i
Rohan
Builders
Work with us
Filter interviews by
Defect liability refers to the period during which a contractor is responsible for fixing defects in their work after project completion.
Typically lasts for a specified period, often 12 months after project completion.
Contractors must rectify defects at no additional cost to the client.
Examples include fixing leaks, structural issues, or faulty installations.
Defect liability ensures quality and accountability in c...
Statutory compliance refers to the legal framework within which an organization must operate to ensure adherence to laws and regulations.
Ensuring compliance with labor laws, tax laws, environmental regulations, and other legal requirements
Maintaining accurate records and documentation to demonstrate compliance
Regularly reviewing and updating policies and procedures to align with changing laws
Conducting audits and ...
I address site-related problems by identifying the root cause, developing a solution plan, and coordinating with relevant stakeholders for implementation.
Identify the root cause of the problem
Develop a solution plan
Coordinate with relevant stakeholders for implementation
Regularly monitor the progress of the solution
Dynamic HR professional with over 10 years of experience in talent acquisition, employee engagement, and organizational development.
Over a decade of experience in HR management, focusing on strategic workforce planning.
Successfully led a team to implement a new performance management system, increasing employee satisfaction by 30%.
Expert in developing training programs that enhance employee skills and promote care...
Measurement sheet is prepared by taking off quantities from drawings and specifications.
Review drawings and specifications to identify items to be measured
Take accurate measurements using appropriate tools and techniques
Record measurements in a systematic manner on the measurement sheet
Include relevant details such as dimensions, quantities, and units
Double-check measurements for accuracy and completeness
Organize ...
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.
Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more
It is made by mixing cement, water, and aggregates like sand and gravel
Additives can be included to enhance specific properties of the concrete, such as strength or workability
Once mixed, concrete h...
Deductions for plaster work include wastage, openings, and curing period.
Wastage of materials during application
Deductions for openings such as windows and doors
Curing period for the plaster work
Deduction for shuttering work is the process of calculating and subtracting the cost of temporary formwork used in construction projects.
Deduction for shuttering work is typically calculated based on the area of formwork used.
The cost of shuttering work is deducted from the total billing amount of a construction project.
This deduction accounts for the temporary nature of formwork and is a common practice in constr...
My current CTC is confidential and I would prefer not to disclose it.
My current CTC is subject to confidentiality agreements.
I believe that discussing salary details is not appropriate in this context.
I would prefer to focus on my qualifications and experience relevant to the position.
Bend deduction is the amount of material that is removed from the total length of a piece in order to account for the bending process.
Bend deduction is used in sheet metal bending to calculate the flat length of the material before bending.
It accounts for the stretching and compression of the material during the bending process.
The bend deduction depends on factors like material thickness, bend radius, and bend an...
I applied via Walk-in and was interviewed in Feb 2021. There were 4 interview rounds.
Quality refers to the degree of excellence or superiority of a product or service.
Quality is a measure of how well a product or service meets customer expectations and requirements.
It involves ensuring that the product or service is free from defects or errors.
Quality also includes factors such as reliability, durability, and performance.
Quality can be subjective and may vary depending on the context and industry.
Examp...
The tolerance of sand bulkage refers to the acceptable variation in the volume of sand when it is compacted.
Tolerance of sand bulkage is typically expressed as a percentage.
It is important to measure and control sand bulkage to ensure consistency in construction materials.
The acceptable tolerance may vary depending on the specific application and industry standards.
For example, in concrete production, the tolerance for...
QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA is a process-oriented approach that aims to prevent defects from occurring in the first place.
QC is a product-oriented approach that focuses on identifying defects in the final product.
QA involves activities such as planning, designing, and implementing processes to ensure quality.
QC involves activities such as testing, inspecting, a...
QMS stands for Quality Management System.
QMS is a set of policies, processes, and procedures required for planning and execution of quality control.
It ensures that products or services meet customer requirements and comply with regulations.
QMS includes activities such as quality planning, quality control, quality assurance, and quality improvement.
Examples of QMS include ISO 9001, Six Sigma, and Total Quality Managemen...
I appeared for an interview in May 2025, where I was asked the following questions.
I appeared for an interview in Mar 2025, where I was asked the following questions.
Defect liability refers to the period during which a contractor is responsible for fixing defects in their work after project completion.
Typically lasts for a specified period, often 12 months after project completion.
Contractors must rectify defects at no additional cost to the client.
Examples include fixing leaks, structural issues, or faulty installations.
Defect liability ensures quality and accountability in constr...
Measurement sheet is prepared by taking off quantities from drawings and specifications.
Review drawings and specifications to identify items to be measured
Take accurate measurements using appropriate tools and techniques
Record measurements in a systematic manner on the measurement sheet
Include relevant details such as dimensions, quantities, and units
Double-check measurements for accuracy and completeness
Organize the m...
Our current project billing process involves tracking expenses, labor costs, and materials used to accurately bill clients.
We track expenses such as equipment rentals, subcontractor costs, and travel expenses.
Labor costs are calculated based on hours worked by each team member and their respective rates.
Materials used are documented and their costs are included in the billing.
We ensure all expenses are properly allocat...
I appeared for an interview in Mar 2025, where I was asked the following questions.
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.
Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more
It is made by mixing cement, water, and aggregates like sand and gravel
Additives can be included to enhance specific properties of the concrete, such as strength or workability
Once mixed, concrete harden...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.
BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.
It helps in estimating the quantity of steel required for the project.
BBS is essential for ensuring the structural integrity and strength of the building.
Components of BBS include bending shapes, cutting length,...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
One meter is equal to 39.37 inches.
One meter is equivalent to 100 centimeters.
One inch is equal to 2.54 centimeters.
To convert meters to inches, multiply by 39.37 (100 * 2.54).
Steel density is typically around 7.85 g/cm^3.
Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel can vary depending on the specific alloy composition.
For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
The least count of a dumpy level staff reading is typically 0.01 ft or 1 mm.
The least count is the smallest measurement that can be read on the scale of the dumpy level staff.
For most dumpy levels, the least count is 0.01 ft or 1 mm.
This means that the dumpy level can measure differences in elevation as small as 0.01 ft or 1 mm.
Concrete cover is provided for reinforcement to protect it from corrosion, fire, and other environmental factors.
Concrete cover protects reinforcement from corrosion by preventing exposure to moisture and aggressive chemicals.
It provides fire resistance by acting as a barrier between the reinforcement and the fire.
Concrete cover helps in maintaining the bond between reinforcement and concrete, ensuring structural integ...
Civil engineers at site are responsible for overseeing construction projects, ensuring they are completed safely, on time, and within budget.
Supervising construction activities to ensure compliance with design specifications and safety standards
Managing resources and materials efficiently to meet project deadlines
Collaborating with architects, contractors, and other stakeholders to resolve any issues that may arise
Cond...
Minimum concrete grade for RCC work is M20.
Minimum concrete grade for RCC work is M20 as per IS 456:2000.
Higher grades like M25, M30, M35, etc. can also be used depending on structural requirements.
Concrete grades indicate the compressive strength of concrete after 28 days of curing.
Higher grades are used for structures requiring higher strength like bridges, high-rise buildings, etc.
The density of unit weight of cement is typically around 1440 kg/m^3.
The density of unit weight of cement is commonly around 1440 kg/m^3.
This value can vary slightly depending on the type and brand of cement.
Density is a measure of mass per unit volume, in this case, kilograms per cubic meter.
The slump value of concrete for Normal RCC work is typically between 25-75 mm.
The slump value of concrete for Normal RCC work is usually around 50 mm.
The slump value can vary based on the specific requirements of the project and the mix design.
A higher slump value indicates a more workable concrete mix, while a lower slump value may be used for specialized applications.
It is important to test the slump value of concret...
Top trending discussions
The duration of Rohan Builders interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 69 interview experiences
Difficulty level
Duration
based on 722 reviews
Rating in categories
Senior Engineer
94
salaries
| ₹3.5 L/yr - ₹9.5 L/yr |
Safety Officer
77
salaries
| ₹2.4 L/yr - ₹6.1 L/yr |
Assistant Engineer
54
salaries
| ₹3.5 L/yr - ₹6.5 L/yr |
Junior Engineer
45
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Senior Civil Engineer
43
salaries
| ₹4.5 L/yr - ₹10.1 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties