Upload Button Icon Add office photos

RPP Infra Projects

Compare button icon Compare button icon Compare

Filter interviews by

RPP Infra Projects Interview Questions and Answers

Updated 3 Jun 2025
Popular Designations

13 Interview questions

A Quantity Surveyor was asked 8mo ago
Q. Calculating Bbs for column
Ans. 

Calculating BBS for columns involves determining the quantity and spacing of reinforcement bars.

  • Calculate the total length of reinforcement bars required for the column

  • Determine the spacing between the bars based on design requirements

  • Consider the diameter and spacing of the bars to ensure proper structural integrity

  • Use software or manual calculations to determine the BBS accurately

View all Quantity Surveyor interview questions
A Quantity Surveyor was asked 8mo ago
Q. What is the difference between design mix and standard mix concrete?
Ans. 

Design mix concrete is prepared as per the mix design provided by a structural engineer, while standard mix concrete follows a standard ratio of ingredients.

  • Design mix concrete is customized based on specific project requirements and strength criteria.

  • Standard mix concrete follows a fixed ratio of cement, sand, and aggregates, such as 1:2:4.

  • Design mix concrete may require testing and adjustments to achieve desired...

View all Quantity Surveyor interview questions
A Site Engineer was asked
Q. What is your knowledge of drainage construction?
Ans. 

Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.

  • Understanding of drainage systems and their components

  • Knowledge of local regulations and standards for drainage design

  • Ability to calculate drainage capacity and slope requirements

  • Experience in designing and implementing drainage solutions

  • Familiarity with different types of drainage materials and their p...

View all Site Engineer interview questions
An Engineer Civil Engineer was asked
Q. How can getting salary privies company? What are your salary expectations?
Ans. 

The question is unclear and does not make sense.

  • The question seems to be asking about how to negotiate a higher salary with a previous company.

  • It is important to research industry standards and salary ranges for the position.

  • Highlighting relevant experience, skills, and achievements can help justify a higher salary.

  • Negotiating with confidence and being prepared to provide reasons for the requested salary increase ...

View all Engineer Civil Engineer interview questions
An Engineer Civil Engineer was asked
Q. What type of structure will you handle in a road project?
Ans. 

Various types of structures are handled in road projects, including bridges, tunnels, culverts, and retaining walls.

  • Bridges: Overpasses, flyovers, and interchanges are common structures in road projects.

  • Tunnels: Road tunnels are constructed to pass through mountains or under bodies of water.

  • Culverts: These structures allow water to flow under the road, preventing flooding.

  • Retaining walls: Used to support soil and ...

View all Engineer Civil Engineer interview questions
A Civil Site Engineer was asked
Q. What does MSL mean?
Ans. 

MSL stands for Mean Sea Level.

  • MSL is the average height of the sea surface measured over a period of time.

  • It is used as a reference point for measuring elevations and depths.

  • It is important in civil engineering for designing structures near water bodies.

  • For example, the height of a bridge or a dam is measured from MSL.

  • MSL can vary due to factors such as tides, currents, and weather conditions.

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked
Q. What is SD
Ans. 

SD stands for Standard Deviation.

  • SD is a measure of the amount of variation or dispersion of a set of values.

  • It is calculated as the square root of the variance.

  • It is commonly used in statistics and probability theory.

  • For example, if the SD of a test score is 10, it means that most scores are within 10 points of the average score.

  • A low SD indicates that the data points are close to the mean, while a high SD indica...

View all Civil Site Engineer interview questions
Are these interview questions helpful?
A Smart City was asked
Q. What are the unit weights of steel for all diameters?
Ans. 

Steel unit weight varies with diameter.

  • The unit weight of steel varies with the diameter of the steel.

  • The weight of steel can be calculated using the formula: weight = volume x density.

  • The density of steel is approximately 7850 kg/m³.

  • The weight of a steel rod with a diameter of 10mm and a length of 1 meter is approximately 0.785 kg.

  • The weight of a steel rod with a diameter of 20mm and a length of 1 meter is approx...

View all Smart City interview questions
A Civil Engineer was asked
Q. Size of Bricks,available of cement names in market
Ans. 

Brick sizes vary and cement brands are numerous in the market.

  • Brick sizes commonly range from 8 to 12 inches in length and 4 to 6 inches in width.

  • Cement brands available in the market include Ultratech, ACC, Ambuja, and JK Cement.

  • The size of bricks and the type of cement used depend on the specific requirements of the project.

  • The strength and durability of the structure also play a role in determining the size of ...

View all Civil Engineer interview questions
A Quantity Surveyor was asked 8mo ago
Q. Mix ratios of concrete
Ans. 

Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.

  • Mix ratios are typically expressed as a series of numbers representing the amount of each ingredient in the mix.

  • For example, a common mix ratio for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.

  • The mix ratio can vary depending on the strength and durability requirements of the c...

View all Quantity Surveyor interview questions

RPP Infra Projects Interview Experiences

18 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 15 Apr 2023

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How many year experience
  • Q2. What about drainage contraction knowledge
  • Ans. 

    Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.

    • Understanding of drainage systems and their components

    • Knowledge of local regulations and standards for drainage design

    • Ability to calculate drainage capacity and slope requirements

    • Experience in designing and implementing drainage solutions

    • Familiarity with different types of drainage materials and their proper...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Excavation
  • Concrete
  • Shuttering
  • Steel
Interview preparation tips for other job seekers - Make it last option.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. What you learn in your work experience, I replied BBS. They also asked dimensions of staircase,
  • Q2. Materials units, design mix, labor productivity in day.
  • Q3. Prepare bmc, ct, rcc , estimation , survey basic interview questions

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare all basic interview questions of rcc, ct , bmc and qc and survey.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Calculating Bbs for column
  • Ans. 

    Calculating BBS for columns involves determining the quantity and spacing of reinforcement bars.

    • Calculate the total length of reinforcement bars required for the column

    • Determine the spacing between the bars based on design requirements

    • Consider the diameter and spacing of the bars to ensure proper structural integrity

    • Use software or manual calculations to determine the BBS accurately

  • Answered by AI
  • Q2. Mix ratios of concrete
  • Ans. 

    Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.

    • Mix ratios are typically expressed as a series of numbers representing the amount of each ingredient in the mix.

    • For example, a common mix ratio for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.

    • The mix ratio can vary depending on the strength and durability requirements of the concre...

  • Answered by AI
  • Q3. Difference between design mix and std mix concrete
  • Ans. 

    Design mix concrete is prepared as per the mix design provided by a structural engineer, while standard mix concrete follows a standard ratio of ingredients.

    • Design mix concrete is customized based on specific project requirements and strength criteria.

    • Standard mix concrete follows a fixed ratio of cement, sand, and aggregates, such as 1:2:4.

    • Design mix concrete may require testing and adjustments to achieve desired prop...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Electrician & mechanical engineering services working
  • Q2. Work on the question
Round 2 - Technical 

(2 Questions)

  • Q1. Electrician work
  • Q2. Maintenance questions

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Aug 2022

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of d...
  • Ans. 

    Sample interview questions for Site Engineer position

    • BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications

    • Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase

    • Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement

    • Full form of TMT ...

  • Answered by AI
  • Q2. 1.introduction your self 2.Why you choose civil engineering? 3.whats ur salary expections? 4.Why u leave previous company?

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Civil Engineering
  • Concrete technology
  • Bmc
  • Quantity Surveyor Activities
Interview preparation tips for other job seekers - Prepare properly and crack interview because not hard question. Firstly 50 marks question paper provide and give you 30 minutes and after getting more than 25 then personal interview.

I applied via Campus Placement and was interviewed in Aug 2022. There were 5 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How can find out sq length to sk length of culvert
  • Ans. 

    To find out the square length to skew length of a culvert, you can use trigonometry and geometry principles.

    • Use the Pythagorean theorem to find the square length of the culvert

    • Measure the skew length of the culvert using a measuring tape or surveying equipment

    • Divide the square length by the skew length to obtain the ratio

  • Answered by AI
  • Q2. What type of structure well handle in road project
  • Ans. 

    Various types of structures are handled in road projects, including bridges, tunnels, culverts, and retaining walls.

    • Bridges: Overpasses, flyovers, and interchanges are common structures in road projects.

    • Tunnels: Road tunnels are constructed to pass through mountains or under bodies of water.

    • Culverts: These structures allow water to flow under the road, preventing flooding.

    • Retaining walls: Used to support soil and preve...

  • Answered by AI
Round 2 - Technical 
Round 3 - One-on-one 
Round 4 - Technical 
Round 5 - HR 

(1 Question)

  • Q1. How can getting salery privies company Now expect how much
  • Ans. 

    The question is unclear and does not make sense.

    • The question seems to be asking about how to negotiate a higher salary with a previous company.

    • It is important to research industry standards and salary ranges for the position.

    • Highlighting relevant experience, skills, and achievements can help justify a higher salary.

    • Negotiating with confidence and being prepared to provide reasons for the requested salary increase is cr...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Engineer Civil Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Find good company ,good name, safety , customers satisfaction ,quality,job assured & work on free mind.
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Exam for Qs related questions
  • Q2. Excel related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Atten the walk in, write the test, thn face the face to face
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Regarding my interest in the construction field specialization
  • Q2. What will deserve company by you after you getting this opportunity
Round 1 - Technical 

(1 Question)

  • Q1. Give me your introduction? How you get civil engineering? Technical question Salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare bmc and concrete technology
Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Per cubic metre concrete weight
  • Ans. 

    The weight of concrete per cubic metre varies depending on the mix and density.

    • The weight of normal concrete is around 2400 kg/m³

    • Lightweight concrete can weigh as little as 1600 kg/m³

    • Heavyweight concrete can weigh up to 3800 kg/m³

    • The weight of concrete can also be affected by the aggregates used

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't panic.if your talent god always with you

I applied via Walk-in and was interviewed in Sep 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Civil basic Questions will be there

Round 2 - Technical 

(1 Question)

  • Q1. Size of Bricks,available of cement names in market
  • Ans. 

    Brick sizes vary and cement brands are numerous in the market.

    • Brick sizes commonly range from 8 to 12 inches in length and 4 to 6 inches in width.

    • Cement brands available in the market include Ultratech, ACC, Ambuja, and JK Cement.

    • The size of bricks and the type of cement used depend on the specific requirements of the project.

    • The strength and durability of the structure also play a role in determining the size of brick...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary wont be on time cant able to lead a life and no career growth

Top trending discussions

View All
Interview Tips & Stories
6d
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about RPP Infra Projects?
Ask anonymously on communities.

RPP Infra Projects Interview FAQs

How many rounds are there in RPP Infra Projects interview?
RPP Infra Projects interview process usually has 2 rounds. The most common rounds in the RPP Infra Projects interview process are Technical, HR and Resume Shortlist.
How to prepare for RPP Infra Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at RPP Infra Projects. The most common topics and skills that interviewers at RPP Infra Projects expect are Material Management, Civil Engineering, Cost Estimation, Labour Contract and Labour Management.
What are the top questions asked in RPP Infra Projects interview?

Some of the top questions asked at the RPP Infra Projects interview -

  1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types o...read more
  2. How can find out sq length to sk length of culv...read more
  3. What type of structure well handle in road proj...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 11 interview experiences

Difficulty level

Easy 60%
Moderate 40%

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

SYSTRA Interview Questions
4.0
 • 26 Interviews
SPML Infra Interview Questions
3.9
 • 21 Interviews
Bygging India Interview Questions
3.9
 • 13 Interviews
View all

RPP Infra Projects Reviews and Ratings

based on 147 reviews

3.8/5

Rating in categories

3.6

Skill development

3.6

Work-life balance

3.4

Salary

3.2

Job security

3.3

Company culture

3.2

Promotions

3.5

Work satisfaction

Explore 147 Reviews and Ratings
Site Engineer
86 salaries
unlock blur

₹1 L/yr - ₹4.6 L/yr

Civil Site Engineer
54 salaries
unlock blur

₹1.1 L/yr - ₹4 L/yr

Senior Engineer
22 salaries
unlock blur

₹3.2 L/yr - ₹7.5 L/yr

Civil Engineer
14 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Senior Site Engineer
9 salaries
unlock blur

₹3 L/yr - ₹5.1 L/yr

Explore more salaries
Compare RPP Infra Projects with

Ramky Infrastructure

4.2
Compare

McNally Bharat Engineering

4.1
Compare

SYSTRA

4.0
Compare

Techno Electric & Engineering Company

4.0
Compare
write
Share an Interview