i
Voltech
Filter interviews by
PLC is for discrete control; DCS is for continuous processes, offering centralized control and monitoring.
PLC (Programmable Logic Controller) is designed for discrete control applications, such as assembly lines.
DCS (Distributed Control System) is used for continuous processes, like oil refining or chemical production.
PLCs are typically used in manufacturing for tasks like machine automation, while DCS is used in ...
My name means 'peaceful ruler' in Latin.
My name is derived from the Latin word 'Pax' which means peace.
It also has roots in the Roman goddess of peace, Pax.
The name signifies a peaceful and authoritative presence.
Transformer protection refers to the measures taken to prevent damage to transformers from faults or abnormal operating conditions.
Transformer protection devices include overcurrent relays, differential relays, and Buchholz relays.
Overcurrent relays protect against overloads and short circuits.
Differential relays compare the current entering and leaving the transformer to detect internal faults.
Buchholz relays det...
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of two coils of wire, known as primary and secondary coils
Works on the principle of electromagnetic induction
Used to step up or step down voltage levels in electrical circuits
Commonly used in power distribution systems
SPD stands for Standard Operating Procedure. It is a documented guide outlining the steps and activities required to complete a specific task or process.
SPD helps ensure consistency and quality in work processes
It provides a clear outline of responsibilities and expectations
Examples include SOPs for laboratory experiments, manufacturing processes, and customer service protocols
To improve safety culture on site, focus on leadership commitment, employee involvement, continuous training, clear communication, and regular safety audits.
Promote leadership commitment to safety by setting a positive example and actively participating in safety initiatives.
Encourage employee involvement in safety programs by seeking their input, providing training, and recognizing their contributions.
Provide con...
Yes, willing to travel for work-related purposes.
I am open to travel for work-related projects and assignments.
I understand that travel may be required for testing at different locations.
I am flexible and willing to adapt to travel requirements as needed.
My undergraduate studies focused on core engineering principles, including design, analysis, and application of engineering concepts.
Studied thermodynamics, focusing on energy transfer and its applications in engines.
Learned about fluid mechanics, analyzing fluid behavior in various systems, such as pipelines.
Gained experience in circuit design and analysis through hands-on projects in electronics lab.
Participated...
Yes, I am willing and able to go to remote locations for testing and commissioning work.
I have experience working in remote locations and am comfortable with the challenges that come with it.
I am willing to travel and stay on site for extended periods of time if necessary.
I understand the importance of thorough testing and commissioning and am committed to ensuring that the work is done properly, regardless of loc...
Over current relay is set based on the load current and time characteristics.
Determine the maximum load current and time characteristics
Select the appropriate over current relay type and current rating
Calculate the relay settings based on the load current and time characteristics
Adjust the settings to ensure proper coordination with other protective devices
Test the relay to ensure proper operation
The number of C&I instruments in work varies depending on the project requirements and scope.
The number of C&I instruments can range from a few dozen to several hundred in a typical industrial project.
These instruments include sensors, transmitters, controllers, recorders, and final control elements.
Examples of C&I instruments include pressure transmitters, temperature sensors, flow meters, level switches, and control ...
RTD measures temperature using the resistance change of a metal, while thermocouples measure temperature using the voltage generated at the junction of two different metals.
RTD stands for Resistance Temperature Detector, while thermocouple is a temperature sensor made of two different metals.
RTDs are more accurate and stable compared to thermocouples.
RTDs have a linear relationship between resistance and temperature, w...
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
PLC is for discrete control; DCS is for continuous processes, offering centralized control and monitoring.
PLC (Programmable Logic Controller) is designed for discrete control applications, such as assembly lines.
DCS (Distributed Control System) is used for continuous processes, like oil refining or chemical production.
PLCs are typically used in manufacturing for tasks like machine automation, while DCS is used in large...
I applied via LinkedIn and was interviewed in Sep 2024. There were 3 interview rounds.
First round is aptitude test.the test questions topics for numerical solutions, logical reasoning, psychometric etc.
My salary package is competitive and reflects my experience and skills in electrical engineering.
I am looking for a salary in the range of $60,000 to $80,000 per year, depending on the responsibilities.
My previous role offered a package that included bonuses for project completions, which I found motivating.
I believe in aligning my salary expectations with industry standards and the specific demands of the role.
My name means 'peaceful ruler' in Latin.
My name is derived from the Latin word 'Pax' which means peace.
It also has roots in the Roman goddess of peace, Pax.
The name signifies a peaceful and authoritative presence.
I have extensive experience in management and technical development, focusing on team leadership and process optimization.
Led a team of 10 in a software development project, improving delivery time by 30%.
Implemented Agile methodologies, resulting in a 25% increase in team productivity.
Conducted training sessions on new technologies, enhancing team skills and knowledge.
Managed cross-functional teams to streamline opera...
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of two coils of wire, known as primary and secondary coils
Works on the principle of electromagnetic induction
Used to step up or step down voltage levels in electrical circuits
Commonly used in power distribution systems
Transformer protection refers to the measures taken to prevent damage to transformers from faults or abnormal operating conditions.
Transformer protection devices include overcurrent relays, differential relays, and Buchholz relays.
Overcurrent relays protect against overloads and short circuits.
Differential relays compare the current entering and leaving the transformer to detect internal faults.
Buchholz relays detect g...
SPD stands for Standard Operating Procedure. It is a documented guide outlining the steps and activities required to complete a specific task or process.
SPD helps ensure consistency and quality in work processes
It provides a clear outline of responsibilities and expectations
Examples include SOPs for laboratory experiments, manufacturing processes, and customer service protocols
I applied via LinkedIn and was interviewed in Jan 2023. There were 2 interview rounds.
My undergraduate studies focused on core engineering principles, including design, analysis, and application of engineering concepts.
Studied thermodynamics, focusing on energy transfer and its applications in engines.
Learned about fluid mechanics, analyzing fluid behavior in various systems, such as pipelines.
Gained experience in circuit design and analysis through hands-on projects in electronics lab.
Participated in a...
Top trending discussions
The duration of Voltech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 29 interview experiences
Difficulty level
Duration
based on 464 reviews
Rating in categories
Testing & Commissioning Engineer
202
salaries
| ₹1.2 L/yr - ₹8.7 L/yr |
Electrical Testing Commissioning Engineer
115
salaries
| ₹1.5 L/yr - ₹7.8 L/yr |
Senior Testing Commissioning Engineer
81
salaries
| ₹2 L/yr - ₹9.1 L/yr |
Senior Engineer
66
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Senior Commissioning Engineer
43
salaries
| ₹2.5 L/yr - ₹10.5 L/yr |
Polycab Wires
CG Power and Industrial Solutions
C&S Electric
KEI Industries