documentation such as delay analysis reports, weather reports, and other relevant evidence.
EOT proposals are typically reviewed by the proje...
To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.
Calculate daily production target by dividing total volume by number of working days in a year
Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed
Consider factors like downtime, maintenance, and transportation in your planning
I appeared for an interview in Mar 2025, where I was asked the following questions.
I prioritize safety through proper training, risk assessment, and adherence to protocols in all engineering tasks.
Conduct regular safety training sessions for all team members to ensure everyone is aware of potential hazards.
Implement a risk assessment process before starting any project to identify and mitigate risks.
Use personal protective equipment (PPE) such as helmets, gloves, and goggles when working in hazardous...
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the G R Infraprojects interview -
The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 170 interview experiences
Difficulty level
Duration
based on 1.6k reviews
Rating in categories
4-5 Yrs
Not Disclosed
8-10 Yrs
₹ 4.9-11.5 LPA
Assistant Manager
402
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
226
salaries
| ₹3.7 L/yr - ₹8.6 L/yr |
Deputy Manager
152
salaries
| ₹6.6 L/yr - ₹16.9 L/yr |
Engineer
138
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Structural Engineer
114
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures